Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 41

REVISIONS

Rev.

Date

Description
REASON FOR REVISION & RESUBMISSION IF ANY

uSGD_Cluster_08
PAC Acceptance Report

SITE ON AIR DATE

14-May-2015

DRIVE TEST DATE

6-June-2015

DRIVE TESTER NAME:

Usman/Aftab

REPORT PREPARED BY:

Junaid Khan

REPORT CHECKED BY:


SUBMISSION DATE:

8-June-2015

PAC Drive Test Report Template

Table of Contents
1

INTRODUCTION.....................................................................................................................................3
1.1

AREA AND CLUSTER OVERVIEW.........................................................................................................3

1.2

CLUSTER MAP LOCATION...................................................................................................................3

1.3

CLUSTER SITE INFORMATION..............................................................................................................3

1.3.1
1.3.2
2

Site Status.................................................................................................................................3
Site Information........................................................................................................................4

SUMMARY OF EVENTS:.......................................................................................................................5
2.1

CS SERVICES.......................................................................................................................................5

2.2

PS SERVICES.......................................................................................................................................5

2.3

DRIVE TEST FAILED EVENTS PLOTS...................................................................................................5

ACCEPTANCE DRIVE TEST KPI RESULTS......................................................................................6

RADIO DESIGN PERFORMANCE PAC TARGETS..........................................................................7

4.1

COVERAGE PERFORMANCE SCANNER MODE...................................................................................7

4.1.1
4.1.2
4.2
4.2.1
4.2.2
4.2.3
4.3
4.3.1

Geographical View of the Drive Test with Legends..............................................7


Bar Charts of Legends......................................................................................................7
QUALITY PERFORMANCE SCANNER MODE (EC/NO).......................................................................8

Geographical View of the Drive Test with Legends..............................................9

PS DATA PERFORMANCE TESTS.....................................................................................................10

5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.1.6
6

Geographical View of the Drive Test with Legends..............................................8


Bar Charts of Legends......................................................................................................8
Pilot Pollution Plot- SCANNER MODE...........................................................................9
BEST SERVER PLOT.............................................................................................................................9

R99 DL Coverage Map by throughput...................................................................................10


R99 UL Coverage Map by throughput...................................................................................11
HSUPA Coverage Map by throughput...................................................................................12
HSPA Coverage Map by throughput......................................................................................13
Drive Test HSDPA CQI Plot...................................................................................................14
Throughputs in Tabular Form.................................................................................................15

OSS KPIS.................................................................................................................................................16
6.1

TARGET KPIS.................................................................................................................................16

6.2

MONITORING KPIS...........................................................................................................................17

CONCLUSION........................................................................................................................................17
THE TEST RESULTS ARE SATISFACTORY. PAC ACCEPTANCE IS REQUESTED.................................................17

2015-06-21

Confidential

Page2, Total41

PAC Drive Test Report Template

1 Introduction
1.1

Area and Cluster overview

2015-06-21

Confidential

Page3, Total41

PAC Drive Test Report Template

1.2

Cluster

Cluster Map Location

RNC

uSGD_Cluster_08

112

2015-06-21

Sites

Sites

Site

Site

Site

Cells

Cell

2G Sites

Planned

Integrated

Faulty

Working

Availability

Planned

Availability

Count

19

19

19

100%

57

100%

19

Confidential

Page4, Total41

PAC Drive Test Report Template

1.3
1.3.1

Cluster Site Information


Site Status

Site

Site

Commission

Alarm

Name

status

Date

Information

uMALW01
uMCPP01
uMDBA01
uMKI001
uMKI002
uMMGR62
uMMSL01
MMW001
MMW002
MMW003
MMW004
MMW005
MMW006
uMMW007
uMNW010
uMNW011
uMPL001
uMPL002
uMPL003

