Professional Documents
Culture Documents
Power Plant 6 MW PT MSSP Shut-Down Report
Power Plant 6 MW PT MSSP Shut-Down Report
SHUT-DOWN REPORT
NO
BOILER MECH
1
2
3
4
5
6
7
8
9
10
11
12
JOB DESCRIPTION
OILER MECH
Ganti Liner inclined conveyor yang rusak
Perbaiki plat bar lantai furnace yang lepas
Perbaiki /las kebocoran pada sudut sisi kiri dan kanan bagian belakang dinding boiler
Ganti manual valve by pass main steam (Valve passing)
Ganti packing manual valve steam inlet sooth blower
Check dan ganti packing steam drum left side (Packing bocor)
Ganti shaft gland packing feed water pump.2 (Gland packing bocor)
Ganti pipa blowdown boiler yang bocor
Ganti liner inclined conveyor ke fuel storage
Perbaiki daun conveyor fuel screw feeder yang rusak
Cleaning ash pit
Perbaiki refractory furnace rear side (Re-casting)
1-Mar-15
HANDLING UNIT
STATUS
REMARK
Maintenance
Maintenance
Maintenance
Maintenance
Maintenance
Process
Maintenance
Maintenance
Maintenance
Maintenance
Process
Process
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
1-Mar-15
00.00 01.00 02.00 03.00 04.00 05.00 06.00 07.00 08.00 09.00 10.00 11.00
FUEL CONSUMPTION
No
1
2
3
4
DESCRIPTION
Power Generating from genset 1 & 2
Fuel oil consumption
Fuel ratio
Solid Fuel Shell for start-up Boiler
UNIT
kwh
liter
liter/kwh
kg
VALUE
23,012
6,259
0.27
16,000