ers EMSTEC Hoses »
Contact
Imprint
About us.
Home Dredging Oil Field Fender/Profiles Deck Equipment Steel Construction Engineering
Tandem Mooring Systems
EMSTEC Tandem Mooring Systems provide safe and efficient tandem mooring operations between FPSO and Shuttle Tankers. The systems provide a means
for storage, deployment and recovery of the Mooring Hawser / chafe Chain / messenger line assembly and integrated mooring point, with full load quick
release facility. In addition, hydraulic power / control utlity and load monitoring / data logging equipment can be incorporated. Various systems are available,
specifically configured and designed to sult individual applications and installations worldwide. The Tandem Mooring Systems can complement our range of
Fluid Transfer Systems utilizing common power and control arrangements. EMSTEC provide comprehensive and fully integrated systems with reliable and
simple operation. Systems are tailored to meet specific client requirements.
ipuhuwremstec rel-feldtandem-mooring-system php ners EMSTEC Hoses »
‘+ FPSOIFSO Tandem Crude Oil Loading / Offloading
‘+ LNG FPSO Tandem Condensate Offloading
+ CALMCrude Oil Offoading
Oureq
ment Solutions
‘+ Mooring Hawser Ree! Storage systems
‘+ Integrated mooring point clw Emergency Release (Full-load)
‘+ Load Monitoring / Data Logging system
‘+ Mooring Hawser assemblies (OCIMF 2000)
+ InboardiOutboard Fairleads
‘+ Single/Double Mooring Hawser Configurations
‘+ ETS (IMO-MSC 35(63))
+ Special/Bespoke systems
Our equipment integration
Electro/Hydraulic Power or Ring Main systems
+ PLC Contro! & Monitoring systems
+ ICSinterfaces
‘+ Foundation/Deck Loading analysis
‘Special application on request
Emstec GmbH Tel: +49 (0)40 79686345 Contac
‘ew erbering 8 Fax: 449 (0)40 79686702 Imprint
113 Oststeinbek About us
Germany
ipuhuwremstec rel-feldtandem-mooring-system php