Professional Documents
Culture Documents
In-Building Coverage Solutions: Kulasekaran. P
In-Building Coverage Solutions: Kulasekaran. P
In-Building Coverage Solutions: Kulasekaran. P
Solutions
KULASEKARAN. P
Technical Specialist - RF ( Inbuilding Radio Network Planner)
Bangalore. (INDIA)
12/13/2005
In-Building Solution
12/13/2005
Topics
1. In building Solution Proposals
2. Planning
3. Measurement
4. Implementation
5. In building acceptance testing
12/13/2005
Quality of Service
Customer requirements > Rx level must be - 80dBm @ 95% Location
Probability
Server from in building solution in dedicated mode > = 90%
Call Setup success rate = 98% in the entire building
Drop Call Rates < = 2%
DL Rx Quality ( 0 2 ) > = 90 % In the entire building
DL Rx Quality ( 0 4 ) > = 95 % In the entire building
Spillage of signals must be < = -85dBm, on the street and the adjacent
buildings
Frequency planned for Indoor coverage must be carefully planned
Parameter settings for IBS must be carefully planned (ex:- hopping frequency,
MAIO, HCS etc.,
12/13/2005
Resources
Customers Radio
Network Planner
RF Survey
Engineer
Customer Site
acquisition team
NETWORK OPERATOR
Can be the same person
Radio Network
Planner
(documentation)
Sub Contractor
12/13/2005
Installation
Planner
Installation
Supervisor
Process flow
In building survey & implementation roll - out
12/13/2005
NOTE : For precise EIRP planning at each antenna, its advisable to use TEMS Transmitter for the
survey, but a professional Radio planner is as good as a TEMS Transmitter.
RF Survey Tools
NOKIA NETMONITOR
ARFCN
12/13/2005
TEMS TRANSMITTER
TOOL
Rx Lvl
Passive Distribution
Solution description
Coverage plan
CAT-5 Distribution
System diagram
Power budget calculation
Proposed antenna location photograph
System layout on floor plan ( ACAD)
Measurement results
12/13/2005
RNP Report
Solution Description
Over view
Network Solution passive coaxial & Antenna distribution or LGC network
Bill of Materials
Details of How many antennas ( Omni, Panel ), Cable type (1/2 or 7/8), Splitters, Couplers
12/13/2005
12/13/2005
10
10 dB Coupler
Design must have similar power distribution & coupling loss to each antenna
12/13/2005
11
2. Coverage plan
BASEMENT
NO SIGNAL
ENTRY
COVERAGE REQUIRED
AREA
12/13/2005
TO BE COVERED BY
OUTDOOR CELL
CLIENT ADDRESS:
sasken
network engineering
CONTACT PERSON:
12
12/13/2005
13
4.27
1.75
3.85
4.34
5.39
5.95
6.44
6.79
4.55
5.39
4.55
3.29
4.55
3.99
2.24
4.34
3.29
3.99
3.08
4.13
3.78
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1
2
2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
2
3
3
9
9
12
12
12
12
18
18
18
18
18
18
18
18
18
18
18
18
12
18
18
Total Loss
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
4 way Loss
way
Through
Loss
61
25
55
62
77
85
92
97
65
77
65
47
65
57
32
62
47
57
44
59
54
Loss 2 way
Tap Loss
BA1
BA2
BA3
BA4
BA5
BA6
GA7
GA8
GA9
GA10
GA11
GA12
GA13
GA14
GA15
GA16
GA17
GA18
GA19
GA20
GA21
7/8
inch
Through
Loss
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
1/2
inch
10 dB
Tap Loss
6 dB
Sl Anten
No na No
Connector
Loss
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6
6
1.5
1.5
1.5
1.5
0
0
0
0
0
0
0
0
0
0
0
0
6
1.5
1.5
Qty
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
10
10
Loss
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
5
5
NOTE:
UPLINK & DOWNLINK Budget are calculated at a distance of 25meters from the Antennas
Body loss = 3 dB
12/13/2005
Indoor Multipath faded margin loss (incase of more partitions) = 6 dB
Total loss = 9 dB
An additional loss of 9 dB has to be taken into account in both uplink and downlink RSSI
Antenna Gain
Directional
Splitter
Ceiling
Length of cable
1
1
1
1
1
1
1
1
1
1
1
1
0
0
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
0
0
Total Antenna
EIRP
losses
(dB)
(dBm)
23.27
20.75
21.35
21.84
22.89
23.45
28.44
28.79
26.55
27.39
26.55
25.29
26.55
25.99
24.24
26.34
25.29
25.99
25.08
28.63
28.28
16.73
19.25
18.65
18.16
17.11
16.55
11.56
11.21
13.45
12.61
13.45
14.71
17.45
18.01
15.76
13.66
14.71
14.01
14.92
11.37
11.72
Up Link (RSSI
at Micro BTS)
-49.48
-46.96
-47.56
-48.05
-49.1
-49.66
-54.65
-55
-52.76
-53.6
-52.76
-51.5
-52.76
-52.2
-50.45
-52.55
-51.5
