Katlego Mabote - 16 TOCPA - April 2015 - South Africa - With Corrections

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

www.tocpractice.

com

16th International Conference of the


TOC Practitioners Alliance - TOCPA
www.tocpractice.com

Johannesburg, South Africa

The Critical Conflicts of Efficiency


measurements and TOC in Mining

Katlego Mabote, TOC Optimization Manager


South Africa Lonmin
23th April 2015
16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

Katlego Mabote Resume

16th International Conference of the TOC Practitioners Alliance - 2015/07/17


TOCPA

www.tocpractice.com

Critical Conflicts in Application of TOC in Mining


Conversations to be Outlined
What to Change to

What are the Critical Conflicts

Variability to Remove W Effect Analysis


3 Focus Areas of the Topic

Efficiency Measurements in Application


TOC approach to Change
Mindset required for Change

Investing in TOC as a strategic approach to identify bottlenecks and sustainable leadership to ensure
profitable future and excellence, How Lonmin is investing in TOC and the results Lonmin is achieving
16th International Conference of the TOC Practitioners Alliance - 2015/07/17
TOCPA

www.tocpractice.com

Questions we Answer
Shaft Revenue Potential
4 Year Tons performance-Trend Graph
MO s Picture View History
Project Initial Bottleneck Identified Flow Model
Project Initial Bottleneck Identified Management`s View
Project Initial Bottleneck Identified Supervisor`s View
Project Saffy Outstanding Project 2015
4

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

Revenue Potential: 4BShaft


Section 1
Panels

Value of ONE Blast:


R185k, Less 15% TVC

R250 000
Section 2
Panels

4B Shaft
83 Panels
R 21 m per day

Section 3
Panels

Section 4
Panels

Section 5
Panels

Shift the
conversations from
the hundreds and
thousands to the
Millions

Crew Salary:
R250 000 per month
Total Crew Salaries:
R24m per month
Material Costs:
<R1000 000 per Day
Winch Cost:
R110 000 each

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

Total Shaft Where we where? Performance

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

MO Section 41 Johan Kemp


TOP Bottlenecks

Development
Constraint on 6,7?
Blast on Mesh
No Panels

UG2

Underground Stores

MO Section 41

1.
2.
3.

Development
Blast on Mesh
No Panels

Belt
Tips
Level 6

Le vel 6

230t

230t

Fault
Level 7

Level 7

230t

History Tons Trend

Belt
Tips

230t

Half Level Bottleneck


Development

Potential Revenue

Action Plan
Task

By Who

By
When

1,6
Million/Day
Panels to be
Blasted

10

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

Unpacking the Flow Model


Management View
ROWLAND SHAFT

Call:

8000t
Shaft
Schedule

Skip: 25t
Reef 600t/h
Waste 480t/h

15E

Main
Stores
Guaranteed
Availability

Plant
Stock
Pile

Product ion Crews:

1,0 km

Vertical & Decline Shaft System


- Men & Material

EXPLOITATION
1. Shaft Schedule
2. Additional Chairs on Chair Lift
3. Extra Deck on Mary -Anne
4. Centralised Blasting
5. Man Carriages on 16, 17, 18 Levels

Op timised Half Level:


5 Produc tion crew s (each producing
550m2 Mer, 540m2 UG2,
Reef 14000t/m-800t/d
5 Reef rais e c rews ,
3 Raises holed.
One Flat end & Travelling way crew
(producing 35m/m, 1500t/m). Flat end
5 raises ahead of raise crews,

Bu ffer Store per H/L:

16

Agreed list, Including Wi nches


Stock for 4-5 days
Replenished by Logi stics,
2x per week
Engineering Spares
Well Managed

17
18
19

Cag e:

TOC Operational Flow Model


2013-03-18

ID ENTIFIED CONSTR AINT

Shaft Store
1-2 Weeks

69 Panels in Mer & UG2


5 White areas

3,3 km

Reef: 190 000t/m, 8000 t/d


AIM for: 9500t/d
Waste: 1000t/d

20

Grout
Plant

Cyclone
Plant?

