This document provides a step-by-step process for placing duct in Revit MEP by linking an architectural file, placing mechanical equipment on floor plans, connecting duct from the equipment to air terminals, adjusting duct width and offsets, using flex duct to connect main ducts to air terminals, and drawing vertical ducts on floor or ceiling plans rather than sections or elevations.
This document provides a step-by-step process for placing duct in Revit MEP by linking an architectural file, placing mechanical equipment on floor plans, connecting duct from the equipment to air terminals, adjusting duct width and offsets, using flex duct to connect main ducts to air terminals, and drawing vertical ducts on floor or ceiling plans rather than sections or elevations.
This document provides a step-by-step process for placing duct in Revit MEP by linking an architectural file, placing mechanical equipment on floor plans, connecting duct from the equipment to air terminals, adjusting duct width and offsets, using flex duct to connect main ducts to air terminals, and drawing vertical ducts on floor or ceiling plans rather than sections or elevations.
Abstract This document will provide a stepbystep process to place duct in Revit MEP. Procedure: 1. Link architectural file into Revit MEP file.
2. Floor plan, place mechanical equipment.
3. Connect duct from mechanical equipment to air terminal 4. Click on Home tab HVAC panel Duct Change duct width, height and offset to equipments inlet height (ex: 2) , then click apply. Click on the equipments inlet, draw a segment of the duct, and change the offset to the height of the ceiling (ex: 9)
Click on Home tab
HVAC panel Flex Duct Place flex duct from the main duct to the top of the air terminal Lesson Learned: It is difficult to place vertical ducts on the section or elevation plan. The 3D plan wont let you do any duct editing. Therefore, the best way to draw vertical ducts is to do it on the floor plan or ceiling plan. You should also change to visibility range of the plan to make sure the ducts shows up on the plan.