2 Site Work
3 Concrete
4 Masonry
5 Metals
6 Woods and Plastics
7 Thermal and Moisture Protection
8 Doors and Windows
9 Finishes
10 Specialties
11 Equipment
12 Furnishings
13 Special Construction
14 Conveying Systems
15 Mechanical
16 Electrical
Total subcontract bids as of 7/29/15
CM Fee
Construction Costs
Planning Costs
Contingency and Related Costs
Furniture and Equipment
MS #2 Bids
02 A, B, C, D, E, F, G Combo
03A Concrete
04A Masonry
05A Structural Steel/Metals
06A General Carpentry
07A Roofing
08A Windows and Glazing
09A Drywall and Acoustical
no bids posted
no bids posted
no bids posted
no bids posted
no bids posted
15A Mechanical and Plumbing
16A Electrical
Low
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
9,757,000
3,634,415
4,713,000
4,699,000
1,862,000
1,397,806
2,189,400
761,299
8,534,500
4,287,900
High
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
9,757,000
4,679,945
5,822,000
5,101,000
1,984,900
1,956,000
2,280,350
1,105,000
10,471,000
5,330,000
41,836,320 $
48,487,195
7% $
2,928,542 $
3,394,103.65
44,764,862 $
51,881,299
2,729,000 $
2,729,000
7% $
3,133,540 $
3,631,691
1,500,000 $
1,500,000
52,127,403 $
59,741,990