The Hardrock Concrete Company has plants in three locations and is currently
working on three major construction projects, each located at a different site. The shipping
cost per truckload of concrete, daily plant capacities, and daily project requirements are
provided in the table below.
(a) Formulate an initial feasible solution to Hardrocks transportation problem using the
northwest corner rule. Then evaluate each unused shipping route by computing all
improvement indices. Is this solution optimal? Why?
(b) Is there more than one optimal solution to this problem? Why?
Answer :
(a) Menggunakan Metode Northwest Corner Solution:
Tujuan
Project A
Plant 1
Sumber
10
40
12
11
20
30
Plant 3
Requirements
Plant
Capacities
Project C
30
Plant 2
Project
Project B
6
30
40
50
60
70
50
30
150
Metode NCS di atas belum tentu menghasilkan solusi optimal, untuk mengecek apakah ada
solusi yang lebih baik atau tidak, maka digunakan Metode Stepping Stone sebagai berikut:
Path: Plant 1
Tujuan
Project A
Plant 1
Sumber
Project B
10
40
12
Plant 2
Plant 3
30
20
40
Project C
11
8
30
30
50
Plant
Capacities
70
50
30
60
150
Project C
Plant
Capacities
Tujuan
Project A
Plant 1
Sumber
Project B
10
40
12
Plant 2
Plant 3
30
20
40
11
8
30
30
50
70
50
30
60
150
Project C
Plant
Capacities
Tujuan
Project A
Plant 1
Sumber
Project B
10
40
12
Plant 2
Plant 3
30
20
40
11
8
30
30
50
70
50
30
60
150
Project C
Plant
Capacities
Tujuan
Project A
Plant 1
Sumber
Project B
10
40
12
Plant 2
Plant 3
30
20
40
7
50
11
8
30
30
60
70
50
30
150
Dari perhitungan diatas dapat dilihat bahwa solusi eksisting sudah merupakan solusi optimal,
karena tidak terdapat perhitungan yang bernilai negatif atau tidak ada pengurangan biaya
akibat penambahan pengiriman melalui jalur-jalur yang belum digunakan.
(b) Terdapat solusi optimum lain. Berdasarkan perhitungan di atas setiap pengiriman truk
dari Plant 3 ke Project A memberikan hasil 0 yang berarti besarnya biaya pengiriman
total sama dengan solusi eksisting. Dengan adanya pengiriman dari Plant 3 ke Project A,
maka jalur-jalur yang digunakan adalah:
Solusi Eksisting
Tujuan
Project A
Plant 1
Sumber
Project B
10
40
12
Plant 2
Plant 3
Project
Requirements
Project C
4
30
11
20
40
50
70
30
Plant
Capacities
50
30
30
60
Plant
Project
Capacities
1
1
2
2
3
A
B
B
C
C
40
30
20
30
30
10
4
5
8
6
Total
150
Total
Cost
400
120
100
240
180
1040
Solusi Baru
Tujuan
Project A
Plant 1
Sumber
10
20
12
Plant 2
Plant 3
Project
Requirements
Project B
4
50
20
Project C
40
50
11
8
50
10
60
Plant
Project
Capacities
Total Cost
1
1
2
3
3
A
B
C
A
C
20
50
50
20
10
10
4
8
9
6
Total
200
200
400
180
60
1040
Plant
Capacities
70
50
30
150
Dari perhitungan diatas dapat dilihat bahwa solusi baru memberikan hasil yang sama dengan
solusi eksisting yang berarti terdapat 2 solusi optimal.
Dengan menggunakan Program QM For Windows-Transportation diperoleh output hasil
sebagai berikut:
Dari atas dapat dilihat Total Cost Optimal sama saja seperti perhitungan manual dengan
menggunakan Metode SS.
9-14) Hardrock Concretes owner has decided to increase the capacity at his smallest plant
(see Problem 9-13). Instead of producing 30 loads of concrete per day at plant 3, that plants
capacity is doubled to 60 loads. Find the new optimal solution using the northwest corner rule
and stepping-stone method. How has changing the third plants capacity altered the optimal
shipping assignment? Discuss the concepts of degeneracy and multiple optimal solutions with
regard to this problem.
