Retainaing Structures Infra

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Date:

LORDS INSTITUTE OF ENGINEERING AND TECHNOLOGY


I-YEAR M.TECH II SEMESTER (R13)-1 MID TERM EXAMINATIONS, July 2015

RETAINING STRUCTURES
(Branch-INFRASTRUCTURES ENGINEEING)
Time: 02 hours

Max.Marks:40

Part A as 04 compulsory question for 16 marks


Part B with 3 questions to be answered out of 5 questions each question for 8 marks

PART-A

4 X 4=16Marks

1) Write in detail about sheet piles


2) Explain the construction method of cantilever sheet piling
3) Write in detail about anchored sheet piling
4) What is moment reduction method

PART-B

3 X 8=24 Marks

5) Explain the failure mechanism in the soil


6) Compare the static analysis and seismic analysis
7) What do you understand by the term Diaphragm wall and slurry support
8) how do you check the stability of the braced cut
9) Define a) soil nailing b) diapharm wall

You might also like