PROJECT KEY PERFORMANCE INDICATO

KPI
value

efficiency

speed

MEASURE
maximise

maximise

complexity minimise

overall KPI

scope
time
cost
risk

cost
time

PLANNED
200 land(ha)
$
4.00 AUD $
$

maximise scope
time

innovation maximise

impact

scope
cost

minimise

risk
cost

4.00 AUD $
214 days

1.00

1.00

200 land(ha)
214 days

1.00

3.3 mean risk


4.00 AUD $
$

1.00

risk
time

3.3 mean risk


214 days

1.00

risk
scope

3.3 mean risk


200 land (ha)

1.00

maximise s^3
ctr
planned actual
200
210
214
178
4
3.6
3.3
3.3

2832.0589068253

INDICATOR-SAMPLE 2
ACTUAL
210
$ 3.60
$

3.60 AUD $
178
days
210
178

land (ha)
AUD $

land (ha)
days

16.67%

8.20%

26.24%

3.3 mean risk


3.60 AUD $

11.11%

3.3 mean risk


178
days

-16.82%

3.3
210

mean risk
land (ha)

5.00%

35.33%
4379.468845761