Answer :
Metode Northwest Corner Solution:
Tujuan
Project A
Plant 1
Sumber
10
40
12
Plant 2
Plant 3
Project
Requirements
40
Project B
Project C
30
20
7
50
Plant
Capacities
Dummy
11
70
30
30
60
50
0
30
30
60
180
Plant 1 to Dummy
1,D - 1,B + 2,B -2,C + 3,C - 3,D
=0-4+5-8+6-0=-1
Plant 2 to Project A
2,A - 2,B + 1,B - 1,A = + 1 (dari solusi 9-13)
Plant 2 to Dummy
2,D - 2,C + 3,C - 3,D
= 0 - 8 + 6 - 0 = -2
Plant 3 to Project A
3,A - 3,C + 2,C -2,B + 1,B - 1,A = 0 (dari solusi 9-13)
Plant 3 to Project B
3,B - 3,C + 2,C -2,B = + 4 (dari solusi 9-13)
Berdasarkan hasil perhitungan di atas, ternyata dengan menambahkan pengiriman dari Plant 2
ke Project Dummy akan menghasilkan solusi optimal baru, yaitu pengurangan $2 setiap truk
yang dikirim, maka solusinya adalah sebagai berikut:
Tujuan
Project A
Plant 1
Sumber
10
40
12
Plant 2
Plant 3
Project
Requirements
Project B
40
30
20
50
Project C
4
11
60
60
Plant
Capacities
Dummy
70
30
50
60
30
180
Dari solusi baru, tersebut, perlu diuji lagi apakah ada solusi yang lebih baik atau tidak sebagai
berikut:
Plant 1 to Project C
Tidak dapat diselesaikan
Plant 1 to Dummy
1,D - 1,B + 2,B -2,D
=0-4+5-0=+1
Plant 2 to Project A
2,A - 2,B + 1,B - 1,A = + 1 (dari solusi 9-13)
Plant 3 to Project A
Tidak dapat diselesaikan
How has changing the third plants capacity altered the optimal shipping assignment?
Dengan adanya penambahan kapasitas pada pabrik 3, maka semua kebutuhan project C dapat
dipenuhi oleh pabrik 3 (dimana biayanya paling murah) sehingga total cost menjadi
berkurang.
Discuss the concepts of degeneracy and multiple optimal solutions with regard to this
problem.
Dalam kasus ini, masalah degeneracy muncul setelah dilakukan iterasi sekali yang
menyebabkan jumlah kotak yang diisi berkurang menjadi 5 (dimana seharusnya berjumlah
4+3-1=6) sehingga membuat adanya solusi yang tidak dapat dicari hasilnya (karena tidak
dapat ditentukan loop-nya) sehingga metode stepping-stone tidak dapat digunakan.
Oleh karena itu tidak dapat dicari tahu apakah ada solusi optimal yang lebih baik atau yang
memberikan hasil yang sama dengan menggunakan metode stepping-stone.
Dengan menggunakan Program QM For Windows-Transportation diperoleh output hasil
sebagai berikut:
Dari atas dapat dilihat Total Cost Optimal sama saja seperti perhitungan manual dengan
menggunakan Metode SS.
9-15) Formulate the Hardrock Concrete Company transportation problem in Problem 9-13 as
a linear program and solve using computer software. What would change in the linear
program if the change in Problem 9-14 were implemented?
Answer :
Dengan menggunakan Program QM For Windows-Linear Programming diperoleh output
hasil sebagai berikut:
Dari tabel diatas dapat dilihat bahwa Total Cost nya sama seperti perhitungan pada soal 9-13
yaitu Total Cost = $1040.
Tapi setelah kapastitas Plant 3 diubah menjadi 60 , maka Total Cost nya berubah seperti
diperlihatkan tabel berikut.
Dari tabel diatas dapat dilihat bahwa Total Cost berubah menjadi Total Cost = $980 , sama
seperti perhitungan pada soal 9-14.
9-24) The state of Missouri has three major power-generating companies (A, B, and C).
During the months of peak demand, the Missouri Power Authority authorizes these
companies to pool their excess supply and to distribute it to smaller independent power
companies that do not have generators large enough to handle the demand. Excess supply is
distributed on the basis of cost per kilowatt hour transmitted. The following table shows the
demand and supply in millions of kilowatt hours and the cost per kilowatt hour of
transmitting electric power to four small companies in cities W,X,Y, and Z:
Find an initial transmission assignment of the excess power supply. Then find the least-cost
distribution system.
Answer :
Tujuan
W
A
Sumber
12
40
Y
4
Z
9
15
8
1
5
40
C
Power
Demand
12
4
10
40
20
7
20
50
20
Excess
Supply
55
45
30
130
9-25) Consider the transportation table given below. Find an initial solution using the
northwest corner rule. What special condition exists? Explain how you will proceed to solve
the problem.
Answer :
Destination A
Source 1
Source 2
Sumber
Tujuan
Destination B Destination C
9
4
72
5
38
Source 3
34
5
Source 4
Project
Requirements
12
3
7
19
110
34
31
Supply
72
38
46
19
175
Stepping-stone berhenti di iterasi ke-4 karena sudah optimal, total biaya menjadi:
41(8) + 31(4) + 23(5) + 15(6) + 46(7) + 19(3) = $1036
Selain itu terdapat 1 alternatif solusi yang menghasilkan total biaya yang sama, yaitu dengan
menggunakan kotak 1-B sebagai berikut:
To
From
Destination A
Source 1
26
Source 2
38
From
Source 3
46
110
15
Destination C
31
Source 4
Project
Requirements
Destination B
19
34
31
Supply
72
38
46
19
175