Plumbing Code Permits - d1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NATIONAL PLUMBING CODE OF THE PHILIPPINES

PERMITS
LORENZO RAY NAZ TANAEL, rla, rmp, renp, rreb

PERMITS

Secure permit

from the Office of the Building

APPLICATION FOR PERMIT


REQUIREMENTS

Official

Scope of work
Vicinity map
Use or occupancy
Plans, drawings, diagrams,
Computations, technical specification
Signature of owner/permitee

Signature & seal of a registered & licensed master plumber


PLANS AND SPECIFICATIONS

All plumbing plans, drawings, diagrams, design analysis/computations as


required, technical specifications, bills of materials and other required documents
for all types of occupancy shall be prepared, signed and sealed by a Registered
and Licensed Master Plumber without limitations, pursuant to Republic Act 1378
as amended and shall be submitted in six (6) sets of the aforementioned
requirements with each application for a permit.
Retention of Plans

1 set Administrative Authority (OBO)

2 sets Owner, ( 1 set @ the jobsite)

VALIDITY OF PERMIT

1 year if not commenced

120 days if suspended or abandoned


INSPECTION
General

NO portion of any plumbing system shall be concealed until inspected


approved.
SPECIAL PROVISION

Seal

and

You might also like