Professional Documents
Culture Documents
Existing Weir Crest Level: Normal Water Level 4.983 M
Existing Weir Crest Level: Normal Water Level 4.983 M
Freeboard
0.317
4.983
(At intake)
.
Water levelhd
7.47
2020.00
882.450
7.47
Flood
Q100
0.14
5.00
875.12
0.14
Qmin
Balephi B HPP
Hydraulic Design of Intake and Orifice
Assumptions:
Turbine dicharge(Q-40%)
Irrigation discharge
Total discharge required
Flushing at gravel trap
Flushing at settling basin
Discharge to divert
Qd
Minimum Flow
Qmin
Orifice
Assume Finishing: Carefully finished aperture
Assume Coefficient of discharge C
Approach Velocity
V
Orifice area
Height of Opening
Width of opening
No. of opening
Width of each opening
Adopt width of each opening
Invert Level
Design Discharge,
Normal
1in 100
36.000
2020.000
1.000
m3/s
hc
8.908
Concrete lining
0.014
Discharge
hc
m
Qnormal
3.300
Qflood
8.908
Qmin
0.704
0.100
11.850
47.398
30.000
m3/s
0.000
m3/s
30.000
m3/s
3.000
m3/s
3.000
m3/s
36.000
m3/s
5.000
m3/s
(1 in 2 Year)
0.600
1.001
m/s
35.964
3.000
12.000
3.000
4.000
4.000
m
m
m
m
m
36.000
m2
1.000
1.000
0.800
13.000
1.000
m
m
m
m/s
0.142
3.300
3.442
0.010
m
m
m
0.031
0.183
m
m
> 35.97 , OK
870.000
1.500
0.300
870.000
871.500
882.450
0.317
875.300
5.300
874.983
882.767
874.500
874.800
m
m
m
m
m
m
m
m
m
m
m
m
2020.000
m3/s
m
871.500
36.000
0.600
m2
hr,m
hc,m
hr-hc, m
874.983
882.450
874.800
880.408
0.183
2.042
from orifice
136.707
from canal
136.710
Dicharge
hr-hc
orifice-canal
-0.003
2.042
Discharge
through
submerged
orifice, m3/s
40.890
136.710
m
m
Discharge
Discharge
through
spillway, m3/s
4.890
100.710
b,
1/s
R,
m2
4.000
6000.000
13.200
10.600
1.245
4.000
6000.000
35.632
21.816
1.633
4.000
6000.000
2.816
5.408
0.521
3.000
4.000
3.300
11.950
8.650
1 in 6000
nos
m
m
cumec
Dressed stone in mortar
m/s
sq m
m
m
m
m
m
unnel adjustment)
W
1.000
1.500
2.000
Hc
6.593
Temporary reference
openings
slope
3.000
2.000
2.000
5550.000
Hc canal Qmin
0.704
n,
v,
Qdesigned,
Qrequired
Limitting parti
m/s
m3/s
0.014
1.067
42.267
36.000
2.283
0.014
1.279
136.710
136.710
2.994
0.014
0.597
5.042
5.000
0.955
(Check the
values)
Design discharge
Weir height
Weir length
Water level over crest
Q100
P
L
ho
ht
2020.00 m3/s
5.30 m
45.00 m
7.47 m
0.35 m
d1
22.42 m
44.88889 m3/s/m
1.1 (Verify this)
Output
2.252 -0.082071
d1
V1
Froude number
Type of stilling basin selected
F1
Conjugate depth
Velocity after jump
d2
Froude number
Ratio Lb/d2
F2
2.17 m
20.69 m/s
4.48 The flow is supercritical
TYPE I
12.72 m
3.53 m/s
0.32 The flow is subcritical
3.8 From IS 4997-1968 for basin type I
48.32 m
40.00 m
Length of jump
Adopt lenth of stilling basin
Type of stilling basin
IS basin type I
(Note: Since F1 is between 2.5- 4.5)
Dimention of Chute
Chute:
Height of chute
Length of chute block
Chute width
Chute distance
Sill height at basin end
Adopt
Length
Height
Width
Distance
Sill height
40 m
1m
3m
1.5 m
2.5 m
or basin type I
opower Engineering")
Q
Q100
Cd
Length of crest
hovertop
Approach velocity(v)
Velocity head(hd)
H
36 cumec
2020 cumec
2.2
45 m
7.474475 m
2.63 m
0.352543 m
7.827018 m
y
0
1
2
3
4
5
6
7
8
9
9.25
9.9
10
11
12
13.00
14.00
14.31
14.35
16.30
14.31
0.00
-0.09
-0.31
-0.66
-1.13
-1.71
-2.39
-3.18
-4.08
-5.07
-5.33
-6.04
-6.16
-7.34
-8.63
-10.00
-11.47
-11.95
-12.00
-14.6
y
0.00 -0.001016
-0.50 0.032674
-1.00 0.141627
-1.50 0.349522
0
-1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-2.00 0.749135
-2.10 0.92353
18.40 m
20.04 m
Assumed
10
12
14
-2
-3
-4
-5
-6
-7
-8
-9
-10
Column E
Balephi B HPP
Trash rack at orifice
Diverted discharge
Assume Trashrack velocity
36.000 m3/s
1.000 m/s
Vo
Orifice Size
Width of orifice
Height of orifice
No. of openings
Total area
Thickness of pier
Thickness of side wall
4.000 m
3.000 m
3.000
36.000 m2
1.500
0.800
Trash Rack
Net total Area of trashrack
Operating Platform
Provide vertical bar
Shape of bar
Bar thickness
Width between bars
inclination of trashrack
Surface area of Trashrack
Surface area coefficient
Required surface area of trashrack
Assume drop of trashrack from orifice invert level
Normal water level
Invert level of orifice
Vertical height upt NWL
Inclined ht of trashrack up to NWL
Required width of trashrack
Available width for trashrack
36.000 m2
882.767 m
t
b
k
s
Rectangular
10.000 mm
50.000 mm
70.000 degree
0.800
57.466 m2
0.150 m
874.983 m
870.000 m
5.133 m
5.462 m
11.915 m
16.600 m
S=(1/K)*(t+b)/b*(q/Vo)*
sin)
Kt
ht
h
ht
ht=
h
2.400
70.000 degrees
20.000 degrees
13.444 mm
17.432 mm
30.877 mm
0.031 m
(Re-Check this)
Kt{t/b}4/3[v02/2g]sin
[v02/2g]sin
Rectangular
Round edge
Circular
Pointed edge
Rounded both
2.400
1.800
1.800
1.700
1.000
Streamlined
0.800
Qflood
Qundersluice
RL of river bed level
Height of weir
Rl of crest of weir
Length of weir crest
hovertop
Rl of HFL@upstrream
Width
of dividewall
Width of orifice
Distance
of first orifice from sluice gate
RL of bed of sluice gate
RL of HFL of downstream
Effective head over undersluice gate
Providing 2 no. of undersluice gate
Width of undersluice
Assume B/H
Height of gate
Cd
V
Discharge capacity of undersluice
Hydraulic radius
Size of sediment flushed
