Project:

Location:

ETAP

Page:

7.5.0

Date:

30-06-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: RA
penyulngKampusKedonganan

SUMMARY
System Indexes
SAIFI

7.0748 f / customer.yr

SAIDI

16.6318 hr / customer.yr

CAIDI

2.351 hr / customer interruption

ASAI

0.9981 pu

ASUI

0.00190 pu

EENS

153.315 MW hr / yr

ECOST

0.00 $ / yr

AENS

1.8472 MW hr / customer.yr

IEAR

0.000 $ / kW hr

SAIFI
SAIDI
CAIDI
ASAI
ASUI
EENS
ECOST
AENS
IEAR

System Average Interruption Frequency Index


System Average Interruption Duration Index
Customer Average Interruption Duration Index
Average service Availability Index
Average Service Unavailability Index
Expected Energy Not Supplied
Expected Interruption Cost
Average Energy Not Supplied
Interruption Energy Assessment Rate