Cir-Seam Fit-Up Inspection Report.

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

INCO ENGINEERING MANUFACTURING, TRADING A

DOC. TITLE: CIR-SEAM FIT-UP INS


PROJECT NAME:
DRAWING No:PED-242-05-001,REV-03

LS ORIENTATION:0AS PER EMAIL CONFORMATION

PLATE No:

DESCRIPTION
DRAWING REFERENCE
1. MATERIAL TRACEABILITY
A. PART No: (SHELL TO DISH END)
B. MATERIAL GRADE:
C. BARREL No:
D. HEAT No:
2. TOTAL LENGTH (TL TO TL)
3. OCF
4. INSIDE DIA.
5. THICKNESS.
6. JOINT # (SEAM #)
7. TYPE OF BEVEL
a. ROOT GAP

JOB No:

REQUIRED

b. BEVEL ANGLE
8. VISUAL OF TACK WELD.
LS-1 [0]
OVALITY :
ALIGNMENT (IF APPLICABLE
OFFSET CHECKED FOUND
GSCC QA/QC ENGINEER

INCO QA/QC ENGINEER

CLIENT

NAME:

NAME:

NAME:

SIGNATURE:

SIGNATURE:

SIGNATURE:

DATE:

DATE:

DATE:

DOC.No: OPR08-05A

REV.No:

DING AND CIVIL CONTRACTING CO. LLC


UP INSPECTION REPORT
DOC. No:
TAG / ITEM No
REPORT No:

RED

DATE:

ACTUAL

REMARKS.

CLIENT

REV.No: 00

A I (IF REQUIRED)

END USER

NAME:

NAME:

SIGNATURE:

SIGNATURE:

DATE:

DATE:
PAGE 1 OF 1

You might also like