Maximum size of sediment passing through
2020 cumecs
505 cumecs
870 m
5.3 m
875.3 m
45 m
7.474 m
882.450
1m
4m
0.3
870 m
870 m
12.450 m
5.5 m
0.8
6.875 m
0.6
9.377 m/s
709.160 cumecs
1.964 m
0.216 m
216 mm
Design of Gr
Inputs
Inlet discharge during high flood
Width of the gravel trap
Empirical Coefficient
Particle size to be settled
Settling Velocity
Velocity Coefficient
Width of orifice
Height of orifice
No of orifice
Turbine design discharge
Calculations
Critical Velocity
Depth of flow required to maintain velocity
Provide depth of gravel trap
Provide width of the gravel trap
Velocity in the gravel trap
Settling time of the particle
Length of the gravel trap
Length of flushing channel
Slope of flushing channel
Flushing velocity
Flushing discharge
Minimum area required for flushing channel
Width of flushing channel provided
Height of flushing channel provided
Total area of opening
Flow through channel during full opening
Wetted perimeter of flushing channel
Hydraulic radius of flushing channel
Mannings coefficint for hard stone lining
Slope of energy line of flushing channel
Critical particle size
Symbol
Qmax
W'
a
d
Vcr
D'
D'
W
V
tset
L'
Lflushing
Vf
Qf
Wf
Df
Af
Qf
P
R
n
S
Dcric
Values
Units
36 m3/s
15 m
44
2 mm
0.287 m/s
0.6
4m
3m
3
30 cumecs
Remarks
0.6223 m/s
3.86 m
4m
15
0.622
13.44 sec
8.36 m
70 m
0.02 1 in 50
6.18 m/s
3 cumecs
0.49 sq m
0.75 m
0.75 m
0.56 sq m
3.47 cumecs
3m
0.1875 m
0.017
0.076685208 i.e
158.2 mm
Sufficient Capacity
1 in 13
or particle >1 mm a = 44
ufficient Capacity
Design discharge
Discharge for canal
Maximum permissible velocity for concrete canal
Adopt Longitudnal slope
Mannings coefficient
velocity
Check for depth
By iteration
H
30 cumecs
33 cumecs
3 m/s
1/1500
0.014
1.58 m/s
OK
2.705 Hence OK
ADOPT
Overall depth
Overall width
3.25 m
5.41 m
Specific discharge(q)
Critical depth(yc)
6.1 cumec/m
1.56 m
<H
OK
ADOPT
B
D
V
5.41
3.25 including 0.545m free board
1.562 m/s
Design discharge
Increase discharge by 10%
Limiting diameter of silt D(limit)
Assume 2 no of chambers so
Discharge(Q) in each chamber
Calculation of area of settling basin
Flow velocity(Vh)
Take v
Fall velocity(w) for 15 deg celsius
Surface area(As) of each chamber
Assume L/B
Then
B
Adopt B
Adopt L
For optimum design
L/Vh=H/w
Vh/w
H
Considering turbulence
Retarding Coefficient(alpha)
Retarding velocity(w')
Final velocity after considering turbulence
Retention time(t)
Length(l)
ADOPT L
ADOPT B
ADOPT Height of water
Consider sediment concentration
Solid density(s)
pack factor(p)
Assume sediment concentration
Provide time for flusing(T)
Discharge in each section(Q)
Sediment load(Q*T*C)
Volume of sediment
Height of sediment considering rectangular cross section
Taking trapezoidal section of 1:1 side slope
Area of trapezoidal hopper section(A)
Take
Effective height of settling basin above hopper
Design of inlet zone
Horizontal slope
Length of inlet zone
30 cumecs
33 cumecs
0.2 mm
16.5 cumecs
0.197 m/s
0.197 m/s
0.020 m/s
808.03 sq m
5
12.71 m
12.8 m
64 m
9.636336
9.75 m
17.2899840018
8.3
6.543464
10.64 sq m
5m
1 in 5
m
Length
1.7848557692
0.57
Breadth
65
12.8
6.543464467
Outlet zone
Horizontal slope
Horizontal length
Total length
ADOPT
Height
20 m
m
4.5 m
Flushing channel
Qflushing
Let width(b)
Rugosity coefficient(n)
Longitudnal slope
Depth(d)
Adopt
Size of flushing
3 cumec
1m
0.012
0.005 1 in 200
0.525 m
1*1
Efficiency
0.9227109423
83.7 sq m
27.3 m
3.065934
0.006865
2.974637
Total length
m
Height in hooper
Check
2.1416969854 1.116606
Headloss Calculation
Balephi B HPP
Turbine Discharge
Orifice Discharge
Normal water level at weir crest
Orifice
No of openings
Qt
Qo
No
Wo
Ho
Ao
Vo
ho
TH1
Coarse Trashrack
Ktr
Trashrack coefficient,
thickness of the bar
t
clear spacing between the bars
b
o
angle with horizontal, =70
Sin( o)
a.
Trashrack Loss
=Ktr*(t/b)^(4/3)*SIN(ao)*(Vo^2)/(2*9.81) Losstr
Velocity at trashrack
Vtr
Headloss
TH2
Total Energy Level
Gravel trap
Length
Width
Height
Manning's Coefficient
Average Sectional area at gravel trap
Velocity inside the gravel trap
Wetted Perimeter
Hydraulic Radius
a.
Friction loss
=(((Qo*n)/(Ag*Rg^(2/3)))^2)*Lg
Contraction coefficient
b.
Contraction Loss
=Kc*Vac^2/(2*9.81)
Headloss
Total Energy Level
Lg
Wg
hg
n
Ag
Vg
Pg
Rg
Lossfr
Kc
Losscon
TH3
Velocity head
Water level
6
Approach canal
Length
Width
Canal height
Slope
Manning's Coefficient
Sectional Area of flow
Wetted Perimeter
Hydraulic Radius
Velocity of flow
a.
Friction loss
Headloss
Total Energy Level
Velocity head
Water level
7
Lac
Wac
hac
Se
n
Aac
=Lac*((Qo*n)/(Aac*Rac^(2/3)))^2
Wac
Rac
Vac
Lossfr
TH4
Settling basin
No of bay
Discharge per bay
Length
Inlet transition length
Manning's coefficient
Area of settling basin
Hydraulic gradient
Velocity of flow
Q
Lsb
Ltr
n
Ai+Ahopper
Se
Vsb
Inlet transition
a.
b.
c.
Transition coefficients
Transition loss
=Ktr*(Vac^2-Vsb^2)/(2*9.81)
Average width
Average depth
Average area
Hydraulic radius
Friction loss within tra Ltr*((Qo*n)/(Atr*Rtr^(2/3)))^2
Friction loss
Lsb*Se
Ktr
Lossit
Wtr
htr
Atr
Rtr
Losstr
Lossfr
Outlet transition
Contraction coefficients
d.
