Machine Cost
Required LF per Day
Downtime / Loading Inefficiency
Operator(s) Cost per hour
Production Rate feet per hour
Hours Machine runs per Day
Work Days per month
Production Rate LF per month
Tooling Cost
Tooling life (average linear feet)
TOTAL
LABOR
Machine Cost per person (Sector, etc.)
Feet per hour per man (average)
Downtime / Inefficiency
Labor Cost per hour
Number of Men to equal machine
Production Rate per man per Day
Hours per day shop must run
Tooling Cost (Est)
Tooling life (average linear feet)
TOTAL
Cost per LF
$ 600.00
$ 6.82
$ 0.49
$ 1,760.00
$ 20.00
$ 1.43
$ 616.00
$ 8.00
$ 0.50
$ 2,976.00
$ 34.82
$ 2.42
Cost per LF
$ 0.08
$ 5,797.65
$ 34.51
$ 4.71
$ 1,320.00
$ 7.50
$ 1.07
$ 7,211.53
$ 42.57
$ 5.85
4.0
22
1,232
$ 3,000.00
6000
$ 3,000.00
5
15.00%
$ 20.00
1.6
34
8
$ 1,500.00
1400
***