2015-06-21

On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On

Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air

14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15
14-May-15

Confidential

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

Remark

Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm

Page5, Total41

PAC Drive Test Report Template

1.3.2
RNCID

Site Information

Site

Site Name

Cell name

PSC

LAC

Longitude

Latitude

Height

Azimuth

ID

Tilt

Tilt

112

563

uMALW01

uMALW011

416

1827

71.4064

32.366

32

10

112

563

uMALW01

uMALW012

415

1827

71.4064

32.366

32

120

112

563

uMALW01

uMALW013

414

1827

71.4064

32.366

32

200

112

884

uMCPP01

uMCPP011

58

1827

71.4556

32.411

32

100

112

884

uMCPP01

uMCPP012

57

1827

71.4556

32.411

32

180

112

884

uMCPP01

uMCPP013

247

1827

71.4556

32.411

32

320

112

893

uMDBA01

uMDBA011

14

1827

71.3904

32.331

27

112

893

uMDBA01

uMDBA012

47

1827

71.3904

32.331

27

100

112

893

uMDBA01

uMDBA013

46

1827

71.3904

32.331

27

200

112

1220

uMKI001

uMKI0011

19

1827

71.4732

32.448

56

20

112

1220

uMKI001

uMKI0012

1827

71.4732

32.448

56

120

112

1220

uMKI001

uMKI0013

162

1827

71.4732

32.448

56

220

112

1221

uMKI002

uMKI0021

245

1827

71.4832

32.460

42

40

112

1221

uMKI002

uMKI0022

130

1827

71.4832

32.460

30

140

112

1221

uMKI002

uMKI0023

244

1827

71.4832

32.460

30

240

112

1465

uMMGR62

uMMGR621

189

1827

71.5149

32.448

57

20

112

1465

uMMGR62

uMMGR622

191

1827

71.5149

32.448

57

100

112

1465

uMMGR62

uMMGR623

190

1827

71.5149

32.448

42

260

112

1560

uMMSL01

uMMSL011

141

1827

71.3406

32.253

43

100

112

1560

uMMSL01

uMMSL012

197

1827

71.3406

32.253

43

200

112

1560

uMMSL01

uMMSL013

196

1827

71.3406

32.253

29

340

112

296

MMW001

uMMW0011

342

1827

71.5434

32.572

35

50

112

296

MMW001

uMMW0012

344

1827

71.5434

32.572

41

160

112

296

MMW001

uMMW0013

343

1827

71.5434

32.572

34

300

112

297

MMW002

uMMW0021

366

1827

71.5419

32.583

27

112

297

MMW002

uMMW0022

56

1827

71.5419

32.583

27

160

112

297

MMW002

uMMW0023

55

1827

71.5419

32.583

27

280

112

298

MMW003

uMMW0031

69

1827

71.5284

32.577

27

60

112

298

MMW003

uMMW0032

340

1827

71.5284

32.577

27

150

112

298

MMW003

uMMW0033

341

1827

71.5284

32.577

25

290

112

299

MMW004

uMMW0041

249

1827

71.5548

32.538

42

60

112

299

MMW004

uMMW0042

331

1827

71.5548

32.538

42

140

112

299

MMW004

uMMW0043

332

1827

71.5548

32.538

42

320

112

300

MMW005

uMMW0051

39

1827

71.5712

32.587

32

80

112

300

MMW005

uMMW0052

18

1827

71.5712

32.587

32

160

112

300

MMW005

uMMW0053

330

1827

71.5712

32.587

32

260

112

301

MMW006

uMMW0061

296

1827

71.5322

32.589

25

60

2015-06-21

Confidential

Page6, Total41

PAC Drive Test Report Template

112

301

MMW006

uMMW0062

295

1827

71.5322

32.589

25

190

112

301

MMW006

uMMW0063

111

1827

71.5322

32.589

25

280

112

302

uMMW007

uMMW0071

339

1827

71.5179

32.571

25

40

112

302

uMMW007

uMMW0072

112

1827

71.5179

32.571

23

180

112

302

uMMW007

uMMW0073

113

1827

71.5179

32.571

23

310

112

297

uMNW010

uMNW0101

89

1827

71.55244

32.59113

32

60

112

297

uMNW010

uMNW0102

88

1827

71.55244

32.59113

32

260

112

297

uMNW010

uMNW0103

355

1827

71.55244

32.59113

32

340

112

239

uMNW011

uMNW0111

412

1827

71.5288

32.6106

36

40

112

239

uMNW011

uMNW0112

426

1827

71.5288

32.6106

38

110

112

239

uMNW011

uMNW0113

450

1827

71.5288

32.6106

36

210

112

1670

uMPL001

uMPL0011

365

1827

71.3642

32.289

32

10

112

1670

uMPL001

uMPL0012

346

1827

71.3642

32.289

45

100

112

1670

uMPL001

uMPL0013

345

1827

71.3642

32.289

36

190

112

1671

uMPL002

uMPL0021

323

1827

71.3724

32.283

32

80

112

1671

uMPL002

uMPL0022

322

1827

71.3724

32.283

32

200

112

1671

uMPL002

uMPL0023

227

1827

71.3724

32.283

23

280

112

1672

uMPL003

uMPL0031

87

1827

71.3715

32.299

40

40

112

1672

uMPL003

uMPL0032

464

1827

71.3715

32.299

37