Velocity in penstock
Contraction loss
Headloss
Total Water Level
Velocity head
Water level
Kc
Vp
Kc*Vp^2/(2*9.81)
Losscon
TH5
Design
Unit
m3/sec
m3/sec
m
30.000
36.000
874.983
33.000
3.000
m
m
m2
m/sec
m
4.000
3.000
12.000
1.000
0.142
0.142
874.841
0.051
874.790
m
m
m
m/sec
2.420
0.010
0.050
0.993
0.01432
3.600
0.031
874.851
m
m
m
m2
m/sec
m
m
m
m
12.000
15.000
4.000
0.014
60.000
0.622
21.600
2.778
0.00022
0.150
0.039
0.039
874.812
0.020
873.8-0.041-0.003
874.792
m
m
m
1 in 1500
m2
m
m
m/sec
m
35.000
5.410
2.705
0.00067
0.014
14.634
10.820
1.353
2.255
0.023
0.023
874.789
0.259
874.529
m /sec
m
m
3
m^2
m/sec
m
m
m
m2
m
m
m
2
16.500
65.000
19.000
0.014
83.70
4E-06
0.197
0.300
0.077
11.705
3.678
43.045
2.258
0.0002
0.00026
0.150
m/sec
m
2.255
0.0045
0.082
874.706
0.002
874.705
0.317
4.4 m
2.2 m
30 cumecs
3300 m
0.3
Area of tunnel(At)
Velocity of tunnel(Vt)
Submergence head for tunnel
17.28 sq m
1.74 m/s
2.29 m
11.46 m
12 m
874.705 m
862.705 m
858.305 m
17.2788 sq m
15.708 m
1.1
1.74 m/s
0.03
0.002389 i.e
Headloss Calculation
hf
Entrance
Bend
lossloss
Total head loss
Bed level of tunnel outlet
Soffit level of tunnel outlet
Bed level of tunnel outlet
Soffit level of tunnel outlet
7.88 m
0.02 m
0.00
7.90 m
850.4464 m
854.8464 m
850.447 m
854.847 m
850.614 m
855.014 m
1 in
418.5
intake level=
875 amsl
785 amsl
3300 m
90 %
95 %
99 %
Rate
0 cm
0 cm
0 cm
5 cm
0.03
Unit
4607 NRs/m3
4562 NRs/m2
Invert RCC=
2804 NRs/m2
levelling PCC=
Wet season energy rate=
Dry season energy rate=
Life period of project=
Interest rate=
Design discharge (Q40)=
1340 NRs/m2
4.8 NRs/KWhr
8.4 NRs/KWhr
50 years
10 %
30 m3/s
90 m
7.2 m
Gross head=
Total head loss (during design discharge)=
85 %
82.8 m
5%
5%
Design flow=
10 % D/S release=
30 m3/s
0.9623684211 m3/s
Month
May
June
July
August
September
October
river flow
(m3/s)
15.6157894737
46.2118421053
119.842105263
148.894736842
102.592105263
46.1210526316
November
December
Janauary
February
March
April
22.7881578947
15.4342105263
11.6210526316
10.0776315789
9.6236842105
10.8947368421
Total dry s
Tunnel D-shaped
weighted
Inside area
perimeter(m) (m2)
2
7.14
3.6
2.1
7.50
3.9
2.2
7.86
4.3
2.3
8.21
4.7
2.4
8.57
5.1
2.5
8.93
5.6
2.6
9.28
6.0
2.7
9.64
6.5
2.8
10.00
7.0
2.9
10.36
7.5
3
10.71
8.0
3.1
11.07
8.6
3.2
11.43
9.1
3.3
11.78
9.7
3.4
12.14
10.3
3.5
12.50
10.9
3.6
12.85
11.6
3.7
13.21
12.2
3.8
13.57
12.9
3.9
13.93
13.6
4
14.28
14.3
4.1
14.64
15.0
4.2
15.00
15.7
4.3
15.35
16.5
4.4
15.71
17.3
4.5
16.07
18.1
design
discharge Q
(m3/s)
tunnel
diameter D
(m)
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4
4.1
4.2
4.3
4.4
4.5
tunnel
diameter D
(m)
Month
May
June
July
August
September
October
November
December
Janauary
design flow
(m3/s)
14.65
30.00
30.00
30.00
30.00
30.00
21.83
14.47
10.66
February
March
April
9.12
8.66
9.93
Tunnel D-shaped
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4
4.1
4.2
4.3
4.4
4.5
Minimum total cost (million NRs.)=
Optimum diameter of tunnel =
Total annual
cost(million
NRs.)
5.83
6.40
7.00
7.63
8.29
8.98
9.69
10.43
11.19
11.99
12.81
13.65
14.53
15.43
16.36
17.32
18.30
19.31
20.35
21.41
22.50
23.62
24.77
25.94
27.14
28.37
Energy lost
cost (million
NRs)
701.50
540.78
421.96
332.89
265.29
213.39
173.11
141.55
116.59
96.69
80.70
67.75
57.20
48.54
41.40
35.47
30.52
26.37
22.87
19.91
17.40
15.25
13.41
11.83
10.47
9.28
37.61
4.40 m
Tunnel Dshaped
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4
4.1
4.2
4.3
4.4
4.5
Total annual
cost(million
NRs.)
5.83
6.40
7.00
7.63
8.29
8.98
9.69
10.43
11.19
11.99
12.81
13.65
14.53
15.43
16.36
17.32
18.30
19.31
20.35
21.41
22.50
23.62
24.77
25.94
27.14
28.37
DISCHARGE(m3/s)
15.62
46.21
119.84
148.89
102.59
46.12
22.79
15.43
11.62
10.08
9.62
April
design flow
(m3/s)
operating days
14.65
14.65
45.25
30.00
118.88
30.00
147.93
30.00
101.63
30.00
45.16
30.00
10.89
available flow
(m3/s)
power (MW)
31
30
31
31
30
31
10.12
20.71
20.71
20.71
20.71
20.71
21.83
21.83
14.47
14.47
10.66
10.66
9.12
9.12
8.66
8.66
9.93
9.93
Total dry season and wet season energy
Total energy
30
31
31
28
31
30
15.07
9.99
7.36
6.29
5.98
6.86
haped tunnel
cost
cross-sectional
area A (m2)
wetted
Flow velocity
perimeter P (m) Hydraulic radius ,R (m) (m/s)
3.6
7.14
0.50
3.9
7.50
0.53
4.3
7.86
0.55
4.7
8.21
0.58
5.1
8.57
0.60
5.6
8.93
0.63
6.0
9.28
0.65
6.5
9.64
0.68
7.0
10.00
0.70
7.5
10.36
0.73
8.0
10.71
0.75
8.6
11.07
0.78
9.1
11.43
0.80
9.7
11.78
0.83
10.3
12.14
0.85
10.9
12.50
0.88
11.6
12.85
0.90
12.2
13.21
0.93
12.9
13.57
0.95
13.6
13.93
0.98
14.3
14.28
1.00
15.0
14.64
1.03
15.7
15.00
1.05
16.5
15.35
1.08
17.3
15.71
1.10
18.1
16.07
1.13
2
Energy
17277776.13
143480896.28
148263592.82
148263592.82
143480896.28
148263592.82
55251007.54
16643405.80
6649385.96
2.1
Energy
12892942.56
107067653.93
110636575.73
110636575.73
107067653.93
110636575.73
41229152.51
12419565.66
4961874.18
2.2
Energy
8.40
7.62
6.94
6.35
5.83
5.38
4.97
4.61
4.29
4.00
3.73
3.50
3.28
3.09
2.91
2.74
2.59
2.45
2.33
2.21
2.10
2.00
1.91
1.82
1.74
1.66
2.3
Energy
9752854.19
80991225.41
83690932.92
83690932.92
80991225.41
83690932.92
31187753.37
9394768.68
3753405.02
7469659.42
62030750.95
64098442.65
64098442.65
62030750.95
64098442.65
23886535.26
7195403.62
2874713.05
3756425.04
3567979.70
5207014.39
2803102.20
2662481.39
3885554.31
2120404.01
2014031.53
2939223.88
1624006.21
1542536.09
2251136.01
820924760.50
19180805.10
840105565.60
4101.56
413.68
612586695.77
14313012.08
626899707.85
3060.65
308.69
463390625.84
10827064.44
474217690.28
2315.22
233.51
354908428.13
8292391.36
363200819.49
1773.22
178.85
800
700
600
500
400
300
200
100
Diameter
100
0
1.5
exceedence period
148.89
8.33
119.84
16.67
102.59
25.00
46.21
33.33
46.12
41.67
22.79
50.00
15.62
58.33
15.43
66.67
11.62
75.00
10.89
83.33
10.08
91.67
12
9.62
100.00
160
140
Discharge (m3/s)
S.No.
120
100
80
60
40
20
0
0
Wet season
Dry season (GWh) (GWh)
7.53
14.91
15.41
15.41
14.91
15.41
10.85
7.43
5.48
4.23
4.45
4.94
19.09
120.96
101.87
Cost of
Cost of
PCC(million
RCC(million NRs.) NRs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total annual
cost(million NRs.)
