1. PLANT DETAILS
GENERATOR SYSTEM CONSISTS OF TURBOGENERTOR, EXCITER,
GENERATOR
PROTECTION, EXCITATION CONTROL SYSTEM.
NAME PLATE DETAILS
RATED DATA & O/P
TURBO GEN.
MAIN EXCITER
PILOT EXCITER
APPARENT POWER
588
MVA
-----65 KVA
ACTIVE POWER
500 MW
3780 KW
-----CURRENT
16166 A
6300 A
195 A
VOLTAGE
21 + 1.05 KV
600 V
220 + 22 V
FREQUENCY
50 HZ
-----400 HZ
PF
0.85(LAG)
----------STATOR WDG CONN
YY
--------HYDROGEN PRESS
3.5 BAR
--------CONT PERM UNBAL
8 %
----------LOAD
RATED FIELD
-----------VOLTAGE
340 V
CURRENT
4040 A
2. TESTING OBJECTIVE
TO TEST THE CHARACTERISTICS OF GENERATOR AND REACTIVE
CAPABILITY RESPONSES OF GENERATOR.
i)
MEASUREMENT OF WINDING , INSULATION RESISTANCE
ii) OPEN & SHORT CIRCUIT CHARACTERISTICS
iii) REACTIVE CAPABILITY CURVE RESPONSE CHECKING
3.PROPOSAL
I
SHORT CIRCUIT CHARACTERISTIC
GENERATOR PHASE TERMINALS ARE SHORTED TOGETHER.
MACHINE IS EXCITED AT THE FULL SPEED OF PRIME MOVER(STEAM
TURBINE). A CHARACTERISTIC CURVE IS PLOTTED BETWEEN
EXCITATION CURRENT AND GENERATOR CURRENT
II
/var/www/apps/conversion/tmp/scratch_6/279587492.doc
SHEET 2 OF 3
/var/www/apps/conversion/tmp/scratch_6/279587492.doc
SHEET 3 OF 3
10. APPENDICES
DRAWINGS: O & M MANUAL OF GENERATOR,EXCITATION SYSTEM
SCHEMATIC DRAWINGS OF STATOR COOLING,H2
FILLING
SYSTEM
LOG SHEETS : I)
IR VALUES,WR VALUES OF GENERATOR
II) OCC,SCC TEST REPORTS
III) LIST OF PROTECTIONS INCLUED
IV) READINESS OF AUX SYSTEMS
---------------------------- * --------------------*
-----------------