Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

POWER PLANT 6 MW PT MSSP

SHUT-DOWN REPORT

NO
BOILER MECH
1
2
3
4
5
6
7
8
9
10
11
12

POWER PLANT 6 MW PT MSSP


SHUT-DOWN REPORT

JOB DESCRIPTION

OILER MECH
Ganti Liner inclined conveyor yang rusak
Perbaiki plat bar lantai furnace yang lepas
Perbaiki /las kebocoran pada sudut sisi kiri dan kanan bagian belakang dinding boiler
Ganti manual valve by pass main steam (Valve passing)
Ganti packing manual valve steam inlet sooth blower
Check dan ganti packing steam drum left side (Packing bocor)
Ganti shaft gland packing feed water pump.2 (Gland packing bocor)
Ganti pipa blowdown boiler yang bocor
Ganti liner inclined conveyor ke fuel storage
Perbaiki daun conveyor fuel screw feeder yang rusak
Cleaning ash pit
Perbaiki refractory furnace rear side (Re-casting)

1-Mar-15
HANDLING UNIT

STATUS

REMARK

Maintenance
Maintenance
Maintenance
Maintenance
Maintenance
Process
Maintenance
Maintenance
Maintenance
Maintenance
Process
Process

Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish
Finish

ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok

REAL TIME SHUTDOWN -JOBS


NO
BOILER MECH
1
2
3
4
5
6
7
8
9
10
11
12
TOTAL : 18 HOURS

REAL TIME SHUTDOWN -JOBS


JOB DESCRIPTION
BOILER MECH
Boiler Cooling Down by IDF running
Ganti Liner inclined conveyor yang rusak
Perbaiki plat bar lantai furnace yang lepas
Perbaiki /las kebocoran pada sudut sisi kiri dan kanan bagian belakang dinding boiler
Ganti manual valve by pass main steam (Valve passing)
Ganti packing manual valve steam inlet sooth blower
Check dan ganti packing steam drum left side (Packing bocor)
Ganti shaft gland packing feed water pump.2 (Gland packing bocor)
Ganti pipa blowdown boiler yang bocor
Perbaiki daun conveyor fuel screw feeder yang rusak
Boiler Star-up
Turbine Satrt-up & sinschronize
TOTAL : 18 HOURS

1-Mar-15
00.00 01.00 02.00 03.00 04.00 05.00 06.00 07.00 08.00 09.00 10.00 11.00

12.00 13.00 14.00 15.00 16.00 17.00 18.00

FUEL CONSUMPTION
No
1
2
3
4

DESCRIPTION
Power Generating from genset 1 & 2
Fuel oil consumption
Fuel ratio
Solid Fuel Shell for start-up Boiler

UNIT
kwh
liter
liter/kwh
kg

VALUE
23,012
6,259
0.27
16,000