0.00
5.83
0.00
6.40
0.00
7.00
0.00
7.63
0.00
8.29
0.00
8.98
0.00
9.69
0.00
10.43
0.00
11.19
0.00
11.99
0.00
12.81
0.00
13.65
0.00
14.53
0.00
15.43
0.00
16.36
0.00
17.32
0.00
18.30
0.00
19.31
0.00
20.35
0.00
21.41
0.00
22.50
0.00
23.62
0.00
24.77
0.00
25.94
0.00
27.14
0.00
28.37
maximum
capacity loss in
KW (Pmax)
constant
7.77
5.80
4.39
3.36
2.60
2.04
1.61
1.28
1.03
0.84
0.68
0.56
0.46
0.39
0.32
0.27
0.23
0.19
0.17
0.14
0.12
0.10
0.09
0.08
0.07
0.06
209767.39
156531.66
118408.22
90688.23
70250.68
54989.26
43458.81
34652.56
27859.27
22569.92
18415.79
15126.83
12503.11
10395.24
8690.49
7303.14
6167.41
5232.48
4458.78
3815.31
3277.62
2826.28
2445.81
2123.77
1850.13
1616.75
2.4
2.5
Energy
Energy
5786292.27
48051461.86
49653177.25
49653177.25
48051461.86
49653177.25
18503450.64
5573842.93
2226865.90
4529265.34
37612656.07
38866411.28
38866411.28
37612656.07
38866411.28
14483720.12
4362968.97
1743096.63
Mannings
headloss(m)
Maximum power
loss(KW)
528.25
132145.176521398
407.22
101868.9243452
317.75
79485.9424423546
250.68
62708.9458412888
199.78
49974.8312714919
160.69
40197.3953008442
130.36
32610.1980540358
106.59
26664.7725459211
87.80
21963.5123085689
72.81
18214.6977960417
60.77
15201.9021851158
51.02
12762.8870316582
43.07
10774.8543415516
36.55
9144.0153466726
31.17
7798.1287522677
26.71
6681.1064141985
22.98
5749.0747426855
19.86
4967.4720318871
17.22
4308.8903609169
15.00
3751.4577081399
13.10
3277.615503478
11.49
2873.1880829585
10.10
2526.6693385694
8.91
2228.6722003401
7.88
1971.5010726512
6.99
1748.8177482468
2.6
Energy
2.7
Energy
3579544.19
29725828.45
30716689.40
30716689.40
29725828.45
30716689.40
11446694.40
3448117.75
1377594.59
2854205.45
23702353.44
24492431.89
24492431.89
23702353.44
24492431.89
9127200.50
2749410.53
1098446.55
1258019.15
1194909.18
1743818.58
984724.29
935324.47
1364987.58
778241.91
739200.52
1078769.51
620543.34
589413.07
860173.71
274926041.30
6423612.82
281349654.12
1373.60
138.54
215200500.42
5028132.97
220228633.39
1075.20
108.44
170076081.42
3973806.52
174049887.95
849.75
85.70
135612819.05
3168576.68
138781395.73
677.56
68.34
Diameter of tunnel(m)
2.5
3.5
160
140
120
100
80
60
40
20
0
Exceedence %
10
Month
May
June
July
August
September
October
20
Energy
generation
7.53
14.91
15.41
15.41
14.91
15.41
30
40
18
16
14
12
10
8
6
4
2
0
May
June
July
Mpnthly energy (
November
December
Janauary
February
March
April
10.85
7.43
5.48
4.23
4.45
4.94
14
12
10
8
6
4
2
0
May
June
July
2.8
Energy
2294666.78
19055742.12
19690933.52
19690933.52
19055742.12
19690933.52
7337903.36
2210415.86
883107.00
2.9
Energy
1859001.88
15437823.36
15952417.48
15952417.48
15437823.36
15952417.48
5944730.74
1790746.82
715440.51
3
Energy
1516841.80
12596402.42
13016282.50
13016282.50
12596402.42
13016282.50
4850568.56
1461149.48
583759.54
3.1
Energy
1245941.51
10346748.48
10691640.10
10691640.10
10346748.48
10691640.10
3984281.48
1200195.55
479503.03
3.20
Energy
1029835.71
8552127.85
8837198.78
8837198.78
8552127.85
8837198.78
3293216.68
992024.29
396334.29
498891.97
473864.49
691545.19
404172.46
383896.68
560248.58
329782.17
313238.27
457131.58
270884.74
257295.50
375490.18
223900.38
212668.16
310362.24
109027270.80 88327378.60
2547408.64
2063758.23
111574679.45 90391136.83
544.73
441.31
54.94
44.51
72070212.17
1683911.56
73754123.73
360.08
36.32
59198835.79
1383173.45
60582009.24
295.77
29.83
48930928.74
1143265.07
50074193.81
244.47
24.66
4.5
40
50
60
70
80
Energy generation
June
July
August
September
October
November
December
Janauary
June
July
August
September
October
November
December
Janauary
3.3
Energy
856217.65
7110340.78
7347352.14
7347352.14
7110340.78
7347352.14
2738019.50
824780.79
329517.04
3.4
Energy
3.5
Energy
715804.32
5944297.72
6142440.97
6142440.97
5944297.72
6142440.97
2289004.64
689522.87
275478.69
601533.1282963
4995348.461644
5161860.077032
5161860.077032
4995348.461644
5161860.077032
1923587.339453
579447.2556243
231501.201762
3.6
Energy
507987.249693397
4218509.68287907
4359126.67230837
4359126.67230837
4218509.68287907
4359126.67230837
1624445.59767016
489336.004752806
195499.88729111
186153.44
176814.84
258038.86
40681755.90
950524.18
41632280.08
203.26
20.50
28580844.88
667787.89
29248632.77
142.80
14.40
24136168.23
563938.57
24700106.81
120.59
12.16
flow duration
70
80
90
100
eneration
mber
Energy generation
December
Janauary
February
March
April
mber
Energy generation
December
Janauary
February
March
April
3.7
Energy
430980.352451838
3579016.58170761
3698317.1344312
3698317.1344312
3579016.58170761
3698317.1344312
1378192.33975908
415156.490488741
165863.63216768
3.8
Energy
367253.748010708
3049807.8307908
3151468.09181716
3151468.09181716
3049807.8307908
3151468.09181716
1174406.90596848
353769.670184676
141338.32372105
3.9
Energy
314253.536816661
2609674.92538486
2696664.08956436
2696664.08956436
2609674.92538486
2696664.08956436
1004922.41634454
302715.413188258
120941.088709551
93701.0282523028
89000.409510332
129884.823248884
79845.9921022989
75840.4270199531
110679.495889993
68323.0206762954
64895.5185721106
94706.7884940994
20477313.75
478449.89
20955763.64
102.31
10.32
17449450.26
407704.24
17857154.50
87.18
8.79
14931233.49
348866.42
15280099.90
74.60
7.52
100
Energy generation
Energy generation
4
Energy
269965.251964309
2241889.00437894
2316618.63785823
2316618.63785823
2241889.00437894
2316618.63785823
863296.99287143
260053.215701836
103896.655601875
58694.1412933077
55749.6828839047
81359.5998871969
12826949.38
299700.08
13126649.46
64.09
6.46
Material usSteel
