Location
Fill connection at east boat landing (not in use)
Fill connection to T 1
Fill connection to T 2
Tank T 1 inlet
Tank T 1 outlet
Tank T 2 inlet
Tank T 2 outlet
P-1/P-2 common suction line
P-1 suction from T-2 tank (alternative)
P-1 suction
P-1 discharge
P-1 discharge
P-2 suction
P-2 discharge
P-2 discharge
RV 2874 outlet
Position
Closed
Closed
Closed
Open
Open
Open
Open
Open
Closed
Closed
Open
LO
Open
Open
Open
LO
IG 1001
IG 1002
Closed
Closed
2) Check that the storage tank T-1/T-2 contains adequate supply of demulsifier and
refill as necessary.
3) Ensure that ulitility gas system is in normal operating mode and that utility gas
supply is available to pump.
4) Check that the pumps are calibrated for the required injection rate.
4) Open the gas supply valve to the pump to start the duty pump.
5) Slowly increase the stroke by adjusting the speed controller and observe the
pump discharge pressure according to the rate required.
6) Stop the pump by closing the gas supply valve upon completing the injection of
the target amount.
7) Close the pump suction and discharge valve and biocide storage tank outlet
valve to the pump.
8) Confirm with SOR upon completing of biocide injection activity.
9) Perform housekeeping and keep record of the actities in log book.