Professional Documents
Culture Documents
MTL
MTL
1.
A brief Introduction
Management and Operation
11
2.
Curriculum Vitae
21
3.
Services
31
4.
41
5.
51
6.
Load Test
Insitu California Bearing Ratio
61
64
7.
Crack Monitoring
Settlement Monitoring
71
8.
Field Density
81
9.
Dilapidation Survey
91
73
10.
10 1
11.
11 - 1
12.
Plate Bearing
Temperature Monitoring
12 - 1
12 - 3
13.
Concrete Coring
13 - 1
14.
Bridge Testing
14 - 1
15.
15 - 1
16.
16 - 1
17.
Site Laboratory
17 - 1
18.
Overseas Project
18 - 1
19.
19 1
20.
Rock Test
20 - 1
21.
21 1
22.
22 1
23.
23 1
24.
24 - 1
1-1
A BRIEF INTRODUCTION TO MATERIALS TESTING LABORATORY SDN BHD
Materials Testing Laboratory Sdn Bhd was established in 1984 to provide materials
testing services to the construction industry in Malaysia by two engineers with extensive
experience in the concrete instrumentation and testing fields.
The Director/Engineer is Mr Munning Jamaludin, who has more than 20 years
experience in the testing and instrumentation fields. He is in charge and responsible
for all testing/instrumentation works carried out by the Company. In addition, he is
supported by trained technical staff with many years of testing experience.
The Companys laboratory is located in Kuala Lumpur and as latest testing equipment
conforming to the relevant British Standards or Malaysian Standards.
MANAGEMENT AND OPERATIONS
DIRECTOR / ENGINEER : Mr Munning Jamaludin
ENGINEERS : Ms Siti Nor Akhma Binti Abdul Razak
Ms Nurliyana Bt Mohd Hanafi
Mr Luqmanhakim Bin Zainal
GEOLOGISTS : Ms Engku Nazreen Bt Tuan Mohamad
Yusof
Ms Nur Liayana Bt Che Jamil
Ms Nur Syairah Bt Jamil
TECHNICIANS : Mr Yap Yoon Hong
Mr Syamsul Zakaria
Mr Yee Ying Kor
Mr Md Fakhrul Ashir
Mr Mohamad Haris Wahid
Mr Mohd Zaharuddin Abdul Wahab
Mr Zulkarnain Razali
Mr Mohd Affendy Yunus
Mr Norhisyam Nordin
Mr Khairul Izman Shamsuddin
Mr Zamri Bin Ali Omar
Mr Muhammad Abdullah Bin Mohd Nor
Mr Mohd Solahuddin Bin Hudin
Mr Jonathan Gerald Stephen
ADMINISTRATION : Ms Angie Ng
Ms Chin Lee Lee
Ms Nor Baizura Mohd Salleh
Ms Siti Fazirah Akma Bt Mat Nawi
Ms Nor Aslinda Muhamad
Ms Lydia Liew
Mr Alex Kor
Ms Chan Why Yee
Ms Nor Fatihah Bt Abd Wahab
Ms Siti Rosmizan Bt Ab Halim
12
For technical enquiries, complaints and feedback, please contact any one of the
following :
Mr Munning Jamaludin : H/P : 019-2747433
Ms Angie Ng
: Tel : 03-79828757 or 79827325, Fax : 03-79813625
2-1
CURRICULUM VITAE OF DIRECTOR / ENGINEER
NAME
Munning Jamaludin
DATE OF BIRTH
3 April 1953
NATIONALITY
Malaysian
ACADEMIC QUALIFICATION
PROFESSIONAL AFFILIATION
1977 - 1979
Test Engineer of TEST SDN BHD in
charge of all concrete and soil testing,
laboratory as well as field and
geotechnical
and
concrete
instrumentation
1979 - 1984
Manager/Director of TEST SDN BHD