180

112

1672

uMPL003

uMPL0033

463

1827

71.3715

32.299

36

240

2 Summary of Events:
2.1
Service

CS Services

Terminal

Call

Calls

Call

Call

IRAT

Successful

HO

Successful

SMS

Successful

Attempts

Established

Drop

Block

HO

IRAT HOs

Attempts

HOs

Attempts

SMS

Softer/Soft

Softer/Soft

255

255

NA

NA

Attempts
Voice

MO

2015-06-21

194

193

Confidential

100%

Page7, Total41

PAC Drive Test Report Template

2.1

PS Services

Service

PDP Activation Attempts

PDP Activation Success

PS Drops Number

HO

Successful

Attempts

HOs

Softer/Sof

Softer/Soft

t
R99 UL

13

13

224

224

R99 DL

13

13

222

222

HSDPA/HSPA+

14

14

223

223

HSUPA

13

13

228

228

2015-06-21

Confidential

Page8, Total41

PAC Drive Test Report Template

2.1

Drive Test Failed Events Plots

2015-06-21

Confidential

Page9, Total41

PAC Drive Test Report Template

3 Acceptance Drive Test KPI Results


Details

KPI Parameter

KPI Value

KPI Target

Coverage and Quality


Scanner

CPICH RSCP >= -90dBm

96%

90.0% of samples -90dBm

CPICH Ec/Io >= -12db

96%

90.0% of samples -12db

CS Voice Call/Video Call/SMS


voice

Call Setup Success Rate

99.48

99.0%

short call

Call setup time

4.02

99% Call setup < 4.5sec

Drop Call Rate

voice

0.52

1.5%

Handover Success Rate (IRAT)

100 %

96.0%

BLER (DL)

1.17

Reporting KPI. Plot needs to be

long call

put below.

(locked
on 3G)

Handover Success Rate (Soft, Softer, Inter

100

99.0%

CS Location Update Success Rate

100

99.0%

Number of Cells in Active Set

100

80% 3

RNC)

PS and HSPA Services


PS and

PS session completion success rate

HSPA

downlink
PDP context activation success rate

100

95.0%

100

98.0%

301

56kbps

303

150kbps

3588

1500kbps

2264

500kbps

including attach

R99 UL

File Transfer Service throughput (3MB file)

R99 DL
HSDPA

File Transfer Service throughput (DL 25MB


& UL 10MB file)

HSUPA

2015-06-21

Confidential

Page10, Total41

PAC Drive Test Report Template

4 Radio design performance PAC Targets


4.1
4.1.1

Coverage performance Scanner mode


Geographical View of the Drive Test with Legends

CS
Scan

Drive Test Plots: RSCP


Average (dB)

-81.31

Mode

2015-06-21

Confidential

Page11, Total41

PAC Drive Test Report Template

CS
Scan

Drive Test Plots: RSCP


Average (dB)

-81.31

Mode

2015-06-21

Confidential

Page12, Total41

PAC Drive Test Report Template

4.1.2

Bar Charts of Legends

2015-06-21

Confidential

Page13, Total41

PAC Drive Test Report Template

4.2
4.2.1

Quality performance Scanner Mode (Ec/Io)


Geographical View of the Drive Test with Legends

CS
Scan

Drive Test Plots: Ec/Io


Average (dB)

-6.31

Mode

2015-06-21

Confidential

Page14, Total41

PAC Drive Test Report Template

4.2.2
CS
Scan

Drive Test Plots: Ec/Io


Average (dB)

-6.31

Mode

2015-06-21

Confidential

Page15, Total41

PAC Drive Test Report Template

4.2.2

Bar Charts of Legends

2015-06-21

Confidential

Page16, Total41

PAC Drive Test Report Template

4.3
4.3.1

Best Server Plot


Geographical View of the Drive Test with Legends

CS

Drive Test Plots: Best Server

Scan
Mode

2015-06-21

Confidential

Page17, Total41

PAC Drive Test Report Template

CS

Drive Test Plots: Best Server

Scan

2015-06-21

Confidential

Page18, Total41

PAC Drive Test Report Template

Mode

2015-06-21

Confidential

Page19, Total41

PAC Drive Test Report Template

5 PS Data Performance Tests


5.1.1

R99 DL Coverage Map by throughput

Service

Drive Test Plots: R99 DL Throughput


Average (303 kbps)

2015-06-21

Confidential

403

Page20, Total41

PAC Drive Test Report Template

R99 DL
Through
put

Service

Drive Test Plots: R99 DL Throughput


Average (303 kbps)

2015-06-21

Confidential

403

Page21, Total41

PAC Drive Test Report Template

R99 DL
Through
put

2015-06-21

Confidential

Page22, Total41

PAC Drive Test Report Template

Bar Charts of Legends

2015-06-21

Confidential

Page23, Total41

PAC Drive Test Report Template

5.12 R99 UL Coverage Map by throughput

Service

Drive Test Plots: R99 UL Throughput


Average (301kbps)

2015-06-21

Confidential

403

Page24, Total41

PAC Drive Test Report Template

R99 UL
Throughput

Service

Drive Test Plots: R99 UL Throughput


Average (301kbps)

