Professional Documents
Culture Documents
Problem Statement For T.E Petrochemical Batch 1-Roll No. 1-19 Group 1 - Roll No. 1-5
Problem Statement For T.E Petrochemical Batch 1-Roll No. 1-19 Group 1 - Roll No. 1-5
1-19
Group 1- Roll No. 1-5
ABC company wants to start the manufacturing of nitrobenzene. The plant may be
assumed to operate 330 days per year.
The objectives are as follows:
1. Literature search regarding properties, uses and applications and different
methods of production of nitrobenzene
2. Market demand of Nitrobenzene
3. Selection of one of the method of production based on comparision
4. Decide the plant capacity
5. To determine the flowrates and composition of streams, raw material
requirement in the process (mass balance)
6. To determine the energy requirement (energy balance)
7. Block flow diagram and process flow diagram