MATERIAL RETURN SLIP

NSRP Complex Project


Return Requested By :
Subcontractor PV- PV ENGINEERING
Name :

Slip No. MRS -

MAI THE TOAN

Date :

4/14/2015

Date

4/14/2015

We would like to return the under-listed materials to the warehouse for the following cause of return.
No Further Use (Surplus)

x After Blasting

Damage Replaced

Field Change

Returned

Others Reasons

Received By Material Control Team

No.

Item Code

Material Description

Size M/Unit Qty

P02A-000GZ

90 degree elbow ASTM A234 Grade WPB


Seamless ASME B16.9 BW Long radius

EA

P61B-002LJ

Flange WN ASTM A105 Class 300 ASME


B16.5 RF

EA

Usable Unusable

Remarks

Returned By

Received By

Consturction Supervisor or Authorized

Material Control Supervisor

Name
Date

Sign.

JGCS Consortium - ZONE2


FORMAT : MC-007

MATERIAL RETURN SLIP


NSRP Complex Project
Return Requested By :
Subcontractor :

Slip No.

Name :

Date :

MRS -

Date

We would like to return the under-listed materials to the warehouse for the following cause of return.
No Further Use (Surplus)

After Test

Damage Replaced

Field Change

Returned
No.

Item Code

Material Description

Others Reasons

Received By Material Control Team


Size

M/Unit

Qty

Usable

Unusable

Remarks

Returned By

Received By

Consturction Supervisor or Authorized

Material Control Supervisor

FORMAT : MC-007

Name
Date

Sign.

JGCS Consortium - ZONE2

FORMAT : MC-007