Tentative Plan of Lifting Inspection + Flexible Hose Inspection Campaign 2012/1
Tentative Plan of Lifting Inspection + Flexible Hose Inspection Campaign 2012/1
Area
/ Field
Lifting Inspection
Team
GBN
Team 2
GBS
Team 1, 2 , 3
Team 1
PSB
Team 1, 2 , 3
PRP
Team 1
GBN
Flexible hose
inspection
Topside Platform
inspection
GBN
Topside Platform
inspection
PLAN / ACTUAL
Th
Sa
Su
Tu
Th
WP20
WP22
WP6
M
M
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
Note 2
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
Team 1
1.
2.
3.
4.
Team 2
1.
2.
3.
4.
Team 3
1.
2.
3.
4.
Sa
Su
Tu
Th
Sa
Su
Tu
Th
Sa
Su
Tu
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
M
M
Note:
1
Sanehar
(NDT II)
2
mankong (Helper)
mad (Helper)
boon (Helper)
un
(NDT II)
tana
(Helper)
nnarat
(Helper)
(Helper)
3
4
5
6
7
M
- Mobilization
DM - Demobilization
Revise #1
- NDT II of team 2 change from Mr.Archakit Sangthong to Mr.Prachit
- Mobilization date of team 2 was revised from March 7, 2012 to Mar
Note 1
: Team 2 & Team 3 was planned to response to PSB lifting
Flexible hose inspection: 1 PTTEP (Mr.Suppachai P.)
Lifting Campaign #1 - 2012 starts on March 2, 2012.
Note 2
: Team 1 & Team 3 was planned to response to PSB lifting
Note 3: 1 ABS + 1 DACON
: Topside Platform Inspection - General
*1 ABS + 1 DACON
: Topside Platform Inspection - General Cond
April (04/2012)
W
Th
Sa
Su
Tu
Th
Sa
Su
Tu
Th
Sa
Su
28
29
30
31
10
11
12
13
14
15
DM
M
Tea
Team 3 - GBS
- ART Mob 1
DM
Note 1
DM
DM
M
*1 ABS + 1 DACON
DM
April (04/2012)
M
Tu
Th
Sa
Su
Tu
Th
Sa
Su
Tu
Th
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
SB - Onshore
DM
DM
DM
Team 1 - ART Mob 2
Team 3 - PSB - Onshore
M
DM
May (05/2012)
Sa
Su
Tu
Th
Sa
Su
Tu
Th
Sa
Su
Tu
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Th
Sa
Su
Tu
Th
24
25
26
27
28
29
30
31