Steps:: - To Draw The (Deflection, Momen) Along The Pile Length Using The Elastic Solution
Steps:: - To Draw The (Deflection, Momen) Along The Pile Length Using The Elastic Solution
Steps:: - To Draw The (Deflection, Momen) Along The Pile Length Using The Elastic Solution
Steps :
-To draw the (deflection,momen) along the pile length using the elastic solution :
1- pile deflection
: Xz = Ax{Qg*(T^3)/Ep*Ip}
2- moment on pile
: Mz = Am*Qg*T+Bm*Mg
3- Shear force
: Vz = Av*Qg+Bv(Mg/T)
4- soil reaction
: P'x = Ap'*(Qg/T)+Bp'*(Mg/T^2)
5- Chareceristics length of pile
: T = {(Ep*Ip)/nh}^1/5
6- Nondimentional depth
:
Z = z/T
L/T
4.8
Epile
=
F(pile)
=
nh
=
Length (pile) =
I(pile)
=
T
=
Rigid pile
1.40E+07
2.10E+04
60
15
0.001257
3.114851
Kn/m^2
Kn/m^2
Kn/m^2
ms
ms^4
ms
Pile crossection
ms
ms
Square
Circular
B
0
0
D
0.4
0.001257
Ipile =
depth
z
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
206.25
Qg
force applied =
kn.m
mm
deflection coefficient
Z
0.0
0.2
0.3
0.5
0.6
0.8
1.0
1.1
1.3
1.4
1.6
1.8
Ax
2.435
1.644
1.086
0.544
0.247
0.0335
-0.055
-0.065
-0.04
-0.05
-0.0295
-0.009
Bx
1.623
0.873
0.448
0.112
0.03
-0.077
-0.08
-0.066
-0.03
-0.028
-0.014
0
Qg
4.81E-02
4.81E-02
4.81E-02
4.81E-02
4.81E-02
4.81E-02
4.81E-02
4.81E-02
4.81E-02
4.81E-02
4.81E-02
4.81E-02
Mg
1.43E-04
1.43E-04
1.43E-04
1.43E-04
1.43E-04
1.43E-04
1.43E-04
1.43E-04
1.43E-04
1.43E-04
1.43E-04
1.43E-04
5.00E+01
1.00E+02
1.17E+02
7.92E+01
5.23E+01
2.62E+01
1.19E+01
1.60E+00
-2.66E+00
-3.14E+00
-1.93E+00
-2.41E+00
-1.42E+00
-4.33E-01
Am
0
0.459
0.693
0.772
0.696
0.35
0.2
0.18
0.009
0
-0.0165
-0.033
Bm
1
0.976
0.885
0.688
0.498
0.15
0.098
0.01
-0.023
-0.042
-0.034
-0.026
Kn.m
Moment
2.06E+02
2.03E+02
1.85E+02
1.44E+02
1.05E+02
3.20E+01
2.08E+01
2.62E+00
-4.72E+00
-8.66E+00
-7.06E+00
-5.47E+00
Moment distribution
1.50E+02
-1.00E+02
0.00E+00
0
2
de pth
De pth
0.00E+00
0
kn
Moment coefficient
Deflection
deflection distribution
-5.00E+01
28
1.00E+02
2.00E+02
3.00E+02