Introduction
Revolutionized HMA removal, leveling and overlay
preparation
Considerable changes over the last 30 years
Definitions
Cold Planing
removal of the existing pavement to the desired depth
Cold Milling
removal pavement surface using drum-mounted
carbide steel cutting bits
Diamond grinding
Restore ride
Improve friction
Not to remove material
Grooving resist hydroplaning
Removal of rutting
Restoration of curb line
Restoration of cross slope
Restoration of surface friction
Mass removal of HMA
Roughened surface for improved bond
Distresses Treated by CP
Raveling
Bleeding
Shoulder drop off
Rutting
Corrugations
Shoving
Design Considerations
Construction Considerations
Pavement to be resurfaced
Construction Considerations
How will grade be controlled?