YJ ENGINEERING CONSULTING

POWER MANAGEMENT SYSTEM - HIGH VOLTAGE DISTRIBUTION


PT KAWASAN INDUSTRI DUMAI

11 KV BUS WX #2

11 KV BUS WX1

11KV BUS
MV-MDP

TG 20A

EXCITATION TR.
11KV / 400V

TR 400V/11 KV X 5
UNITS

TG 20B

#1 ID FAN
SYNCRO
MSB 20

SPARE
MT21
SKL G/S 3X

LOAD

#1 HOUSE
SERV XFMR
(UAT)

G/S

NPK
NPK
PLANT PLANT

PK
PLANT II

CUMMIN
Genset

EXC.
CONT.
SYST.

FERTLZR
PLANT

PK PLANT
400V

EXCITATIO
N TR.
11KV /
400V

#3 FW
PUMP

#1 FW
PUMP

#2 HOUSE
SERV XFMR
(UAT)
#2 FW PUMP

#1 SEA WATER
PUMP
EXC.
CONT.
SYST.

41F
CB
400V BUS #1

11KV, 0.8 PF

F
R
A
C
T

R
E
F

C
O
O
L
I
N
G

EXC.
CONT.
SYST.

#2 ID FAN
#2 SEA
WATER PUMP

41FCB

41FCB

11KV, 0.8 PF

11KV, 0.8 PF

PKS

EXCITATION TR.
11KV / 400V

SPARES

#3 SEA
WATER PUMP

400V BUS #2
FIELD
FLUSHING

LOAD TO CUSTOMERS

G/S

DEUZT
Genset

FIELD
FLUSHING

FIELD
FLUSHING
400V

WB
1

WB
2

LOAD TO CUSTOMERS

DG 2000
KVA X 5
UNITS
COMPRISED WITH AUTOMATIC
TRANSFER SWITCH (ATS) &
SEQUENCHER

TG5 UNIT
10 MW, 50HZ, 0.8 PF
FIBER BOILER

Scenario 7
Wuxi Unit 2 Start Up power taken from Cummin
Genset via tie braker 11 KV bus Wuxi Unit 1 & 2

WUXI UNIT 1
15 MW, 50HZ, 0.8 PF
COAL FIRED BOILER

400V

WUXI UNIT 2
15 MW, 50HZ, 0.8 PF