Using USBR method
Q
Gross head
velocity
Area(A)
D
Using Sarkaria formula
Power(P)
Power(P)
Power(P)
D
Project
Economic
life
30 cumec
90 m
5.252678 m/s
5.711372 sq m
2.697338 m
50 yrs
20.25 MW
20250000 W
27144.77 hp
1.185562 m
Dia of
penstock
0.8
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
2.8
3
3.2
3.4
3.6
3.8
4
4.2
4.4
4.6
4.8
5
893925
Penstock diameter optimization
of
penstock
Thickness Area(sq Volume(m
pipe(m) Length(m)
(m)
m)
^3)
2.512
185
0.034 0.085408 15.80048
3.14
185
0.034 0.10676 19.7506
3.768
185
0.034 0.128112 23.70072
4.396
185
0.034 0.149464 27.65084
5.024
185
0.034 0.170816 31.60096
5.652
185
0.034 0.192168 35.55108
6.28
185
0.034 0.21352 39.5012
6.908
185
0.034 0.234872 43.45132
7.536
185
0.034 0.256224 47.40144
8.164
185
0.034 0.277576 51.35156
8.792
185
0.034 0.298928 55.30168
9.42
185
0.034 0.32028 59.2518
10.048
185
0.034 0.341632 63.20192
10.676
185
0.034 0.362984 67.15204
11.304
185
0.034 0.384336 71.10216
11.932
185
0.034 0.405688 75.05228
12.56
185
0.034 0.42704 79.0024
13.188
185
0.034 0.448392 82.95252
13.816
185
0.034 0.469744 86.90264
14.444
185
0.034 0.491096 90.85276
15.072
185
0.034 0.512448 94.80288
15.7
185
0.034
0.5338
98.753
Dia of Discharge
penstock (cumecs)
Area(sq
m)
Mass(Kg)
124033.8
155042.2
186050.7
217059.1
248067.5
279076
310084.4
341092.9
372101.3
403109.7
434118.2
465126.6
496135.1
527143.5
558152
589160.4
620168.8
651177.3
682185.7
713194.2
744202.6
775211.1
Material
cost(RS)
20465572
25581965
30698358
35814751
40931143
46047536
51163929
56280322
61396715
66513108
71629501
76745894
81862287
86978680
92095073
97211466
1.0E+008
1.1E+008
1.1E+008
1.2E+008
1.2E+008
1.3E+008
Annual material
cost
($2,064,140.66)
($2,580,175.83)
($3,096,210.99)
($3,612,246.16)
($4,128,281.32)
($4,644,316.49)
($5,160,351.65)
($5,676,386.82)
($6,192,421.98)
($6,708,457.15)
($7,224,492.31)
($7,740,527.48)
($8,256,562.64)
($8,772,597.81)
($9,288,632.97)
($9,804,668.14)
($10,320,703.30)
($10,836,738.47)
($11,352,773.63)
($11,868,808.80)
($12,384,843.96)
($12,900,879.13)
Energy(K
w-hr)
Revenue loss(Rs)
Velocity(
Headloss( Powerloss
m/s)
Length(m)
m)
(kw)
($1,040,446,931.60)
$2,064,140.66
$2,580,175.83
$3,096,210.99
$3,612,246.16
$4,128,281.32
$4,644,316.49
$5,160,351.65
$5,676,386.82
$6,192,421.98
$6,708,457.15
$7,224,492.31
$7,740,527.48
$8,256,562.64
$8,772,597.81
$9,288,632.97
$9,804,668.14
$10,320,703.30
$10,836,738.47
$11,352,773.63
$11,868,808.80
$12,384,843.96
$12,900,879.13
0.8
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
2.8
3
3.2
3.4
3.6
3.8
4
4.2
4.4
4.6
4.8
5
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
0.5024
0.785
1.1304
1.5386
2.0096
2.5434
3.14
3.7994
4.5216
5.3066
6.1544
7.065
8.0384
9.0746
10.1736
11.3354
12.56
13.8474
15.1976
16.6106
18.0864
19.625
59.71338
38.21656
26.53928
19.49825
14.92834
11.79523
9.55414
7.895984
6.63482
5.653337
4.874561
4.246285
3.732086
3.305931
2.948809
2.646576
2.388535
2.166472
1.973996
1.806076
1.658705
1.528662
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
504.3212
165.256
66.41267
30.72678
15.76004
8.745701
5.164249
3.206592
2.075396
1.390882
0.960212
0.680066
0.492501
0.363716
0.273303
0.208564
0.161383
0.126448
0.100206
0.080236
0.064856
0.052882
800000000
700000000
600000000
500000000
Energy cost(Nrs)
400000000
Penstock cost(Nrs)
Total cost(Nrs)
300000000
200000000
100000000
2.5
m
3
3.5
4.5
5.5
126158.5
41339.61
16613.46
7686.457
3942.452
2187.781
1291.863
802.1451
519.1707
347.9362
240.2018
170.1218
123.2016
90.98541
68.36815
52.17331
40.37071
31.63151
25.06704
20.07138
16.22408
13.22867
1.1E+009
3.6E+008
1.5E+008
67193082
34463932
19125034
11293141
7012152
4538460
3041571
2099784
1487163
1076998
795371.7
597657.3
456086
352910.7
276514.7
219129.8
175459
141826.9
115641.8
6617074934.4726
2168283114.528
871384353.51079
403158489.49247
206783591.70227
114750202.93146
67758847.328999
42072913.132486
27230761.047212
18249427.629662
12598702.79664
8922975.7799505
6461987.2406959
4772230.3956665
3585943.8416082
2736516.0815056
2117463.9790312
1659088.4341254
1314778.5353902
1052753.8282065
850961.28272538
693850.59664895
$1,148,567.93
$1,435,709.92
$1,722,851.90
$2,009,993.89
$2,297,135.87
$2,584,277.85
$2,871,419.84
$3,158,561.82
$3,445,703.80
$3,732,845.79
$4,019,987.77
$4,307,129.76
$4,594,271.74
$4,881,413.72
$5,168,555.71
$5,455,697.69
$5,472,839.67
$6,029,981.66
$6,317,123.64
$6,604,265.63
$6,891,407.61
$7,178,549.59
13.89 mm
2.4
33.33 mm
34 mm
0.000859174
###
4944389
($498,686.99)
ALL in NRS
Material
cost
Total cost
65575212600.6232
21487685664.9722
8635418943.29194
3995300630.87036
2049225393.76948
1137174511.05079
671490177.030382
416942569.142931
269856841.977873
180851827.809946
124853144.714699
88426689.9793094
64038293.555296
47292803.2210554
35536703.4703372
27118874.3677204
20984068.0321994
16441566.3821825
13029455.2857166
10432790.4375261
8433026.31180852
6876059.41279109
20465572
25581965
30698358
35814751
40931143
46047536
51163929
56280322
61396715
66513108
71629501
76745894
81862287
86978680
92095073
97211466
1.0E+008
1.1E+008
1.1E+008
1.2E+008
1.2E+008
1.3E+008
65595678172.3432
21513267629.6222
8666117300.87194
4031115381.38036
2090156537.20948
1183222047.42079
722654106.330382
473222891.372931
331253557.137873
247364935.899946
196482645.734699
165172583.929309
145900580.435296
134271483.031055
127631776.210337
124330340.03772
123311926.632199
123885817.912183
125590099.745717
128109827.827526
131226456.631809
134785882.662791
4881413
5168555
5455697
5472839
6029981
6317123
