Coal Flow Chart

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 4

ITM COAL PROJECT

ITM Coal Project In Kalimantan

1. Indominco Mine located in Bontang city, East Kalimantan.


2. Kitadin Mine located in Samarinda city, East Kalimantan.
3. Jorong Mine located in Banjarmasin city, South Kalimantan.
4. Trubaindo Mine the ITM premium grade coal operation, located in Melak city, East Kalimantan.
5. Bharinto Mine located in Muara Teweh city, Central Kalimantan, which is now under a feasibility study and
expected to
commence its operation in second half of 2009

Transportation Flow Mine to Port


PAMA
Dirty coal stock

TDM
Dirty coal stock

HAULING
7 - 9 Km
PAMA WEST PIT
ROM 1

WASHING PLANT
Cap. 245,000 t

60,000 t

CRUSHER 1
1200 t/hr

PAMA EAST PIT

ROM 3
TDM PIT

MINE
STOCKYARD 1

Cap. 30,000 t

45,000 t

CRUSHER 3

35 Km
HAULING
40 - 90 t
2.5 hour cycle

25 Km
HAULING
40 - 90 t
2.0 hour cycle

MINE
STOCKYARD 3

PORT
STOCKYARD

450,000 t

600 t/hr

800 t/hr

CRUSHER 2

MINE
STOCKYARD 2

Cap. 45,000 t

HAULING

+ 15 Km
ROM 2

60,000 t

33 Km
HAULING
40 - 90 t
2.4 hour cycle

6.5 Km
HAULING
CONVEYOR
3500 t/hr

SHIP
LOADER

CRUSHER 1 FACILITY
WASH PLANT FACILITY
CRUSHER 2 FACILITY

CRUSHER 3 FACILITY

Sky line
C31

C22

Top soil spreading

Revegetation

Dumping of waste
Land Clearing &
Stripping of top soil

Drilling and blasting of


Overburden
Coal
mining

ROM

Stripping of
overburden

Mine Stockyard

COAL FLOW
PT. INDOMINCO MANDIRI

Coal crushing

Coal Transport 35 km
To Port Stock yard

Oversea Conveyor 2,5 Km


Overland Conveyor 4 Km

Port Stockyard 350,000 t

Shipping

You might also like