Tentative Plan of Lifting Inspection + Flexible Hose In

Area
/ Field

Lifting Inspection
Team

GBN

Team 2

GBS

Team 1, 2 , 3

ART & NAD

Team 1

PSB

Team 1, 2 , 3

PRP

Team 1

GBN

Flexible hose
inspection

ART & NAD

Topside Platform
inspection

GBN

Topside Platform
inspection

PLAN / ACTUAL

Th

Sa

Su

Tu

Th

WP20

WP22

WP6

M
M

PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL

Note 2

PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL

Team 1

1.
2.
3.
4.

ABS: Mr.Apiwat Thongkaew


DACON: Mr.Chaiyaporn Sanehar (NDT II)
DACON: Mr.Kittiwoot Jaimankong (Helper)
DACON: Mr.Rosaen Laehmad (Helper)

Team 2

1.
2.
3.
4.

ABS: Mr.Pubase Thongsan


DACON: Mr.Archakit Sangthong Mr.Prachit Butro
DACON: Mr.Amorn Siriviboon (Helper)
DACON: Mr.Paisan Rattana (Helper)

Team 3

1.
2.
3.
4.

ABS: Mr.Manoon Chaneetong


DACON: Mr. Pichai Sae-fun (NDT II)
DACON: Mr.Noppanan Tannarat Mr.Nontachai Ku
DACON: Mr.Totsapon Leetana (Helper)

Topside Insp. 1. ABS: Mr.Chutchai Phromngam


2. DACON: Mr.Noppanan Tannarat (Helper)

ible Hose Inspection Campaign 2012/1


March (03/2012)
F

Sa

Su

Tu

Th

Sa

Su

Tu

Th

Sa

Su

Tu

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

Team 2 - GBN Mob 1

M
M

Team 1 - ART Mob 1

Team 3 - PSB - Onshore

Note 3: 1 ABS + 1 DACON

Note:
1

Sanehar

(NDT II)
2

mankong (Helper)

mad (Helper)

gthong Mr.Prachit Butrod (NDT II)

boon (Helper)

un

1 PTTEP (Mr.Suppachai P.)

(NDT II)

nnarat Mr.Nontachai Kulji

tana

(Helper)

nnarat

(Helper)

(Helper)

3
4
5
6
7

M
- Mobilization
DM - Demobilization
Revise #1
- NDT II of team 2 change from Mr.Archakit Sangthong to Mr.Prachit
- Mobilization date of team 2 was revised from March 7, 2012 to Mar
Note 1
: Team 2 & Team 3 was planned to response to PSB lifting
Flexible hose inspection: 1 PTTEP (Mr.Suppachai P.)
Lifting Campaign #1 - 2012 starts on March 2, 2012.
Note 2
: Team 1 & Team 3 was planned to response to PSB lifting
Note 3: 1 ABS + 1 DACON
: Topside Platform Inspection - General
*1 ABS + 1 DACON
: Topside Platform Inspection - General Cond

April (04/2012)
W

Th

Sa

Su

Tu

Th

Sa

Su

Tu

Th

Sa

Su

28

29

30

31

10

11

12

13

14

15

DM
M

Tea

Team 3 - GBS

- ART Mob 1

DM
Note 1

Team 2 - PSB - Onshore

Team 1 - PSB - Onshore

DM
DM
M

*1 ABS + 1 DACON

DM

Sangthong to Mr.Prachit Butrod


m March 7, 2012 to March 2, 2012 (transfer by vessel)
to response to PSB lifting inspection (onshore) during March 31, 2012 - April 2, 2012.

to response to PSB lifting inspection (onshore) during March 2 - 11, 2012.


orm Inspection - General Condition Survey with NDT (5 years)
nspection - General Condition Survey (yearly)

April (04/2012)
M

Tu

Th

Sa

Su

Tu

Th

Sa

Su

Tu

Th

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

SB - Onshore

Team 2 - GBN Mob 2

DM

DM

DM
Team 1 - ART Mob 2
Team 3 - PSB - Onshore
M

DM

May (05/2012)
Sa

Su

Tu

Th

Sa

Su

Tu

Th

Sa

Su

Tu

10

11

12

13

14

15

16

17

18

19

20

21

22

23

Th

Sa

Su

Tu

Th

24

25

26

27

28

29

30

31

You might also like