MCPS Technical Design Guidelines

2 Site Work
3 Concrete
4 Masonry
5 Metals
6 Woods and Plastics
7 Thermal and Moisture Protection
8 Doors and Windows
9 Finishes
10 Specialties
11 Equipment
12 Furnishings
13 Special Construction
14 Conveying Systems
15 Mechanical
16 Electrical
Total subcontract bids as of 7/29/15
CM Fee
Construction Costs
Planning Costs
Contingency and Related Costs
Furniture and Equipment

MS #2 Bids
02 A, B, C, D, E, F, G Combo
03A Concrete
04A Masonry
05A Structural Steel/Metals
06A General Carpentry
07A Roofing
08A Windows and Glazing
09A Drywall and Acoustical
no bids posted
no bids posted
no bids posted
no bids posted
no bids posted
15A Mechanical and Plumbing
16A Electrical

Low
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

9,757,000
3,634,415
4,713,000
4,699,000
1,862,000
1,397,806
2,189,400
761,299
8,534,500
4,287,900

High
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

9,757,000
4,679,945
5,822,000
5,101,000
1,984,900
1,956,000
2,280,350
1,105,000
10,471,000
5,330,000

41,836,320 $

48,487,195

7% $

2,928,542 $

3,394,103.65

44,764,862 $

51,881,299

2,729,000 $

2,729,000

7% $

3,133,540 $

3,631,691

1,500,000 $

1,500,000

52,127,403 $

59,741,990

Notes in review of MCPS Guidelines


(only one bid on all sections)

does this include insulation?


does this include doors and hardware?
does this include paint, tile and floors?
toilet compartments, louvres and vents, toilet accessories, lockers, flagpoles
laundry, solid waste handling (where does kitchen equpment get picked up?)
educations and laboratory casework, media center furnishings
unknown
elevator
does this include fire protection?
does this include telecommunication equipment, data systems, AV systems for me

percentage estimated - could range higher or lower

from Option 1 Feasibility Study


percentage from Feasibility Study

es, lockers, flagpoles


ment get picked up?)

ystems, AV systems for media center?