5 R a is e L in e s S t o p in g

3 R ais e s
Holed

5 R ais e s in
D e v e lo p m e n t

D ro p R a is e

Bo x

T ra ve l W ay

F la t E n d

HL
Store

22

180 people
14 min cyc le
to 26 lev el
(Increase to 230)

21
22

DR
Bl as t

23

Vent ila tion


Zones:

24
1600t

DR
D r i ll

Wa s te
Pr o du c t io n T o n s

Support
Pumping

Wa s te To n s

R a is e T o ns

Reef

25

Flow / HL

26

26 l ev el
1,2 km

29

Cross Tramming:
3x locos, 63t / span
200t in 40 min, 300t/h
Reef and Waste
ore passes 100t - 200t
3 hours flow

Drop R ai se
Constraint

28

3x 250t
Decline belt
1200t/h

Slusher
Progress
Constraint

Reef : 500-800t/d
Waste: 75-100t/d

27

SUBORDINATION Projects:
30

1,

31

km

Gondola

Chair Lift

40-50 Cars/d

600 people /h

Engineer ing
Workshop per
Level

1.
2.
3.
4.
5.
6.
7.
8.

Face Time
Compressed Air Column
Labour Unavailable
Drop Raising (Longer term)
Relationships (Strategic)
ATM & Kios k
Grout infrastructure
Material Supply Logistics

16th International Conference of the TOC Practitioners Alliance - 2015/07/17


TOCPA

www.tocpractice.com

Unpacking the Flow Model


Shift Boss s` View

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

Defining the Current Structure and leadership model

Definition TOC within : Improving Capacity and Scope of making more money and
creating an enabling environment

REFRAMING
Local Efficiency & Cost World Frameworks towards a
Production Flow
Framework
16th International Conference of the TOC Practitioners Alliance - 2015/07/17
TOCPA

www.tocpractice.com

Defining the Concept of The WAR ROOM

16th International Conference of the TOC Practitioners Alliance - 2015/07/17


TOCPA

www.tocpractice.com

The TOC Change and the Results


Lets Unpack
Rowland Shaft Total Tons
250,000

Indication of the world of efficiency, World less for More and the
World of WHY Approach
NOW
200,000

Variation
to Big
150,000
Tons

Then

6M mov ave

100,000

Linear (Tons)

Six Sigma and Lean Interventions

The World of efficiency

50,000

Recession time

W Effect on the Revenue loss is estimated @ 30% of the 200 000


tons amounting 6 Million /month and cumulative Year by Year

Oct-06
Dec-06
Feb-07
Apr-07
Jun-07
Aug-07
Oct-07
Dec-07
Feb-08
Apr-08
Jun-08
Aug-08
Oct-08
Dec-08
Feb-09
Apr-09
Jun-09
Aug-09
Oct-09
Dec-09
Feb-10
Apr-10
Jun-10
Aug-10
Oct-10
Dec-10
Feb-11
Apr-11
Jun-11
Aug-11
Oct-11
Dec-11
Feb-12
Apr-12
Jun-12
Aug-12
Oct-12
Dec-12
Feb-13

During recession time the world ask business to find new answer to Production, cost
savings and re engineering and apply the concept of less for More.

12

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

TOC the Clear Results ROI

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

The Results- Comparison

The Results- Comparison


1.
2.
3.
4.

Low Variability
Upward trend
Movement from Non performance to performance
A profit Game
th

14

16 International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

The Conflict NO 1A (The We and US)


Local vs Global
Parent to Child Conversation
rather Parent to Parent

The World of the We


and Us

Visible
The World of I
think and you
DO

Invisible to Management

Definition TOC within : Improving Capacity and Scope of making more money and
creating an enabling environment
The world of Rule and Order
The world SOP

REFRAMING
How to rescue business leadership from the recession time and begin to
think like business Man not Victims of recession more so Like business
Victors
16th International Conference of the TOC Practitioners Alliance - 2015/07/17
TOCPA

www.tocpractice.com

The Conflict NO 1B (No Young Executive Mind-set


Fixed vs Change World )

