OIL RIG MOVILIZATION

Rigs are normally on the mole, and their efficient relocation is essential to maximizing the vawe
the give to oil corporations.
A drill rig comes in uniques types, shapes and sizes. That`s why drill rig transporting call for
special clear.
A drill rig might be classified by the power utilized, height, drilling technique, or the position
with the derrick.
You can also find diverse forms of drill rigs based on the types of drill utilized to bore holes into
the ground. You will discover a variety of rigs on land, along with drilling ships that go out to
sea, and submersible rigs. Whereas drilling ships patrol the sea looking for oil in deep and for
areas, submersible rigs are applied in fixed places in breams, swamps, and lakes.
Drill rig relocation has to match the form of drill rig being hauled. Generally, more effective
trucking gear is better, however it might be overkill for certain jobs. Units with suitable capacity
and load are required and, in some cases, even helicopters are necessary. Man parts of rig
equipment have their own difficulties, and having a trucking unit that is able to manage each
one is essential for success. Drilling rigs are for more complex to move than service rigs, and
also need a more diverse selection of units to haul efficiently.

RIG UP
Rigging up is placing and assembling the various parts of equipment that make up the rig, and
preparing the rig for drilling.
The rigging up process includes the following steps, some of which are done simultaneously.

Setting up the substructure.


Setting up the rig floor and mast or derrick.
Installing handrails, guardrails, stairs, walkways and ladders.
Installing the power system.
Rigging up the awaiting system.
Installing the auxiliary equipment.
Inspecting the rig.
Rigging down.
Inspecting the rig