-52.2
-51.29
-54.84
-54.49
Down Link
(RSSI at
Mobile)
-42.48
-39.96
-40.56
-41.05
-42.1
-42.66
-47.65
-48
-45.76
-46.6
-45.76
-44.5
-41.76
-41.2
-43.45
-45.55
-44.5
-45.2
-44.29
-47.84
-47.49
14
12/13/2005
15
RNP Report
Floor plan with Antenna Location marking
PR O PO SED C A B LES & A N T EN N A
B A SEM EN T
BSP12
NO SIGNAL
BSP13
BCP9
E NT R Y
PR O PO SE D A N TEN N A 'S
PR O PO SED A N TE N N A
4-w ay Splitter
3-w ay Splitter
Panel A ntenna
C eiling A ntenna
C onnectors
C oupler
12/13/2005
2-w ay Splitter
2"
F eeder C able
P RO JE C T : IB C S O L U T IO N
C U S TO M ER N A M E: B SN L
C LIEN T A D DR ESS:
sasken
netw ork engineering
C O N TA C T P ERS ON :
16
NO SIGNAL
ENTRY
sasken
network engineering
CONTACT PERSON:
12/13/2005
17
Planning ( duration )
Pre survey ( discussion with Network operator & coordinator ) 0.5 day
Survey + Measurement ( 1 day for a moderately big building ) 1 person from Operator side also required
System diagram, Antenna location, Power budget calculation etc., ( 1 day Max )
Report preparation in ACAD ( 1 day )
Compilation of the proposal and preparing a final plan ( 1 day )
NOTE : Total about 4.5 days are required for planning and report preparation, but the same can be
squeezed in 3 to 4 days Max, Quicker than this, will be a compromise on quality
12/13/2005
18
Planning of Accessories
Omni antennas
Note: Size & shape of the antenna (round, flat) can vary depending upon customers request
12/13/2005
19
Planning of Accessories
Directional or Panel antennas
Note: Size & shape of the antenna (small, big) can vary depending upon customers request
12/13/2005
20
Planning of Accessories
Splitters & Couplers
2 way
3 way
4 way
Note: Couplers will be same like 2 Way splitters but the output port in the sides are little long from the
other port.
12/13/2005
21
Planning of Accessories
Feeders or Cables
Note: Cable comes without super flex also and that is what is used in most of the IBS, similar to RFX
Leaky cable, but no holes on the corrugation
12/13/2005
22
Implementation
Site in-charge or a Project engineer ( 1 person )
Skilled technician to make connectors ( 1 person )
Sub contractors well versed of cable laying
For an average size building with 30 antennas and 1000 meters of cable can be
completed in 7 days time, provided there is no hindrance from the building owners
Cables, Splitters, Couplers & Antennas ( If possible ) must be named during
installation
Cable lengths to be marked along with the cable names during implementation
Cables to be neatly cable tied at every 2 mts of length
VSWR measurements of all cables( along with antenna connected ) must be noted
down during installation
Clamps are to be provided for ceiling and panel antennas, incase if there is no wall
support
appropriate tools to be used for making connectorisation
12/13/2005
23
Implementation
Example of Coupler & Splitter installation in a cable tray
12/13/2005
24
Implementation
Example of Ceiling antenna installation
12/13/2005
25
Implementation
Example of Panel antenna installation
12/13/2005
26
12/13/2005
27
12/13/2005
28
Acceptance Testing
Materials or Accessories Check
Physically check the implementation ( any loose cabling, physical damage on feeders, antennas
clamped properly etc., )
VSWR check for sample cables ( it is highly impossible to check VSWR for each cable in inbuilding
solution, the reason is we have more than 100 pieces of cable in an average building, testing all the
100 will fetch entire 2 days & more over some cables will be inside the false ceiling )
Check the list of inventorys used in that particular site
Sample check the implemented cable lengths ( Checking all the feeder physically might not be
possible )
Check the power connections of Micro BTS ( Voltage check, Grounding, Fixing etc., )
Feeder cable connected to the output of micro cell has to be grounded properly using grounding kit
Ventilation in the room to be checked
RF Signal Check
Check the signal levels ( Idle mode ) at places mentioned in the RNP report
Check Call Setup, Call quality, Call sustain and Call hand over to Outdoor cells
Check for the in building cell Signal spill over
12/13/2005
29
12/13/2005
30
31