1984 - PRESENT
Director/Engineer
of
MATERIALS
TESTING LABORATORY SDN BHD
1987 - PRESENT
Director/Engineer
of
INSTRUMENTS SDN BHD
CE
Design of mix, trial mix and production quality control of 170 lb/ft3 and 220 lb/ft3
concrete for Atomic Reactor for PUSPATI, BANGI (Tun Dr Ismail Research
Centre)
2)
Design of mix and trial mix of concrete using alternative cement instead of low
heat cement for mass concrete for COMMUNICATION CENTRE, LUMUT NAVAL
BASE
3)
Concrete coring and testing, Ultrasonic Pulse Velocity testing and determination
of size and position of steel reinforcement for assessment of suitability to
convert ABAD CENTURY HOTEL to an office complex
2-2
4)
5)
6)
Design of mix and trial mix of 200 lb/ft3 concrete for CANCER UNIT, KUCHING
GENERAL HOSPITAL
7)
8)
Design of trial mixes and quality control procedures of concrete for PROMET
BHD for LUXURY CONDOMINIUMS at NORTHAM ROAD, PENANG
9)
10)
11)
12)
13)
14)
15)
16)
2-3
17)
18)
19)
20)
21)
22)
Installation and monitoring of Load Cells and Earth Pressure Cells for load test
on slab and 9-pile group, for HO HUP CONSTRUCTION CO BHD at Proposed
Maruichi Factory
23)
Setting up of site laboartory for cube testing and Ultrasonic Pulse Velocity tests
on precast piles and cast insitu concrete for HO HUP CONSTRUCTION CO
BHD at Proposed Maruichi Factory
24)
25)
Supply, install and monitor Resistance Wire Strain Gauges on steel H-Piles at
Bangi for PUSAT PENYELIDIKAN DAN LATIHAN, JABATAN KERJA RAYA
26)
Installation and monitor DEMEC Gauges over cracks and Settlement Points at
shophouses on Jalan Leboh Pudu for LIM BOON LEONG AND SONS SDN
BHD
27)
2-4
28)
Soil Investigation at :
-Maruichi Factory for HO HUP CONSTRUCTION CO BHD
-Sumiputeh Steel Centre for HO HUP CONSTRUCTION CO BHD
-Steel Mill Jalan Bukit Raja, Shah Alam for AKITEK SUPRA
-Proposed Esso Service Station at Jalan Raja Udang for ESSO MALAYSIA BHD
-Upgrading at Bukit Damansara for SRI PERUNDING
-Rumah Pangsa 5 Tingkat di atas 1128, Damansara for BG JURUTERA
PERUNDING SDN BHD
29)
Setting up site laboratory for cube testing, Ultrasonic Pulse Velocity, concrete
coring and etc for the UNIVERSITI UTARA MALAYSIA, SINTOK, KEDAH
30)
Carry out Ultrasonic Pulse Velocity tests at Puteri Pan Pacific Hotel for
BUILDCON BHD
31)
32)
33)
Carry out Ultrasonic Pulse Velocity tests for JB Condominium, Johor Bahru for
HO HUP CONSTRUCTION CO BHD
34)
35)
36)
Instrumented test piles using Vibrating Wire Strain Gauges and Resistance Wire
Strain Gauges at :
- Panggung Negara, Kuala Lumpur
(2 nos)
- Kuala Lumpur City Centre Tunnel
(5 nos)
- KL Inetrnational Airport, Sepang
Package PTC 1 : MTB, CP and BHS
(2 nos)
- Kuala Lumpur Light Rail Transit Phase 2
(5 nos)
- Elevated Highway over Sg Klang, Kuala Lumpur
(2 nos)