6604265
6891407
7178549
9653643
8754499
8192213
7590303
7689069
7631902
7657019
7742368
7872400
10%
90
0.85
0.05
0.05
30.00
0.962368
Month
Flow
Available Flow
Jan
Feb
Mar
Apr
May
Jun
July
Aug
Sept
Oct
Nov
Dec
(m3/s)
11.62
10.08
9.62
10.89
15.62
46.21
119.84
148.89
102.59
46.12
22.79
15.43
(m3/s)
10.66
9.12
8.66
9.93
14.65
45.25
118.88
147.93
101.63
45.16
21.83
14.47
5%
5%
eedence
0.95
0.95
31.00
28.00
31.00
30.00
31.00
30.00
31.00
31.00
30.00
31.00
30.00
31.00
Capacit
Wet
y
season
Penstock
Total
lossHead loss
Headwo HRT loss
generati energy(
rks loss
on(KW) Kwh)
0.318
0.318
0.318
0.318
0.318
0.318
0.318
0.318
0.318
0.318
0.318
0.318
1.00
0.73
0.66
0.87
1.88
7.90
7.90
7.90
7.90
7.90
4.18
1.84
0.085707
0.062683
0.056595
0.074424
0.161989
0.678971
0.678971
0.678971
0.678971
0.678971
0.359376
0.158
1.40
1.11
1.03
1.26
2.36
8.90
8.90
8.90
8.90
8.90
4.86
2.31
7874.459
6756.317
6425.402
7349.675
10707.93
20288.33
20288.33
20288.33
20288.33
20288.33
15495.22
10581.33
2513589
7568367
13877217
14339791
14339791
13877217
14339791
10598728
3739441
20.3
1E+008
95.2
115.9
4.60
Dry
season
energy(
KWh)
5565667
4313233
4541474
2513589
3739441
2E+007
20.7
Gross head
Generator efficiency
Transformer efficiency
Turbine efficiency
Overall efficiency
Energy outage
Month
Jan
Feb
Mar
Apr
May
Jun
July
Aug
Sept
Oct
Nov
Dec
TOTAL
Seasonal energy(GWh)
Total annual energy(GWh)
90
0.95
0.99
0.9
0.85
0.95
Available Flow
Days
(m3/s)
10.66
9.12
8.66
9.93
14.65
45.25
118.88
147.93
101.63
45.16
21.83
14.47
31.00
28.00
31.00
30.00
31.00
30.00
31.00
31.00
30.00
31.00
30.00
31.00
Total Head
loss(m)
1.40
1.11
1.03
1.26
2.36
8.90
8.90
8.90
8.90
8.90
4.86
2.31
Gross head
Generator efficiency
Transformer efficiency
Turbine efficiency
Overall efficiency
Energy outage
Month
Jan
Feb
Mar
Apr
May
Jun
July
Aug
Sept
Oct
Nov
Dec
TOTAL
Seasonal energy(GWh)
Total annual energy(GWh)
90
0.95
0.99
0.9
0.85
0.95
Available Flow
Days
(m3/s)
10.66
9.12
8.66
9.93
14.65
45.25
118.88
147.93
101.63
45.16
21.83
14.47
31.00
28.00
31.00
30.00
31.00
30.00
31.00
31.00
30.00
31.00
30.00
31.00
Total Head
loss(m)
1.40
1.11
1.03
1.26
2.36
8.90
8.90
8.90
8.90
8.90
4.86
2.31
Gross head
Generator efficiency
Transformer efficiency
Turbine efficiency
Overall efficiency
Energy outage
Month
Jan
Feb
Mar
Apr
May
Jun
July
Aug
Sept
Oct
Nov
Dec
TOTAL
Seasonal energy(GWh)
Total annual energy(GWh)
90
0.95
0.99
0.9
0.85
0.95
Available Flow
Days
(m3/s)
10.66
9.12
8.66
9.93
14.65
45.25
118.88
147.93
101.63
45.16
21.83
14.47
31.00
28.00
31.00
30.00
31.00
30.00
31.00
31.00
30.00
31.00
30.00
31.00
Total Head
loss(m)
1.40
1.11
1.03
1.26
2.36
8.90
8.90
8.90
8.90
8.90
4.86
2.31
FOR 2 units
Q at
Dry
Wet
Q at
T1(cumec % rated
Turbine Capacity( energy(K energy(K T2(cumec % rated
)
Wh)
Wh)
)
flow
efficiency
KW)
flow
0
0
0
0
0
10.66
71.1
0
0
0
0
0
9.12
60.8
0
0
0
0
0
8.66
57.7
0
0
0
0
0
0
9.93
66.2
0
0
0
0
0
14.65
97.7
15
100
90 10101.8
6909629
15
100
15
100
90 10101.8
7139950
15
100
15
100
90 10101.8
7139950
15
100
15
100
90 10101.8
6909629
15
100
15
100
90 10101.8
7139950
15
100
6.83
45.5
60 3219.137
2201890
15
100
0
0
0
0
0
0
14.47
96.5
0
0
4E+007
37.44
110.75
For 3 units
Q at
Dry
Wet
Q at
T1(cumec % rated
Turbine Capacity( energy(K energy(K T2(cumec % rated
)
Wh)
Wh)
)
flow
efficiency
KW)
flow
0
0
0
0
0
0.66
6.6
0
0
0
0
0
0.00
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
4.65
46.5
10
100
90 6734.532
4606420
10
100
10
100
90 6734.532
4759967
10
100
10
100
90 6734.532
4759967
10
100
10
100
90 6734.532
4606420
10
100
10
100
90 6734.532
4759967
10
100
1.83
18.3
2 28.75072
19665.49
10
100
0
0
0
0
0
0
4.47
44.7
0
0
2E+007
23.51
112.46
For 4 units
Q at
Dry
Wet
Q at
T1(cumec % rated
Turbine Capacity( energy(K energy(K T2(cumec % rated
)
flow
efficiency
KW)
Wh)
Wh)
)
flow
0
0
0
0
0
0.00
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0.00
0
7.5
100
90 5050.899
3454815
7.5
100
7.5
100
90 5050.899
3569975
7.5
100
7.5
100
90 5050.899
3569975
7.5
100
7.5
100
90 5050.899
3454815
7.5
100
7.5
100
90 5050.899
3569975
7.5
100
0
0
2
0
0
6.83 91.06667
0
0
0
0
0
0
0
0
0
0
2E+007
17.62
112.65
Turbine
efficiency
78
71
68
76
90
90
90
90
90
90
90
90
Dry
Wet
Capacity( energy(K energy(K
Wh)
Wh)
KW)
6796.028 4803433
5307.723 3388450
4834.473 3417005
6180.472 2113721 2113721
10663.21
7536758
10101.8
6909629
10101.8
7139950
10101.8
7139950
10101.8
6909629
10101.8
7139950
10604.77
7253664
10535.79 3723350 3723350
2E+007
17.45
6E+007
55.87
Turbine
efficiency
0.5
0
0
0
61
90
90
90
90
90
90
59
Capacity(
KW)
2.697559
0
0
0
2293.45
6734.532
6734.532
6734.532
6734.532
6734.532
7069.848
2133.614
Dry
Wet
Q at
energy(K energy(K T3(cumec % rated
Turbine
Wh)
Wh)
)
flow
efficiency
1906.635
10.00
100
90
0
9.12
91.2
90
0
8.66
86.6
87
0
0
9.93
99.3
90
1621011
10.00
100
90
4606420
10.00
100
90
4759967
10.00
100
90
4759967
10.00
100
90
4606420
10.00
100
90
4759967
10.00
100
90
4835776
10.00
100
90
754019.1 754019.1
10.00
100
90
755926
0.76
19.70 GWh
92.76 GWh
3E+007
30.70
Capacity(
KW)
7356.979
6731.595
6184.341
7317.234
7276.944
6734.532
6734.532
6734.532
6734.532
6734.532
7069.848
7281.13
Turbine
efficiency
0
0
0
0
0
90
90
90
90
90
90
0
Dry
Wet
Q at
Capacity( energy(K energy(K T3(cumec % rated
Turbine
KW)
Wh)
Wh)
)
flow
efficiency
0
0
3.16 42.13333
57
0
0
1.62
21.6
2.5
0
0
1.16 15.46667
1.5
0
0
0
2.43
32.4
32
0
0
7.15 95.33333
90
5050.899
3454815
7.50
100
90
5050.899
3569975
7.50
100
90
5050.899
3569975
7.50
100
90
5050.899
3454815
7.50
100
90
5050.899
3569975
7.50
100
90
4828.706
3302835
7.50
100
90
0
0
0
6.97 92.93333
90
