Implimentation of NH projects under Assam, PWD

Review meeting on.


Progress
Sl.
No.

Name of project

IRQP from km. 105/0 to 115/0 (T=


10.00 Km) and providing paved
shoulders in KM 110, 111, 115 and
from KM 134/0 to 144/0. (Guwahati)

improvement of mirza town by


providing footpath cum drain paved
shoulder including railing in bazar area
from KM 124/400 to 127/400 along
with widening of cul. No. 125/1 &
126/1 under parmanent bridge fee
fund. (Guwahati)

Improvement by providing paved


shoulder from km 72/600 to km
73/675, km 114/950 to km 123/012,
km 123/21 to km 124/400 & from km
127/400 to km 134/000 (T=17.125 km)
along with footpath cum drain and slab
culverts of NH-37 under AP for the
year 2007-08. (Not alloted)

PR from km 134/0 to 145/750


(Guwahati/New)
SR to Bridges (Reparing of damaged
railling wearing coat, expension joints
and approaches slabs including
painting of railling and kerbs and
greasing of bearings) (GLP, Boko,
GHY)

Name of contractor contract


amount

Payment

Date of intended Value of progress in Stipulate short fall


notice to comletion
work
precentag
d
(9-8)
proceed
date
done till
e (7/4 x progress
with the
date
100)
till date in
work
%
5

10

Payment percenta Short


Steps
Steps
Remarks
made till
ge of
fall % required to required to
date
payment (8-12) make up
make up
(11/4x10
short fall in short fall in
0)
progress
Payment
11

12

13

14

15

16

Sl.No. CATOGORY
OF ROAD

JOB NO. &


DATE OF
SANCTION
ORIGINAL/
REVISED

NH-37

IRQP from
km. 105/0 to
115/0 (T=
10.00 Km)
and providing
paved
shoulders in
KM 110, 111,
115 and from
KM 134/0 to
144/0.
(Guwahati)

037-AS2005-06954
(dt. 20th
Octobor
2005)

NH-37

improvement of
mirza town by
providing
footpath cum
drain paved
shoulder
including railing
in bazar area
from KM
124/400 to
127/400 along
with widening of
cul. No. 125/1 &
126/1 under
parmanent
bridge fee fund.
(Guwahati)

037-AS2006-07029 (DT.

NAME OF
WORK

SANCTIONED
LENGTH
COST ORIGINAL/
KM
REVISED

CUMULATIVE PHYSICAL PROGRESS %

Mar. 07

Nov. 07

Apr. 07

Target Actual Target Actual Target Actual


7
8
9
10
11
12

DATE OF

CUMULATIVE EXPENDITURE (Rs. In Crore)

Jan.08
(T)
13

Mar. 07

Nov. 07

Apr. 07

Target Actual Target Actual Target Actual


14
15
16
17
18
19

Jan.08
(T)
20

Award
of
Contract
21

Completion
as per
contract

22

(Guwahati)

NH-37

Improvement
by providing
paved shoulder
from km 72/600
to km 73/675,
km 114/950 to
km 123/012,
km 123/21 to
km 124/400 &
from km
127/400 to km
134/000
(T=17.125 km)
along with
footpath cum
drain and slab
culverts of NH37 under AP for
the year 200708. (Not alloted)

NH-37

PR from km
134/0 to
145/750
(Guwahati/Ne
w)

NH-37

SR to Bridges
(Reparing of
damaged
railling wearing
coat, expension
joints and
approaches
slabs including
painting of
railling and
kerbs and
greasing of
bearings) (GLP,
Boko, GHY)

Total

NOTE

T: Target

REMARKS
EASONS
FOR
SLIPPAGE
ACTION
TAKEN

23