- Optima Jaya Office Complex, Kuala Lumpur
(1 no)
- Hotel Complex at Johor Bahru
(1 no)
37)
Strain gauging of concrete and steel bridges for load test (13 bridges in
Peninsular Malaysia) for PUBLIC WORKS DEPARTMENT
38)
2-5
39)
40)
Setting up site laboartory for cube testing, sieve analysis and CUSUM quality
programme for Berjaya Star City
41)
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
Radiation Safety and Use of Nuclear Gauges (16 May 2001) organised by CPN
International Inc., USA
11)
Use and Installation of Falling Weight Deflectometer PRI 2100 (2-3 December
2002) by Carl Bro Pavement Consultants, Denmark
12)
1)
MISCELLANEOUS
Representative of the Geotechnical Division of IEM on the SIRIM Committee for
Tanah, Aggregate, Mineral dan Tapak
2)
3)
4)
26
CURRICULUM VITAE OF ENGINEER
NAME
DATE OF BIRTH :
NATIONALITY
Malaysian
ACADEMIC QUALIFICATION
EXPERIENCE IN MATERIALS
TESTING LABORATORY SDN BHD
27
CURRICULUM VITAE OF GEOLOGIST
NAME
DATE OF BIRTH :
NATIONALITY
Malaysian
ACADEMIC QUALIFICATION
Bachelor
of
Applied
Science
(Geoscience) with Honours
Universiti Malaysia Kelantan, 20092013
EXPERIENCE
28
CURRICULUM VITAE OF GEOLOGIST
NAME
DATE OF BIRTH :
NATIONALITY
Malaysian
ACADEMIC QUALIFICATION
Bachelor
of
Applied
Science
(Geoscience) with Honours
Universiti Malaysia Kelantan, 20092013
EXPERIENCE
Kajang
i) Pasar Rakyat to Pudu
Launching Shaft
(Monitoring &
Reporting)
- Settlement Marker (Ground &
Building)
- Tiltmeter
- Inclinometer/Extensometer in soil
- Rod Extensometer
- Optical Prism
- VW Piezometer
- Crack meter (Tell-tale & Demec
Gauge)
- Magnetic extensometer
2) Calibration of :
- Digital Strainmeter TC-31M
- Load Cell
29
CURRICULUM VITAE OF GEOLOGIST
NAME
DATE OF BIRTH :
NATIONALITY
Malaysian
ACADEMIC QUALIFICATION
Bachelor
of
Applied
Science
(Geoscience) with Honours
Universiti Malaysia Kelantan, 20092013
INSTRUMENTATION EXPERINCE
1) Vibration Monitoring
2) Vibrating Wire Piezometer
3) Water Standpipe
4) Vibrating Wire Load Cell
5) Vibrating Wire Strain Gauge
6) Tiltmeter
7) Automatic Data Acquisition System
8) Ground Settlement Marker
9) Building Settlement Marker
10) Crack Gauge (Tell Tale, DEMEC)
11) Inclinometer
12) Optical Prism
PROJECTS INVOLVED IN :
2 10
ii) Pasar Rakyat to Pudu Launching
Shaft (Monitoring &
Reporting)
-
Mengandungi
Tempat
40404, Jalan
Lumpur
2 - 11
CURRICULUM VITAE OF SENIOR TECHNICIAN
NAME
DATE OF BIRTH :
NATIONALITY
Malaysian
ACADEMIC QUALIFICATION
SRP
COURSE ATTENDED :
and
Pavement Testing
- Falling Weight Deflectometer (FWD)
test
2 - 12
CURRICULUM VITAE OF SENIOR TECHNICIAN
NAME
Syamsul Zakaria
DATE OF BIRTH
10 May 1973
NATIONALITY
Malaysian
ACADEMIC QUALIFICATION
SPM
and
3-1
SERVICES
1)
2)
3)
4)
5)
6)
7)
8)
4-1
CUBES TESTING - LIST OF PROJECTS IN PROGRESS
NO.
