This document contains information about Hitachi Elevator Engineering (Malaysia) Sdn. Bhd., including their head office and Penang office contact details. It is a letter from Hitachi Elevator Engineering to Ehsan Bina Sdn. Bhd. regarding proposed relocation of hall call buttons for lifts B2-SL-05 and B2-FL-01 due to site constraints. The letter includes a CC list of other parties being sent the information without enclosures.
This document contains information about Hitachi Elevator Engineering (Malaysia) Sdn. Bhd., including their head office and Penang office contact details. It is a letter from Hitachi Elevator Engineering to Ehsan Bina Sdn. Bhd. regarding proposed relocation of hall call buttons for lifts B2-SL-05 and B2-FL-01 due to site constraints. The letter includes a CC list of other parties being sent the information without enclosures.
This document contains information about Hitachi Elevator Engineering (Malaysia) Sdn. Bhd., including their head office and Penang office contact details. It is a letter from Hitachi Elevator Engineering to Ehsan Bina Sdn. Bhd. regarding proposed relocation of hall call buttons for lifts B2-SL-05 and B2-FL-01 due to site constraints. The letter includes a CC list of other parties being sent the information without enclosures.
EHSAN BINA SDN. BHD. L2- 1 & 2, Wisma Ehsan Bina No. 3, Jalan Kuchai Maju 12 Kuchai Entrepreneurs Park 58200 Kuala Lumpur Attention :
Mr. Derick Ong
Fax: 03 7980 9311
CADANGAN PEMBANGUNAN FASA 1 YANG MENGANDUNG BLOCK 1
PANGSAPURI SERVIS 30 TINGKAT DENGAN 1 TINKGAT MEZANIN (206 UNIT), BLOCK 2 PANGSAPURI SERVIS 32 TINGKAT DENGAN 1 TINGAKT MEZANIN (174 UNIT) DAN KEMUDAHAN PANGSAPURI BERSERTA 3 TINGKAT BASEMEN TEMPAT LETAK KERETA DI LOT 73 DAN PT 208, DARIPADA CADANGAN PEMBANGUNAN KOMESRIL (PANGSAPURI SERVIS, PEJABAT DAN KOMPLEKS MEMBELI-BELAH) DI ATAS PT207, PT208 DAN LOT73, JALAN SS21/60, DAMANSARA UTAMA, MUKIM SUNGAI BULOH, DAERAH PETALING, PETALING JAYA, SELANGOR DARUL EHSAN UNTUK TETUAN DUTAMASA SDN BHD -Relocation of Hall Call Button for (Lift B2-SL-05, B2-FL-01) We are pleased to submit herewith our sketches to reflect relocation of hall call button due to site constraints. Trust the above is in order. Yours faithfully HITACHI ELEVATOR ENGINEERING (M) SDN. BHD.