RAB PENGERJAAN TOWER MINI CM

8
No.

Item Material / Upah

Sat

SEMEN

sak

PASIR COR

m3

SUPLIT

m3

PASIR PASANG

m3

PASIR URUG

m3

KERIKIL

m3

AIR

ltr

MULTIPLEK

lbr

KASO

btg

PAKU

kg

KAWAT BENDRAT

kg

11

BESI BETON POLOS 12 mm

btg

12

BESI BETON POLOS 8 mm

btg

13

BESI KS 10mm

btg

14

BESI KS 12mm

btg

15

BESI KS 16mm

btg

16

BESI KS 8mm

btg

17

SEMEN SIKAGROUT

sak

18

BATU BATA

bh

19

BATU BELAH

m3

20

PAPAN

lbr

21

ALAT BANTU

ls

22

CAT HITAM (MOWILEX)

kg

23

TANAH URUG

m3

24

BESI SIKU 5x5 Cm

btg

PENGERJAAN TOWER MINI CME TRIANGLE 20 METER SITE VALE PT. INCO POMALA

LIST UPAH PEKERJ


Jumlah

TOTAL

No.

Deskripsi Pekerjaan

20

1,340,000

Upah Kerja Bowplank

200,000

Galian tanah

400,000

Urugan kembali tanah

200,000

Buangan tanah ke luar lokasi

200,000

Upah Lapisan pasir bawah pondasi dipadatka

Upah Kerja Cor beton

0
1500

200,000

Upah Kerja Besi

120,000

Upah Begesting + Bongkar

25

35,000

Penyetelan angkur dan base plate

15,000

10

Upah Grouting pedestal di bawah base plate

10

18,000

11

Upah Pasang Bata

20

95,000

12

Upah Pekerja Acian

10

45,000

13

Upah Pembuatan Pondasi shelter

10

70,000

14

Upah Pemasangan Panel Pagar BRC

10

128,544

15

Upah Pemasangan Tiang Pagar BRC

10

170,000

16

Upah Pemasangan Pintu Pagar BRC

49,770

17

Upah Pemasangan Kawat Duri

115,500

18

Urugan pasir bawah

19

Upah Urug Pasir Pasang

10,300

350,000

20

Upah Pasang Aanstamping

10

40,000

21

Upah Kerja Batu Kali

300,000

22

Pembersihan lahan (site clearing)

2.0048

100,000

23

Upah rabat beton

65,000

25

Upah pemadatan pasir

450,000

26

Upah Urugan Kerikil

27

Upah Urug Batu Pecah

4706814

28
29

Upah Bongkar Muat Material Tower

30
31

Ereksi tower
Pengecatan tower

32

Upah pengecoran Bak control

33

Upah ME & Grounding

47

Sewa Molen

48

Sewa Vibrator

49

Sewa pompa air

50

Sewa Stamper

LIST UPAH PEKERJAAN

ripsi Pekerjaan

Satuan

Harga (Rp)

Ls

250,000

m3

30,000

15,000

m3

25,000

m3

20,000

m3

100,000

kg

1,000

m2

25,000

kur dan base plate

Ls

300,000

pedestal di bawah base plate : Sika Gr

Ls

150,000

m2

10,000

m2

10,000

ls

750,000

ke luar lokasi

pasir bawah pondasi dipadatkan tebal

an Pondasi shelter

gan Panel Pagar BRC

Lbr

15,000

gan Tiang Pagar BRC

Btg

10,000

gan Pintu Pagar BRC

Set

200,000

gan Kawat Duri

4,000

m2

2,000

m3

20,000

m3

40,000

m3

60,000

ls

250,000

m3

140,000

m2

2,000

m3

20,000

m3

20,000

Kg

100

Ls

1,500,000

kg

1,000

kg

600

Ls

100,000

Ls

3,500,000

hr

300,000

hr

250,000

hr

150,000

m2

300,000

han (site clearing)

Muat Material Tower

an Bak control

You might also like