Professional Documents
Culture Documents
Form Vat Pham Dau
Form Vat Pham Dau
Tn sn phm
Ni dung sn phm u
VN150111-0201
EGR HOUSING
Khun m i D3
Part No
Part Name
VN150111-0250
Affected Models
EGR HOUSING
Lot No.
Process
Check
Date
Special Remarks
Description
Sn phm khun D6
Route: Supplier --> DENSO PI --> Prod --> Final Ins --> PI ( to keep for 6 months)
Form No.
Revised
SUPPLIER
Issued by QA
Administrator
F.QI_PI_P_SQAM-01_10
03 rd
Apr 2014
CLASSIFICATION
1. Initial flow control item
2. Modification (Design change)
3. Process change
4. Temporary use
5. Die Deviation item
6. Sorted parts
REFERENCES
NOTE
Deviation Qty
Supplie Qty
Stock
Measuring Unit
*Attach sheet to initial flow control or early
stage control items
hm khun D6
months)
Part (Product) Edition, Chapter 4, Section 4.3
Part No
Part Name
VN150111-0250
Affected Models
EGR HOUSING
Lot No.
Process
Check
Date
Special Remarks
Description
Sn phm khun D4
Route: Supplier --> DENSO PI --> Prod --> Final Ins --> PI ( to keep for 6 months)
Form No.
Revised
SUPPLIER
Issued by QA
Administrator
F.QI_PI_P_SQAM-01_10
03 rd
Apr 2014
CLASSIFICATION
1. Initial flow control item
2. Modification (Design change)
3. Process change
4. Temporary use
5. Die Deviation item
6. Sorted parts
REFERENCES
NOTE
Deviation Qty
Supplie Qty
Stock
Measuring Unit
*Attach sheet to initial flow control or early
stage control items
hm khun D4
months)
Part (Product) Edition, Chapter 4, Section 4.3
Part No
Part Name
VN150111-0190
Affected Models
EGR HOUSING
Lot No.
Process
Check
Date
Special Remarks
Description
Route: Supplier --> DENSO PI --> Prod --> Final Ins --> PI ( to keep for 6 months)
Form No.
Revised
SUPPLIER
Issued by QA
Administrator
F.QI_PI_P_SQAM-01_10
03 rd
Apr 2014
CLASSIFICATION
1. Initial flow control item
2. Modification (Design change)
3. Process change
4. Temporary use
5. Die Deviation item
6. Sorted parts
REFERENCES
NOTE
Deviation Qty
* For deviation, design change or process
change, attach sheet to the first lot of items.
Supplie Qty
Stock
Measuring Unit
*Attach sheet to initial flow control or early
stage control items
hm GC trn Line 5
months)
Part (Product) Edition, Chapter 4, Section 4.3