PROPOSED WATER SUPPLY FOR HOUSING DEVELOPMENT AT PTD

105758,105762, 105765 AND PTD 105771 PHASE 7 TO PHASE 13, MUKIM


TEBRAU, JOHOR BAHRU, JOHOR DARUL TAKZIM FOR MESSRS CRESCENDO
DEVELOPMENT SDN BHD

NO

TOPIC

1.0

INTRODUCTION

2.0

PURPOSE OF APPLICATION

3.0

SOURCE OF WATER SUPPLY

4.0

SERVICE RESERVOIR

5.0

ANALYSIS OF PIPE RISING MAIN

PAGE

APPENDIX
1 SPAN Certificate
2 Pressure test result from SAJ
3 - KM Approval Plan
DRAWING

Ketua Jabatan Perancangan


PZ000239

ID PROJEK :

SAJ Holdings Sdn Bhd

Tuan,
SAJ STANDARD DRAWINGS FOR PIPEWORKS AND SAJ STANDARD
SPECIFICATION FOR PIPEWORKS
PEMBANGUNAN

: CADANGAN PEMBANGUNAN PERUMAHAN DI ATAS


SEBAHAGIAN LOT PTD 105758, 105762, 105765

DAN
PTD 105771
FASA/MUKIM/DAERAH

: MUKIM TEBRAU, DAERAH JOHOR BAHRU

NAMA PEMAJU
NAMA PERUNDING

: CRESCENDO DEVELOPMENT SDN BHD


: PERUNDING MRM

Adalah disahkan bahawa rekabentuk kerja-kerja pemasangan paip untuk


pembangunan di atas telah mengambil kira keperluan standard berikut :
a. SAJ STANDARD DRAWINGS FOR PIPEWORKS (REVISED DEC
2013)
b. SAJ
STANDARD
SPECIFICATIONS
FOR
PIPEWORKS(SAJH
WS/PW/001 REV 1)
Bersama ini pula disertakan lukisan-lukisan yang tidak termasuk dalam SAJ
standard drawings for pipeworks yang digunakan dalam rekabentuk untuk
pembangunan ini :
Bil
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Tajuk Lukisan
No Lukisan
Key Plan, Location Plan
JT RM 1/1
Site Layout Plan
UD/BC/LO-01
Section Plan
UD/BC/LO-02
Architectural Detail of Suction Tank
UD/BC/ST/AR-01 TO 05
Details of Altitude Valve and Sampling UD/BC/ST/DET-01
Point
Architectural Detail of Reservoir
UD/BC/HT/AR-01 TO 05
Details of Valve Chamber
UD/BC/HT/DET-01
Details of Flow Meter and Signboards
UD/BC/HT/DET-02
Footing and Ground Floor Plan
UD/BC/PH-01
Basement and Roof Plan
UD/BC/PH-02
Plan and Section 1-1 of Pump House
UD/BC/PH-03
Section 2-2, Elevation A, B and C of Pump UD/BC/PH-04
House
Standard Reservoir and Suction Tank UD/BC/STDDetails
01,03,04,05&06

__________________
P. ENG (M)
Tandatangan dan cop.
Tarikh : ___________________