Rab Pengerjaan Tower Mini Cme Triangle 20 Meter Site Vale Pt. Inco Pomala 8 No. Item Material / Upah Sat
Rab Pengerjaan Tower Mini Cme Triangle 20 Meter Site Vale Pt. Inco Pomala 8 No. Item Material / Upah Sat
8
No.
Sat
SEMEN
sak
PASIR COR
m3
SUPLIT
m3
PASIR PASANG
m3
PASIR URUG
m3
KERIKIL
m3
AIR
ltr
MULTIPLEK
lbr
KASO
btg
PAKU
kg
KAWAT BENDRAT
kg
11
btg
12
btg
13
BESI KS 10mm
btg
14
BESI KS 12mm
btg
15
BESI KS 16mm
btg
16
BESI KS 8mm
btg
17
SEMEN SIKAGROUT
sak
18
BATU BATA
bh
19
BATU BELAH
m3
20
PAPAN
lbr
21
ALAT BANTU
ls
22
kg
23
TANAH URUG
m3
24
btg
PENGERJAAN TOWER MINI CME TRIANGLE 20 METER SITE VALE PT. INCO POMALA
TOTAL
No.
Deskripsi Pekerjaan
20
1,340,000
200,000
Galian tanah
400,000
200,000
200,000
0
1500
200,000
120,000
25
35,000
15,000
10
10
18,000
11
20
95,000
12
10
45,000
13
10
70,000
14
10
128,544
15
10
170,000
16
49,770
17
115,500
18
19
10,300
350,000
20
10
40,000
21
300,000
22
2.0048
100,000
23
65,000
25
450,000
26
27
4706814
28
29
30
31
Ereksi tower
Pengecatan tower
32
33
47
Sewa Molen
48
Sewa Vibrator
49
50
Sewa Stamper
ripsi Pekerjaan
Satuan
Harga (Rp)
Ls
250,000
m3
30,000
15,000
m3
25,000
m3
20,000
m3
100,000
kg
1,000
m2
25,000
Ls
300,000
Ls
150,000
m2
10,000
m2
10,000
ls
750,000
ke luar lokasi
an Pondasi shelter
Lbr
15,000
Btg
10,000
Set
200,000
4,000
m2
2,000
m3
20,000
m3
40,000
m3
60,000
ls
250,000
m3
140,000
m2
2,000
m3
20,000
m3
20,000
Kg
100
Ls
1,500,000
kg
1,000
kg
600
Ls
100,000
Ls
3,500,000
hr
300,000
hr
250,000
hr
150,000
m2
300,000
an Bak control