Bugetary Estimate Tojo Vikas

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Annexure-A

Summary of Geo Technical Investigations

S. N.

Description

Barrage
Unit

Rate

Intake
Unit

INR

Tunnel

Rate

Depth

INR

(m)

Unit

Surge Shaft
Rate

Depth

INR

(m)

a) upto 50
m

9,900

b) upto 100 m

11,000

b) upto
100 m

11,000

In-situ permeability tests at


every 5m intervals or change
in strata Using single/double
packer in rock and over
burden.

No.

2,000

No.

2,000

No.

Per Hole

30,000

Per Hole

30,000

Per
1,00,000
Hole

Per
Mobilization &Demobilisation Drilling
4 Charges for equipments
Rig

9,900

b) upto 200 m

2,00,000

Unit

Rate

INR

9,900

9,900

Shifting charges for the


machines from one location
to the other

Power House

Rate

a) upto 50 m

Carrying out Diamond Core


Drilling (NX Size hole) with
Double/Triple Tube Core
Barrel with Hydraulic Feed
Rotary Drilling Machine, in Per mtr.
overburden
&
bedrock, upto 50
including
stacking
&
m
preservation of rock cores in
core boxes & collection of
rock core samples for
laboratory tests.

Per mtr.
upto 50 m

Unit

11,200

b) upto
200 m

2,000

No.

Per
1,00,000
Hole

Penstock
Unit

INR

Rate

INR

Per mtr.
upto 50
mtr.

9,900

No.

9,900

No.

2,000

No.

2,000

Per Hole

30,000

Per
40,000
Hole

11,200

2,000

You might also like