Debur Heat Treat Job Start Finish Start Finish Processing Time

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Job

Start

Debur
Finish

1
2
3
4
5
6

0
2
5
12
15
16

2
5
12
15
16
24

Processing
Time

Start

2
3
7
3
1
8

2
8
13
17
25
30

Heat Treat
Finish
8
13
17
25
30
32

a.Select the job with shortest processing time .It is job 5 with a time of one hour.
b.Since ,the time is at the Debur,schedule job 5 first.Eliminate job 5 from further considera
c. Job 1 and Job 6 have the next shortest time. Job 1 is with a time of 2 hrs at the Debur sc
Job 6 is with a time of 2 hrs at the heat treat.Since it is at heat treat schedule it last at 6 an

d. Job 2 and Job 4 both have the next shortest time of 3 hrs at the Debur .Since both are at
Thus, scheduling Job 4 at 3rd place and job 2 at 4th place after it.

e. Finally assign Job 3 to remaining 5th position and the result is

1st
5

2nd
1

3rd
4

Heat Treat
Processing
Time
6
5
4
8
5
2
1st
5

2nd

3rd

4th

5 with a time of one hour.


liminate job 5 from further consideration
s with a time of 2 hrs at the Debur schedule it at the second position and eliminate it from further consideration
s at heat treat schedule it last at 6 and eliminate it from further consideration.
1st
2nd
3rd
5
1

1st
2nd
5
1
3 hrs at the Debur .Since both are at Debar we can choose any one of them first to be placed at 3rd postion foll
ace after it.
1st
5

e result is

4th
2

5th
3

6th
6

2nd
1

3rd
4

4th
2

5th

6th

t from further consideration


4th

5th

6th

3rd

4th

5th

5th

6th
6

6th
6
e placed at 3rd postion followed by the other one at the next 4th position.