1)
2)
3)
4)
5)
6)
7)
OUR CLIENT
Ahmad Zaki
AJC Venture
Alpace Engineering SB
Aneka Jaringan Sdn Bhd
Azde
Bestch
BUCG (M) Sdn Bhd
8)
9)
10)
Coldweld
Dorset
Econpile (M) Sdn Bhd
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
24)
25)
26)
Pasukhas
Pembinaan Infra E&J Sdn Bhd
Pesona Metro Sdn Bhd
Pintaras Geotechnics Sdn Bhd
27)
28)
29)
30)
31)
32)
33)
34)
Progamatic
Putra Perdana
RL&L
Sealand
Suncity
Sunway Geotechnics (M) Sdn Bhd
SW Builders
Tactcom Engineering Sdn Bhd
35)
Xin Ho
PROJECT
-
RMP Subang
Salak South
Ikano, Jalan Cochrane
KL 118
Taman Rimba
Sekinchan
Atria Damansara-Building At MSS
22/43 PJ
Banyan Tree
Putra Height
Dorset B.Bintang
Elite Pavillion
Ekocheras
Ara Damansara
PJ City
EP 418-IRDK Puchong
EP 415-IRDK Puchong
Cipta Klasik-Jalan Stonor
Development Parcel 3, Mid Valley
Swiss Misson Hotel, Lebuh Pasar Besar
Shamelin Star
Bandar Kinrara
RMP Subang
Setia Bakti, Sri Cempaka
Velocity Ph 3
Jalan Salam
Pantai Sentral Park
LRT Ampang Line
Robertson
Putra Height
Grand Zenth
Shopping Mall
Dang Wangi
Avantas Residences Jalan Klang Lama
Shamelin Star
Proposed 16 Storey Office Blk, Jln Inai KL
Pavillion Mont Kiara
KL 118 Storey
Quentum Quest
Savanna
Datum Incity
AHR
Serai, Bangsar
Vyne residency
Jalan Putra
Desa Hill
Velocity Phases 2 & 3, Jalan Peel
Mukim Ampang
Cameron
Continental Tyre
P364 Setapak-Wangsa Maju
Ulu Kelang
VSKLS
5-1
CUBE TESTING - LIST OF PROJECTS COMPLETED
NO.
OUR CLIENT
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
PROJECT
8
9
10
11
12
-
52
12)
13)
14)
15)
16)
17)
13 14 15 Novotel
OCBC Bank
Berjaya Star City
Primaland
Tenaga Building at PJ Section 13
Ireka Hotel
TNB, Jalan Timur (PJ)
Teo Hang Sam
Cadangan Pencawang Letrik Utama
132V Shah Alam
City Properties, Jalan Ampang
Guoman Hotel site
KL Sheraton Tower
Safety Development Jalan Pahang
Sujitec (Castel Property)
Proposed 15-Storey Office Building
at Jalan Tun H.S. Lee
330 Units Kota Perdana
Pantai Square
Vision City
CN Gallery
Berjaya City
Seni Harta
Galleria Jalan Pahang 517
Secant Wall Piles at Leboh Pasar
Besar Bridge
Genesis ll
Dataran Prima Condo
Upper East Ampang
Taman Lagenda Mas (Phase II)
Bukit Pantai Condominium
Proposed 16-storey Office Block,
Jalan Inai, KL
KL Eco City, Parcel A, Rti
Resident 61, Jalan Raja Chulan
Trillion Maxim, Cheras
16
17
18
19
20
21
22
23
18)
19)
20)
21)
22)
23)
24)
25)
KL Sentral
Guideway Beam
Rawang
Putrajaya Monorail
Bukit Bintang
Sungai Long
Putrajaya Building
J.C.I.D.S.R. Kluang, Johor
Cadangan Pembinaan Pari Induk
Dari Batu 6 Jalan Kepong Ke
Pertemuan Sungei Keroh
MBB Training Centre, Bangi
Proposed Extension to 3Storey/Warehouse
UPM Serdang
City Properties, Jalan Ampang
Heritage
Kuala Lumpur City Centre
PJ Development Kota Nulia
Sg. Buloh
TNB, Jalan Timur (PJ)
