ENMAS GB POWER SYSTEMS PROJECTS LTD

(EPC DIVISION)
MOM-PRE ORDER VENDOR MEETING
PROJECT:

1 x 30MW SJSPL,Barbil,Odisha

DATE OF MEETING:

04/08/2014

PLACE OF MEETING:

Enmas GBs Office, Chennai

PACKAGE:

Ventilation

FORM - 1.2
SHEET:1 of 2

REFERENCE:
MEMBERS PRESENT:
FOR ENMAS

FOR M/s.Pleasant Systems(PS).

1.Mr.K.Gopinath

1. .Mr .S.Chandrasekhar

2.Mr.R.Sridharan

2.

3.Mr.Ragunath

3.

4.

4.

POINTS OF DISCUSSIONS DURING THE MEETING

S.No.

EGB COMMENTS VIA MAIL DT 25/07/2014

MEETING RESOLUTION

1.

For Toilet in TG Building at EL(+) 0 M - One number 378 Agreed by PS and same
shall be incorporated in the
CMH capacity and two numbers smaller exhaust fans
revised offer.
conventionally used in Toilet rooms to be adopted.

2.

For Toilet in TG Building at EL(+) 9 M - Two numbers total Agreed by PS and same
shall be incorporated in the
capacity of fan 1020 CMH and two numbers smaller exhaust
revised offer.
fans conventionally used in Toilet rooms to be adopted.
Agreed by PS and same

3.

For Ground Hopper Tunnel 585 cu.m has been indicated as shall be incorporated in the
revised offer.
585 sq.m to be corrected.

4.

BFP Area Exhaust Fan capacity requirement of 8850 CMH to by PS.


be offered as two number fans.

2x50% fans will be offered

5.

Ash conveying compressor room offer of one number 1810 Noted and same shall be
incorporated in the revised
CMH is same of External MCC room Compressor which is
offer.
repeated. Hence S.No 12 to be removed.
Noted and same shall be

6.

Gravity Lover for External MCC room - Compressor room to incorporated in the revised
offer.
be removed.

7.

Supports for ducts as required to be in Supplier scope to


confirm.

Agreed by PS.

ENMAS GB POWER SYSTEMS PROJECTS LTD


(EPC DIVISION)
MOM-PRE ORDER VENDOR MEETING
8.

Capacity & Qty of fans to be revised while accommodating


the above comments.

FORM - 1.2
SHEET:2 of 2

Noted and same shall be


incorporated in the revised
offer.

We are submitting the layout of TG Hall, Remote MCC &


Tunnel for your duct work estimation. Also we had done
preliminary duct routing for TG Building same is also
attached for your information purpose only. Actual routing to
be submitted from your end.
10. Please consider Instrument air compressor at TG Building
two numbers & Conveying air compressors at External MCC
room two numbers hot air ducting from compressor outlet to
building outside. Layout indicated in respective layout
drawings.
11. Under Exclusion point no 4, 5 , 6 & 9 are irrelevant to the
offer, kindly remove.

Not received by PS. Same


shall be sent by EGB for
planning purpose.

12. The ducts has to be painted to avoid corrosion, please confirm

Ducts shall be GI MOC &


outside building shall be
provided with Tar wrapping.
Same shall be in PS scope.
Agreed by PS.

9.

13. Electrical power requirement will be 3 wire i.e, without


neutral please confirm.

Noted and same shall be


incorporated in the revised
offer. Compressor GA
drawing shall be provided by
EGB.
Noted and same shall be
corrected in the revised offer.

14. Pre-Filters, Rain Cowl , Bird Screen , Supports as required for Agreed by PS.
all supplied fans shall be in Supplier scope. To confirm.

DOCUMENTS RECEIVED
1.

3.

5.

2.

4.

6.