Professional Documents
Culture Documents
3x350 MW Non EPC Works
3x350 MW Non EPC Works
3x350 MW Non EPC Works
1.
Water,
3.
4.
Administration building
5.
Service Building.
6.
7. Canteen building.
8.
9.
Workshop building.
16.
17.
18.
for
General
Manager,
Managers,
Engineering
Officers,
Tank, Parks , Compound Wall, Colony Roads & Drains, Water supply,
Sewage treatment and disposal works and Electrical sub-station.
19. Construction of main approach road from the State / National highway to the
plant main gate. A distance of about 4 Kms.
20. MGR Work shop (Merry Go Round Workshop for CHP Marshalling Yard).
21. Marshalling Yard inside and outside the plant boundaries.
22. Horticulture and Landscaping inside the plant.
23.
24.
25
Laboratory for testing coal, fuel oil, turbine oil, transformer oil, ash,
ambient air quality, stack emission and other effluents, steam and water
also. Sampling units including necessary samplers and monitoring kits
etc.
26.
Weigh Bridge
27.
Bull Dozers
28
29.