Visionwell
Plaza Potential
Cut & Cover
Pacific Treasure Hotel
53
26)
27)
28)
29)
30)
31)
32)
25
26
27
33)
34)
35)
36)
Bridgecon Readymix
37)
28
29
30
-
54
38)
39)
40)
32
41)
42)
43)
44)
45)
46)
47)
33
-
48)
49)
Vista Magna
Riverview Service Apartment
Naza HQ - Kg. Baru
KL Cheras City View Apartment
KLGCC - Parcel 128 Units Resort
Golf Villa
Wisma Shun Li
Berjaya Star City
Proposed 1 Block 7-Storey Car Park
at Lot 81 Section 96 Kuala Lumpur
Police Station Pandan Indah
80 Units of 2-Storey Shoplots,
Putra Perdana
40 Units of RTS (Daisy) DoubleStorey at Pandan Indah
Pump House
Taman Industry Puchong
Taman Shamelin
Rumah Teres
Desa Sri Hartamas
2 Units D/B at Jalan Ara Bangsar
Ng Lam Shens Bungalow
Budget Hotel
10 Blocks of Low Cost Apartments,
Mukim Batu
Sekolah Menengah Teknikal
Setapak
Chung Kwo School Jalan Loke Yew
KL Monorel
CSR Shah Alam
Jalan Syed Putra KL Sentral
Hang Tuah Station
Bukit Bintang
Jalan Pahang, A & B series
K38 Stadium Merdeka
Wawasan Station
Chow Kit Station
Hospital Ampang
Semenyih
KL Seremban Highway
Bangi
TTDI Phase 5E
Bungalow Damansara
Upgrading of Piperack at Liquid
Bulk Terminal, Westport, Pulau
Indah
Klang LBT
Taman Koperasi Polis
Bangi, Sepang
Low Cost Apartment
Hulu Klang, Ampang
Irana Condominium
CSR Raw Sugar
KLCC Luxury Condo
IT World Subang Parade
Cadangan Membina Semula
Sebuah Rumah Banglo 3 Tingkat
Dengan 1 Tingkat Bawah Tanah di atas
Lot 46351 (No. 8), Jalan Lengkok
Setiabudi, Bukit
55
-
50)
51)
52)
53)
Cygal Bhd
54)
55)
56)
57)
58)
59)
60)
Damansara, KL
Proposed Upgrading for New Large
Airport (A380)) Operation
Cadangan Membaikpulih Cerun di
Perumahan Kg Baru Pinggiran
Terla, Kg Raja Mukim Terla,
Cameron Highlands, Pahang Darul
Makmur
Wijaya Baru Medical Services
Taman Midah Cheras
Membaiki Cerun Runtuh di Jalan Sg
Pavilion Complex Site
The Establishment Mixed Development
Supply And Install Contiguous Bored
Pile For Alila Bangsar
Tekali, Hulu Langat
Cadangan Pembinaan Jalan
Sambungan dari Jalan Prima Mega
ke Jalan Mergas Tua
Cadangan Membina Banglo 4 Tkt di
Taman Bukit Segar, Cheras
Lot 113, Bungalow at Mines Resort
City, Serdang
Proposed Bungalow at Plot 21 & 22
at Country Heights Golden Horse
Resort, Selangor
Cadangan Bangunan Dewan
Orangramai Buddhist di atas Lot
145, Lorong Laksamana, Seksyen
90, Kuala Lumpur
Desa Park City Bungalow
Lot 35609, 35610, 35611, Jalan
Lorong Bukit Pantai 8, KL
Commercial Complex Danau Kota
UE3
Malaysia Steel Wool
Bridge Over Batang Kali (BBR
Rasa)
Sri Impian Condominium,
Brickfields
Meritz Service Apt, Jalan Mayang
Menara Waqaf
Bistari Condominium
Garden International School
Vista Serdang
Bukit Cheras
Damansara Perdana, Sections 2 & 3
Tesco Penang
Lot 93 & 94, Mines Resort City
K.L.S.C.C.C.I
Leo Fasterners Project at Kapar
