Weekkly Checklist
Weekkly Checklist
Weekkly Checklist
DATE / TARIKH :
INSPECTED BY /
DIPERIKSA OLEH :
TIME / MASA:
This form should be completed for every work location by Main Contractor's Site Supervisor / Representatives before any work can
proceed and shall be available at site during work in progress. The duty completed form shall be kept in project's safety file
Borang ini hendaklah di isi sepenuhnya sebelum memulakan keja di tapak binaan oleh Penyelia / Wakil dari Kontraktor Utama dan sentiasa kekal di tapak kerja.Borang yang telah siap diisi mestilah di
simpan sebagai rekod di dalam fail keselamatan projek.
Reference shall be made to FMA 1967, OSH 1994, TNB Safety & Health Manual & Procedures
Rujukan hendaklah berpandukan kepada FMA 1967, OSH 1994, Manual & Prosedur Keselamatan dan Kesihatan TNB dan Manual &Peosedur Kesihatan & Keselamatan UTG-JN
No heavy loads located near to the trench and excavated soil was 1m away from edge.
Tiada beban berat yang di letakkan berhampiran lurah serta tanah yang dikorek diletakan 1m jauh dari
tebing.
REMARKS
CATATAN
Signature / Tandatangan :
Signature / Tandatangan :
Name / Nama :
Name / Nama :