0
0.00
2E+007
20.92
Capacity(
KW)
1472.377
33.21511
14.28254
636.6657
5203.015
5050.899
5050.899
5050.899
5050.899
5050.899
5302.386
5074.947
Dry
Wet
energy(K energy(K
Wh)
Wh)
5199912
4297451
4371093
2502494 2502494
5143344
4606420
4759967
4759967
4606420
4759967
4835776
2573151 2573151
2E+007
18.94
4E+007
38.55
Dry
Wet
Q at
energy(K energy(K T4(cumec % rated
Turbine
Wh)
Wh)
)
flow
efficiency
1040676
7.50
100
90
21204.53
7.50
100
90
10094.9
7.50
100
90
217739.7 217739.7
7.50
100
90
3677491
7.50
100
90
3454815
7.50
100
90
3569975
7.50
100
90
3569975
7.50
100
90
3454815
7.50
100
90
3569975
7.50
100
90
3626832
7.50
100
90
1793486 1793486
7.50
100
90
3083201
3.08
3E+007
26.94
Dry
Wet
Capacity( energy(K energy(K
KW)
Wh)
Wh)
5517.734 3899934
5535.852 3534088
5540.642 3916126
5526.612 1890101 1890101
5457.708
3857508
5050.899
3454815
5050.899
3569975
5050.899
3569975
5050.899
3454815
5050.899
3569975
5302.386
3626832
5460.847 1929863 1929863
2E+007
15.17
3E+007
28.92
Turbine design
Design discharge
Unit of turbine
Gross head
Net head
Discharge in each turbine
Overall efficiency
30 cumecs
3
90 m
81.1 m
10 cumecs
0.85
Power(P)
Power in hp
Specific speed(Ns)
6762.524 KW
9065.045 hp
266.5022 rpm
Synchronous speed(N)
No of pole
681.2271 rpm
8.807636
ADOPT No of pole
Corrected(N)
Corrected specific speed(Ns)
10
600 rpm
USBR formulae
frequency=50 hertz
Synchronous speed
234.73 rpm
0.897
1.14 m
1.084 m
0.460 m
0.174 m
0.398 m
0.136
9.250
-1.752 m
783.248 m
intake level=
875 amsl
785 amsl
500 m
90 %
95 %
99 %
monthly flow
0 cm
0 cm
0 cm
5 cm
0.03
Rate
Unit
4607 NRs/m3
4562 NRs/m2
Invert RCC=
2804 NRs/m2
levelling PCC=
Wet season energy rate=
Dry season energy rate=
Life period of project=
Interest rate=
Design discharge (Q40)=
1340 NRs/m2
4.8 NRs/KWhr
8.4 NRs/KWhr
50 years
10 %
30 m3/s
90 m
Gross head=
Total head loss (during design
discharge)=
8.9 m
30 m3/s
0.962368 m3/s
Month
May
June
July
August
river
flow
available flow design flow
(m3/s)
(m3/s)
(m3/s)
15.61579
14.65
14.65
46.21184
45.25
30.00
119.8421
118.88
30.00
148.8947
147.93
30.00
September
October
November
December
Janauary
February
March
April
102.5921
46.12105
22.78816
15.43421
11.62105
10.07763
9.623684
10.89474
101.63
30.00
45.16
30.00
21.83
21.83
14.47
14.47
10.66
10.66
9.12
9.12
8.66
8.66
9.93
9.93
Total dry season and wet season energy
Total energy
Tunnel D-shaped
weighted
perimete Inside
Hydraulic
2
r(m)
area (m ) radius (m)
2
7.14
3.6
2.1
7.50
3.9
2.2
7.86
4.3
2.3
8.21
4.7
2.4
8.57
5.1
2.5
8.93
5.6
2.6
9.28
6.0
2.7
9.64
6.5
2.8
10.00
7.0
2.9
10.36
7.5
3
10.71
8.0
3.1
11.07
8.6
3.2
11.43
9.1
3.3
11.78
9.7
3.4
12.14
10.3
3.5
12.50
10.9
3.6
12.85
11.6
3.7
13.21
12.2
3.8
13.57
12.9
3.9
13.93
13.6
4
14.28
14.3
4.1
14.64
15.0
4.2
15.00
15.7
4.3
15.35
16.5
4.4
15.71
17.3
4.5
16.07
18.1
Total tunnel
area(m2)
0.50
3.83
0.53
4.21
0.55
4.61
0.58
5.02
0.60
5.45
0.63
5.90
0.65
6.37
0.68
6.86
0.70
7.36
0.73
7.88
0.75
8.42
0.78
8.98
0.80
9.56
0.83
10.15
0.85
10.76
0.88
11.39
0.90
12.04
0.93
12.70
0.95
13.38
0.98
14.08
1.00
14.80
1.03
15.54
1.05
16.29
1.08
17.06
1.10
17.85
1.13
18.66
2
Energy
Month
May
June
July
August
design
flow
(m3/s)
14.65
30.00
30.00
30.00
2617844.87
21739529.74
22464180.73
22464180.73
2.1
Energy
1953476.15
16222371.81
16763117.53
16763117.53
30.00
30.00
21.83
14.47
10.66
9.12
8.66
9.93
Tunnel D-shaped
21739529.74
22464180.73
8371364.78
2521728.15
1007482.72
569155.31
540602.99
788941.57
16222371.81
16763117.53
6246841.29
1881752.37
751799.12
424712.46
403406.27
588720.35
124382539.47
2906182.59
127288722.06
621.45
92816166.03
2168638.19
94984804.22
463.73
62.68
46.77
Total
Energy
annual
lost cost
cost(milli (million Total cost
on NRs.) NRs)
(million NRs.)
2
0.88
106.29
107.17
2.1
0.97
81.94
82.91
2.2
1.06
63.93
64.99
2.3
1.16
50.44
51.60
2.4
1.26
40.20
41.45
2.5
1.36
32.33
33.69
2.6
1.47
26.23
27.70
2.7
1.58
21.45
23.03
2.8
1.70
17.67
19.36
2.9
1.82
14.65
16.47
3
1.94
12.23
14.17
3.1
2.07
10.27
12.33
3.2
2.20
8.67
10.87
3.3
2.34
7.35
9.69
3.4
2.48
6.27
8.75
3.5
2.62
5.37
8.00
3.6
2.77
4.62
7.40
3.7
2.93
4.00
6.92
3.8
3.08
3.47
6.55
3.9
3.24
3.02
6.26
4
3.41
2.64
6.05
4.1
3.58
2.31
5.89
4.2
3.75
2.03
5.78
800
700
September
October
November
December
Janauary
February
March
April
600
500
400
300
200
300
4.3
4.4
4.5
Minimum total cost (million NRs.)=
Optimum diameter of tunnel =
3.93
4.11
4.30
5.70
4.40 m
1.79
1.59
1.41
5.72
5.70
5.70
200
100
0
1.5
DISCHARGE(m3/s)
S.No.
15.62
46.21
119.84
148.89
102.59
46.12
22.79
15.43
11.62
10.08
9.62
10.89
discharge
1
2
3
4
5
6
7
8
9
10
11
12
exceedence
period
148.89
8.33
119.84
16.67
102.59
25.00
46.21
33.33
46.12
41.67
22.79
50.00
15.62
58.33
15.43
66.67
11.62
75.00
10.89
83.33
10.08
91.67
9.62
Wet season
operating days power (MW) Dry season (GWh) (GWh)
31
9.91
7.37
30
20.29
14.61
31
20.29
15.09
31
20.29
15.09
100.00
30
31
30
31
31
28
31
30
20.29
20.29
14.76
9.79
7.21
6.16
5.86
6.72
14.61
15.09
10.63
7.28
5.36
4.14
4.36
4.84
18.70
118.48
cost of
bolting &
Cost of
Excavation cost shotcrete(mill Cost of
PCC(million
(million NRs.)
ion NRs.)
RCC(million NRs.) NRs.)
8.83
0.00
0.00
9.70
0.00
0.00
10.61
0.00
0.00
11.57
0.00
0.00
12.56
0.00
0.00
13.60
0.00
0.00
14.68
0.00
0.00
15.80
0.00
0.00
16.96
0.00
0.00
18.16
0.00
0.00
19.40
0.00
0.00
20.69
0.00
0.00
22.01
0.00
0.00
23.38
0.00
0.00
24.79
0.00
0.00
26.24
0.00
0.00
27.73
0.00
0.00
29.26
0.00
0.00
30.83
0.00
0.00
32.44
0.00
0.00
34.09
0.00
0.00
35.79
0.00
0.00
37.53
0.00
0.00
39.30
0.00
0.00
41.12
0.00
0.00
42.98
0.00
0.00
99.78
Total annual
cost(million
NRs.)