Menara Telekom
Visionwell
Jalan Tuanku Abdul Rahman
Monte Bayu, Cheras
Aman City Hotel Sdn Bhd
Proposed Protection Works to SubStructure of Sg Semenyih Bridge at
KM 292.45 Both Bound Section C5
Sg Besi Seremban Expressway
Cadangan Mendirikan Satu Blok
Kuater F dan Dewan Serbaguba di
SSBJ
56
61)
62)
63)
64)
65)
66)
67)
68)
69)
70)
71)
72)
73)
74)
75)
76)
77)
57
78)
79)
80)
81)
82)
83)
84)
85)
86)
87)
88)
89)
90)
91)
92)
Haw Ah Bee
Hazama Corporation
Hecta Properties Sdn Bhd
93)
94)
Calvary Church
Bukit Jalil
Sg Kerayong Old Klang Road
Taman Desa CH 1800
AIA Redevelopment
34 Mutiara Bangsar
35 Dewan Bahasa
16-Storey Hotel, Jalan Pudu
UDA III
Antah Holding
AIA Redevelopment
Plaza Merdeka
AIA Redevelopment
40 Omega
41 Car Park 5, Genting Highlands
42 Cable Car Mid Station, Chin
Swee
Temple, Genting Highlands
Bukit Cincin, Genting Highlands
Jalan Jelutung
Cameron Highlands
Jalan Tuanku Abdul Rahman
Jalan Dengkil
Gunung Kledang
Rimba Komanwel
Kompleks Hospital
Port Dickson
Mr Soons Bungalow
Ringlet, Cameron Highlands
KM 290, Seremban Highway
KM 27.5, Jalan Duta
MRSM, Bentong (Phase II) (C & D)
Jalan Duta at KM 27.5
Laman Oakleft, Bukit Antarabangsa
MRSM - Bentong (Phase II) (C)
Bangsar Condominium
Cadangan Pembangunan Semula
Diatas Lot 122 & 1444, Section 14,
Petaling Jaya
Cadangan Pembangunan Puncak
Alam Fasa 3A1
CPI Avantas
Prima Tiara
(AC1) Sri Sentosa
Summer Suites (Lot 121)
Telekom Exchange Building Jalan
San Peng
Summer Suites
Wisma Marine, Shah Alam
Bungalow at Lot 113, Jalan Timah
3, Mines Resort City
Prima 16 Phase 2
Smart School P1B, Sri Bintang
Selatan
8
3-Storey Shop Office, Seri
Kembangan
58
95)
9
-
96)
97)
98)
99)
100)
101)
102)
103)
104)
105)
106)
107)
108)
10
11
12
Bangsar Condominium
BC 196 23-Storey Apartment Jln
Kia Peng
The Pines Condominium, Brickfields
Capital Square Phase I
Casa Palma
Central Market
Cheras Stadium
Damansara Height Pump Station
Faber Heights Taman Desa
Fortuna Court
Harris Kilang Ujian Baru 2 Tingkat
Jasmine Tower
JPS Complex Baru Jalan Tun Ismail
K.L.C.C.
Life Centre
LRT
OG Heights Condominium
P.K.N.S. Uli Kelang
P.P. Telekom Pusat Bandar
Damansara
Premier Milk Extension
Proposed 6-Storey Flatted Factory
Pusat Islam
R.H.B.II.
Robson Heirht
Rothmans Job Site
Sony Factory Extension
Subang Indah
Taman Tun Dr. Ismail
Venice Hill Condominium
Wisma Charyong
Wisma Tranco
7-Storey Commercial Building
Old Klang Road
Putrajaya
Jalili Damai Apartment
I.M.C. Tower
LLN Transmission
Jalan Tun Razak
KLCC
National Theatre
Plaza Pantai
Bukit Tunku Jalan Duta
Taman Seri Cheras
Taman Sri Cheras
Irat Hotel, Jalan Conlay
Aston Villa, Jalan Klang Lama
Castlefield Reservoir, Jalan Nikmat
Petaling
Membaiki Cerun Runtuh SMK Tasek
Permai, Hulu Langat, Selangor D.E.