2015-06-21

Confidential

403

Page25, Total41

PAC Drive Test Report Template

R99 UL
Throughput

2015-06-21

Confidential

Page26, Total41

PAC Drive Test Report Template

5.1.2

HSUPA Coverage Map by throughput

Service

2015-06-21

Drive Test Plots: HSUPA Throughput

Confidential

Page27, Total41

PAC Drive Test Report Template

HSUPA

Average (2264 kbps)

5712

Throughput

Service

Drive Test Plots: HSUPA Throughput


Average (2264 kbps)

2015-06-21

Confidential

5712

Page28, Total41

PAC Drive Test Report Template

HSUPA
Throughput

2015-06-21

Confidential

Page29, Total41

PAC Drive Test Report Template

2015-06-21

Confidential

Page30, Total41

PAC Drive Test Report Template

5.1.3

HSPA Coverage Map by throughput

Service

Drive Test Plots: HSPA Throughput


Average (3588 kbps)

HSPA

13707

Throughput

2015-06-21

Confidential

Page31, Total41

PAC Drive Test Report Template

Service

Drive Test Plots: HSPA Throughput


Average (3588 kbps)

HSPA

13707

Throughput

2015-06-21

Confidential

Page32, Total41

PAC Drive Test Report Template

2015-06-21

Confidential

Page33, Total41

PAC Drive Test Report Template

5.1.4

Drive Test HSDPA CQI Plot

2015-06-21

Confidential

Page34, Total41

PAC Drive Test Report Template

2015-06-21

Confidential

Page35, Total41

PAC Drive Test Report Template

5.1.5

3G Voice BLER DL Plot

2015-06-21

Confidential

Page36, Total41

PAC Drive Test Report Template

2015-06-21

Confidential

Page37, Total41

PAC Drive Test Report Template

5.1.6

Number of Cell in Active Set Plot

2015-06-21

Confidential

Page38, Total41

PAC Drive Test Report Template

2015-06-21

Confidential

Page39, Total41

PAC Drive Test Report Template

6 OSS KPIs
6.1

TARGET KPIs

Daily KPI Date & Time: From 02-08-2014 to 06-08-2014 @ (5days


aggregated)
Service

KPIs

KPI

Target Value

Value
AMR Voice
Services

CS64 Services

AMR Call Setup

99.72%

97.0% Daily

Success Rate
AMR Drop Call Rate

0.17%

0.8%.

MPD

119.34

Reporting KPI in PAC.

CS64 Call Setup

99.79%

Reporting KPI

0.00%

Reporting KPI

Success Rate
CS64 Drop Call Rate
Data Services

R99 Call Setup

99.21%

Success Rate

Combined

CSSR

target

for all PS services i.e.


97.0%

daily.

Separate

reporting will be done for


all services.
R99 Drop Call Rate

0.04%

Combined DCR target for


all PS services i.e.
1.2%

daily.

<

Separate

reporting will be done for


all services.
HSDPA/HSPA+ Call

99.62%

Setup Success Rate

Combined

CSSR

target

for all PS services i.e.


97.0%

daily.

Separate

reporting will be done for


all services.
HSDPA/HSPA+ Drop

0.5%

Call Rate

Combined DCR target for


all PS services i.e.
1.2%

daily.

<

Separate

reporting will be done for


all services.
HSUPA Call Setup
Success Rate

99.60%

Combined

CSSR

target

for all PS services i.e.


97.0%

daily.

Separate

reporting will be done for


all services.

2015-06-21

Confidential

Page40, Total41

PAC Drive Test Report Template

HSUPA Drop Call Rate

0.53%

Combined DCR target for


all PS services i.e.
1.2%

daily.

<

Separate

reporting will be done for


all services.
Mobility

Soft/Softer Handover

99.98%

99.0%

Success Rate
3G to GSM Hard

98.63%

97.0%

Handover Success
Rate
PS UMTS to GPRS cell

99.06%

95.0%

reselection success
rate
Traffic

Combined 2G+3G

20879.11

equal or better

Voice Traffic
RTWP

6.2

Average RTWP

-104.09

< -100dBm

Monitoring KPIs
KPIs

uSGD_CLust
er_8

R99 DL Throughput (Kbps)

74.65

R99 UL Throughput (Kbps)

29.58

HSDPA/HSPA+ Throughput (Kbps)

1387.18

HSUPA Throughput (kbps)

1132.00

Average DL user Throughput

664.03

Availability

100%

DL Code peak Utilization

100%

CE peak Utilization

14.06%

Blocking Due to Power Congestion

0.00%

7 Conclusion
The Test results are satisfactory. PAC Acceptance is requested

2015-06-21

Confidential

Page41, Total41

You might also like