0.00
0.88
0.00
0.97
0.00
1.06
0.00
1.16
0.00
1.26
0.00
1.36
0.00
1.47
0.00
1.58
0.00
1.70
0.00
1.82
0.00
1.94
0.00
2.07
0.00
2.20
0.00
2.34
0.00
2.48
0.00
2.62
0.00
2.77
0.00
2.93
0.00
3.08
0.00
3.24
0.00
3.41
0.00
3.58
0.00
3.75
0.00
3.93
0.00
4.11
0.00
4.30
Hydraulic
Flow velocity
radius ,R (m)
(m/s)
constant
0.50
8.40
0.53
7.62
0.55
6.94
0.58
6.35
0.60
5.83
0.63
5.38
0.65
4.97
0.68
4.61
0.70
4.29
0.73
4.00
0.75
3.73
0.78
3.50
0.80
3.28
0.83
3.09
0.85
2.91
0.88
2.74
0.90
2.59
0.93
2.45
0.95
2.33
0.98
2.21
1.00
2.10
1.03
2.00
1.05
1.91
1.08
1.82
1.10
1.74
1.13
1.66
2.2
Energy
1477705.18
12271397.79
12680444.38
12680444.38
2.3
Energy
1131766.58
9398598.63
9711885.25
9711885.25
maximum
capacity loss in Mannings
KW (Pmax)
headloss(m)
1.18
31782.94
80.04
0.88
23716.92
61.70
0.66
17940.64
48.14
0.51
13740.64
37.98
0.39
10644.04
30.27
0.31
8331.71
24.35
0.24
6584.67
19.75
0.19
5250.39
16.15
0.16
4221.10
13.30
0.13
3419.68
11.03
0.10
2790.27
9.21
0.08
2291.94
7.73
0.07
1894.41
6.53
0.06
1575.04
5.54
0.05
1316.74
4.72
0.04
1106.54
4.05
0.03
934.46
3.48
0.03
792.80
3.01
0.03
675.57
2.61
0.02
578.08
2.27
0.02
496.61
1.99
0.02
428.22
1.74
0.01
370.58
1.53
0.01
321.78
1.35
0.01
280.32
1.19
0.01
244.96
1.06
2.4
Energy
2.5
Energy
876710.95
7280524.52
7523208.67
7523208.67
686252.32
5698887.28
5888850.19
5888850.19
2.6
Energy
542355.18
4503913.40
4654043.85
4654043.85
12271397.79
12680444.38
4725417.18
1423449.80
568697.73
321273.33
305156.29
445336.95
9398598.63
9711885.25
3619172.01
1090212.67
435562.58
246061.55
233717.59
341081.21
7280524.52
7523208.67
2803553.13
844521.66
337403.92
190608.96
181046.85
264214.94
5698887.28
5888850.19
2194503.05
661055.90
264105.55
149200.65
141715.83
206816.30
4503913.40
4654043.85
1734347.64
522442.08
208726.45
117915.44
112000.08
163449.93
70210700.88
1640464.31
71851165.19
350.79
53774004.26
1256422.93
55030427.20
268.67
41655460.80
973274.67
42628735.47
208.12
32606136.43
761838.33
33367974.76
162.91
25769103.25
602091.90
26371195.14
128.75
35.38
27.10
20.99
16.43
12.99
800
700
600
500
400
300
200
Diameter of tunnel(m)
300
Diameter of tunnel(m)
200
100
0
1.5
2.5
flo
160
120
100
80
60
40
20
0
Exceedence %
0
Month
May
June
July
August
10
20
Energy
generation
7.37
14.61
15.09
15.09
Discharge (m3/s)
140
30
18
16
14
12
10
8
6
4
2
40
September
October
November
December
Janauary
February
March
April
14.61
15.09
10.63
7.28
5.36
4.14
4.36
4.84
16
14
12
10
8
6
4
2
0
May
June
Ju
Maximum
Energy
power
loss(KWh) in a
Annual loss
loss(KW)
year
Revenue loss of revenue
20021.9964426 175392688.83749
1052356133 106.28796944
15434.6855068 135207845.03999 811247070.24 81.935954094
12043.3246125 105499523.60531 632997141.632 63.932711305
9501.3554305 83231873.571165 499391241.427 50.438515384
7571.94413204 66330230.596708 397981383.58 40.196119742
6090.51443952 53352906.490211 320117438.941 32.331861333
4940.9390991 43282626.508084 259695759.049 26.229271664
4040.11705241 35391425.379132 212348552.275 21.44720378
3327.80489524 29151570.882282 174909425.294 17.665851955
2759.80269637 24175871.620201 145055229.721 14.650578202
2303.3185129 20177070.172972 121062421.038 12.227304525
1933.77076237 16939831.878383 101638991.27 10.265538118
1632.55368811 14301170.307878 85807021.8473 8.6665092066
1385.45687071 12136602.187402 72819613.1244 7.3547809256
1181.53465943 10350243.616646 62101461.6999 6.2722476317
1012.28885064 8867650.3315725 53205901.9894 5.3737961009
871.07193071 7630590.113019 45783540.6781 4.6241376085
752.647277559 6593190.1514138 39559140.9085 3.9954732318
652.862175897 5719072.6608534 34314435.9651 3.4657580325
568.402683052 4979207.5035311 29875245.0212 3.0173997471
496.608409618 4350289.6682526 26101738.0095 2.636275539
435.331527721 3813504.1828359 22881025.097 2.3109835348
382.828687662 3353579.3039193 20121475.8235 2.0322690582
337.677606112 2958055.8295423 17748334.9773 1.7925818327
298.712283735 2616719.6055189 15700317.6331 1.5857320809
264.972386098 2321158.1022185 13926948.6133 1.4066218099
2.7
Energy
432455.37
3591265.67
3710974.53
3710974.53
2.8
Energy
347676.78
2887233.65
2983474.78
2983474.78
2.9
Energy
281666.95
2339064.15
2417032.95
2417032.95
3
Energy
229824.52
1908545.82
1972164.01
1972164.01
3.1
Energy
188779.02
1567689.16
1619945.47
1619945.47
3591265.67
3710974.53
1382909.17
416577.35
166431.30
94021.72
89305.01
130329.35
2887233.65
2983474.78
1111803.54
334911.49
133804.09
75589.69
71797.65
104779.57
2339064.15
2417032.95
900716.78
271325.28
108400.08
61238.25
58166.16
84886.15
1908545.82
1972164.01
734934.63
221386.28
88448.41
49967.00
47460.34
69262.36
1567689.16
1619945.47
603679.01
181847.81
72651.97
41043.14
38984.17
56892.45
20547396.83
480087.38
21027484.20
102.66
16519283.46
385971.01
16905254.46
82.53
13382936.15
312690.64
13695626.79
66.86
10919729.12
255138.11
11174867.23
54.56
8969520.57
209571.73
9179092.31
44.81
10.35
8.32
6.74
5.50
4.52
3.5
4.5
8
6
4
2
0
8
6
4
2
40
50
60
70
Energy generation
80
90
6
4
2
0
8
6
4
2
0
May
June
July
August
September October
February
March
3.20
Energy
156035.71
1295776.95
1338969.51
1338969.51
3.3
Energy
129729.95
1077324.36
1113235.17
1113235.17
3.4
Energy
108455.20
900651.17
930672.87
930672.87
3.5
Energy
91141.38308
756870.979
782100.0117
782100.0117
3.6
Energy
76967.76511
639168.1338
660473.7382
660473.7382
1295776.95
1338969.51
498972.22
150306.71
60050.65
33924.30
32222.45
47024.58
1077324.36
1113235.17
414851.44
124966.79
49926.82
28205.07
26790.13
39096.80
7413777.08
173221.98
7586999.06
37.04
6163902.41
144018.81
6307921.22
30.80
3.74
3.11
al cost(million NRs.)
million NRs.)
900651.17
930672.87
346818.89
104473.16
41739.20
23579.65
22396.75
32685.21
756870.979
782100.0117
291452.6272
87795.03873
35075.93966
19815.3843
18821.32299
27467.33665
639168.1338
660473.7382
246128.1209
74141.8189
29621.19504
16733.84573
15894.37332
23195.82438
5153068.21 4330431.04
120400.80
101179.98
5273469.01 4431611.03
25.75
21.64
3656995.19
85445.24
3742440.43
18.27
2.60
2.18
1.84
80
90
100
tion
Energy generation
mber
Energy generation
Janauary
February
March
April
3.7
Energy
65300.053402
542275.23965
560351.08097
560351.08097
3.8
Energy
55644.5073
462092.096
477495.165
477495.165
3.9
Energy
47614.1722
395405.292
408585.468
408585.468
4
Energy
40903.82606
339680.1522
351002.8239
351002.8239
542275.23965
560351.08097
208817.02118
62902.498559
25130.853359
14197.125493
13484.910532
19679.518674
395405.292
408585.468
152260.972
45865.9717
18324.4074
10351.9728
9832.65433
14349.5134
339680.1522
351002.8239
130802.5747
39402.00238
15741.91752
8893.051711
8446.921649
12327.2121
1943477.18
45409.10
1988886.28
9.71
1.56
462092.096
477495.165
177940.44
53601.4652
21414.8975
12097.8776
11490.9738
16769.6206
1.33
1.14
0.98