Danau Villa Link Home
CN Gallery
Taman Pinji-Phase I
Mindef
8-Storey Apartment Jalan Jelatek
Kampung Warisan
Podium (Duta Plaza)
Seni Heria
13 5 9
14
109)
110)
111)
112)
113)
114)
115)
116)
117)
118)
119)
120)
121)
122)
123)
124)
125)
15
-
126)
127)
128)
129)
130)
131)
132)
133)
134)
8
9
-
PJCC Desaria
Zone J7 Seri Petaling
LRT System 1 Phase 1
Kep Semi D
Kepong Entrepreneurs Park
Phase 1B Low Medium Cost Apt
Phase 2 Building
Hotel Pelancungan Koperasi Polis
Cosmectics Factory Shah Alam
J.V.C. Phases I, II and III
Menara Safuan
Nitto Denko Electric Wire
Wisma On-Tai
UUM Administrative Blk Zone 4
Package 4
Desa Petaling Phase 1B
Jalan Shaw Apartment
MABA
Desa Petaling Phase 1B
Richmore Tower
Bandar Sri Damansara Condo
I & P Setiawangsa (Surau)
Cadangan Pembinaan 1 Blok 64
Units Pangsapuri Kos Sederhana
10 Tingkat
Low Cost Flat Taman Dato Ahmad
Razali
Double-Storey Terrace House
Sekolah Rendah/Menengah Jalan
Cochrane
Package B - 2 Blk (A & B) Shop
Apartment, Pelangi Homes
Pelangi Homes - Bungalow Sample
House (Lot 43 & 44)
Bungalow House
Pantai Dalam
194 Single Storey Bungalows
Bangi Heights 96-unit DoubleStorey
Budget Hotel
Pacific Treasure Hotel
Universal Hotel, Menara Li Foong
Sri Impian Condo
Wisma KT
Tesco Mutiara Damansara
Taman Bukit Cahaya
Contesa Condominium Bangsar
Crown Regency
MABA
Taman Desa Theme Park
UPM Serdang
Nestle Shah Alam, Air Dried
Noodles
Taman Mas Sepang
Sri Damansara
Vista Serdang
Taman Mas Sepang
5 10
135)
10
11
12
13
14
16
17
-
136)
137)
138)
139)
140)
141)
5 11
142)
143)
144)
145)
L & M JDC JV
L & M Piling Sdn Bhd
146)
147)
9
10
5 12
148)
149)
150)
151)
152)
153)
154)
155)
156)
157)
158)
159)
160)
161)
162)
Muhibbah Engineering
Multiguna Construction
Development Sdn Bhd
Multiplex Engineering Sdn Bhd
163)
ASM
Taman Putra Sulaiman
17
-
164)
165)
166)
167)
168)
169)
Muhibbah Engineering
Multiguna Construction
Development Sdn Bhd
Multiplex Engineering Sdn Bhd
170)
171)
172)
173)
18
-
174)
8
-
5 13
175)
176)
177)
178)
179)
180)
181)
182)
183)
184)
185)
186)
187)
188)
189)
190)
191)
192)
9
10
11
-
193)
194)
195)
196)
197)
198)
199)
200)
201)
5 14
202)
203)
204)
12
-
205)
13
14
15
16
17
-
Mont Kiara
Nadia Condominium
Plaza Damas II
20 Blok Pangsapuri 20 Tingkat
Parcel B, Bukit Jalil
Casa Ria Taman Maluri
Castle Property Sdn Bhd
C.L. Goh Realty Sdn Bhd
Corinthian Condominium
Bunglaow at Kenny Hill
Damansara Endah Pump Station
Embassy Business Park, Ampang
Extension to Hyatt Saujana Hotel
Fleet Superior
Fletcher
Fu Yuen
Galaxy Tower KL
Jalan 215
Jit Yee
Khuan Choo Realty
Klang Villa
Hendrick Hotel Kuala Lumpur
Lian Seng Condominium
Mark Hengs House Lot 28120
Merais at Jalan Harapan
Orchard Park
Pandorama
Pantai Panorama Phase II
Plaza OUG Carpark Annex
Pernama Bukit Raja
Pernama Stage 2
Proposed Shopping Complex For
Maksak
Proton Track
Rusju Sdn Bhd
Seremban City Centre
Shencourt
Sri Keladi OUG
Sg. Kuyuh Bridge
Sri Penaga Condominium Bangsar