VS

Levels of
Work

35
years

50
years

Years
16th International Conference of the TOC Practitioners Alliance - 2015/07/17
TOCPA

www.tocpractice.com

The Conflict NO 2 (The World of what to think


Not How to think) The World of Produce to Stock not by Order
10

10

10

10

10

10

16

15

14

10

13

12
F

STOP

START / DO

Manage EFFICIENCY

Manage FLOW

Control Everything

Control Leverage Points

Manage Silos

Flow of the System as a


Whole

Manage by Budget

Manage the Constraint(s)

Individual KPIs

Buffer Management

Cost world (Input control)

Throughput world (Lost


revenue)

Management by Numbers

Management by Means
(What)

People just work for a


salary and must be
controlled
(Efficiency driven)

People are intelligent


and want to perform
(Leadership, Care & Growth)

Low morale and spirit

Positive and enthusiastic


culture
17

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

East 3

The Conflict NO 3 ( The Lack of the Executive View) and Business Unusual

4B

The 10 10 Chain Balanced Capacity Production Design

Hossy

Saffy

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

The Conflict N0 5( The Lack of Buffer


management System)
Plant
Stock
Pile

Shaft
Schedule

5 R a is e L in e s S t op in g

3
Ra i s e s
Ho led

5 R a is e s i n
De v e l o pm e nt

Bo x

D r op R a is e

T ra ve l W a y

F la t E nd

10 10 10 10 10 10
Skip

DR
B l as t

W as t e
P r o d u c t io n T o n s

Ra is e T o n s

DR
Dr il l

W as te T on s

Re e f

Production HL's
Main
Stores

Grout
Plant

Cage

Shaft Store

Support
Pumping

TOC principles non existences


1. No Buffer management system
2. No concept of the War Room
3. Primary and Secondary Chain
not designed for TOC

Decline belt

Cross Tramming

Gondola

Chair Lift

16th International Conference of the TOC Practitioners Alliance - 2015/07/17


TOCPA

www.tocpractice.com

The Conflict NO 6 ( The Finance reporting vs Revenue


Calculation) The Language Sap system
(Innovation is squeezed out)
NON PERFORMING ZONE
Shafts Achieving 60 % of the Budgets

PERFORMING ZONE
Shafts Achieving 40% of the Budgets

How the project trial was commissioned


20

16th

International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

The Conflict NO 7 (The W Effect Impact


Principle Efficiency vs Through -Put)
Buffer Management System

September W effect

Buffer Management System


1.
2.
3.

Engineering Buffer
Material Buffer
People Buffer

No Buffer
2 Weeks Buffer
Buffer

Performance against TOC (5 to 10) % above Plan


W Effect Analysis October

16th International Conference of the TOC Practitioners Alliance - 2015/07/17


TOCPA

www.tocpractice.com

The Conflict NO 8 (The leadership dilemma)


TRAINING FALLS VICTIM TO SHORT-TERM PRESSURES

16th International Conference of the TOC Practitioners Alliance - TOCPA

www.tocpractice.com

Defining What needs to be Changed

1.
2.
3.

Defining What needs to be Changed


Leadership Structure TOC enabling environment
TOC Flow principles to be entrenched
Promotion of Economic Business Competency

16th International Conference of the TOC Practitioners Alliance - 2015/07/17


TOCPA

www.tocpractice.com

The ANSWER to the Solutions-Measurements


1. Overall flow of tons
2. Rate of the identified bottleneck
3. Status of the primary buffers feeding the
bottleneck and its effects on flow stability
4. Status of the protective capacity
5. Visibility of the systems reality & Changes
6. Spirit / Vibe / Dynamics of the shaft
7. Level of understanding of the TOC concepts

16th International Conference of the TOC Practitioners Alliance - 2015/07/17


TOCPA

www.tocpractice.com

The TOC is a Sustainable approach Moving Forward


The Conclusion

25

16th International Conference of the TOC Practitioners Alliance - TOCPA