Shift Hand-Over Report: REV 00 SEPTEMBER 1, 2011 Form No: HQS-OPS-PP-01 FM 04

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

SHIFT HAND-OVER REPORT

Installation / Facility: CS 1

Crew / Department: Drilling

Date: July 29, 2015

Time: 0600 Hrs.

Mud Status: Green


Present Operations:
- Cont. displace well with 1.08sg Brine.
- 107stands + 02 singles + 4.69m p/joint in hole.

Upcoming Operations:
- Flush surface lines with 1.08sg Brine.
- Pressure test casing.
Equipment Status (Including Equipment Under Repair)
- Standpipe lined up for drilling.
- 4 Engines online with SCR 1 selected.
- TDS m/up Tq. Set to 20k.
- Choke manifold, choke lines and kill lines filled up with soap. Need to be flushed with Brine.
- Need to flush standpipe line going to choke manifold with Brine.
Permits and/or Isolations in Place:
- As required.

Other Comments:
- Two times pumped wash train.
- Top single of stand # 108 is on Casing platform.
- Trip tank lines needs to be flushed with Brine.
- Casing fill up valve at shaker house is open.
- Drain valve for Poor Boy Degasser is open.
Incoming Supervisor
(Name): Daniel

Position:
Driller

Signature:
Signature:

Outgoing Supervisor
(Name): Sandeep

Position:
Driller

Signature:

REV 00

SEPTEMBER 1, 2011

Form No:

HQS-OPS-PP-01 FM 04