The Sanctuary Bukit Tunku Condo
Tien Wah Press
Tower Block at Damai Complex
Vista Kiara
Damansara City Phase 1
Capital Square Tower II
IOI Square
Cyberjaya
Protech Corporation (UPM)
Capital Square
MK6
Pajak Gadai Hong Leong Jalan
18 Pudu
Proposed 3 Blocks Apartments
Mont Kiara
Tesco Supermarket
Kiaramas Cendana
Jalan Dungun
Bukit Kiara Properties
5 15
-
206)
207)
208)
209)
210)
211)
212)
213)
214)
215)
216)
217)
Protech Company
5 16
218)
219)
220)
221)
222)
223)
224)
225)
226)
227)
228)
229)
230)
231)
232)
233)
234)
235)
236)
237)
238)
Metroplex Mall
KL Pavilion
25-Storey Condominium
Pusat Latihan Petronas
Taman Lagenda Mas
Government Quarters, Jalan Duta
Timur Marine, Shah Alam
KL Sentral
5.14 Acres Perdana Emerald
Damansara Perdana
D19 Shop Lot
Menara Tun Razak
Putera Jaya
FGA Lasmaha
7-Storey Industry Factory Tmn
Maluri
KLLC River Site
19 Newgates Condominium
20 Cadangan
Pembinaan
Jambatan
Jalan Kasipillay
PHN Shah Alam
Istana Alam Shah Klang
Cheras Perdana
Ukayland
Kem Wardieburn, Setapak
Sungai Gombak
Desa Jati, BBN, Nilai
Jejantas Bt 3
Bridge over Sg Gombak, Jalan Tun
Razak
PRGM II
Tesco Damansara Mutiara
Menara Keck Seng
AIA (HQ) Redevelopment, Phase 1
SEMA MWO Factory Extension
Hotel Merlin (Tg. Tuan)
Low Cost Flats
300 units RPR 3 PIR SM925 Ukay
Perdana
Package A - 3 Blk (C, D & E) Shop
Apartment, Pelangi Homes
96 Units RT-4 Single Storey Terrace
Houses
16 Units Semi-D, Double-Storey
Mudi Angkasa, 360 Units
Cluster Bungalow
Pusat Latihan Petronas
Telekom Exchange Bldg Kuala
Kubu Baru
Kobe Factory
8
Proton Canteen
Low Cost 150 Units, Fasa 25,
Bandar Kinrara Puchong
Cad. Pembangunan Rancangan
Perumahan di Kampung Kosakan
Mukim Serendah, Daerah Ulu
Selangor
Pusat Latihan Petronas
Bistari Condominium, Jalan Putra
Phase II
5 17
239)
240)
241)
242)
243)
244)
245)
246)
247)
248)
249)
Shimizu Corporation
250)
Shimizu - Peremban
251)
252)
253)
9
10
11
12
13
15
5 18
16
-
254)
255)
256)
257)
258)
17
18
-
259)
260)
PJ
261)
262)
263)
SP Setia Berhad
8
9
10
5 19
11
12
13
264)
265)
266)
14
16
17
8
9
10
-
267)
268)
269)
270)
271)
272)
273)
274)
275)
276)
277)
Malanaga
278)
Syarikat Kontraktor Kota Sdn Bhd
279)
280)
281)
5 20
282)
283)
284)
285)
286)
287)
288)
Rawang
289)
290)
291)
292)
293)
294)
296)
297)
298)
Teknik Cekap-Zublin JV
295)
5 21
299)
300)
301)
302)
303)
304)
305)
306)
307)
308)
309)
310)
311)
6-1
LOAD TEST
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
5)
AIU Limited
Al-Ambia Sdn Bhd
Ansah Sdn Bhd
Baktian Sdn Bhd
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
24)
6-2
25)
26)
27)
28)
29)
30)
31)
32)
33)
34)
35)
36)
37)
38)
39)
40)
41)
63
42)
43)
44)
45)
46)
47)
S P Setia Bhd
48)
49)
50)
51)
52)
53)
54)
55)
6-4
INSITU CALIFORNIA BEARING RATIO
NO.
OUR CLIENT
PROJECT
1)
2)
3)
Beverly Heights
4)
5)
6)
7)
8)
9)
38032
65
10)
11)
12)
Daewoo Corporation
DY Bumi Corporation Sdn Bhd
Dynamic Pile Testing Sdn Bhd
13)
14)
15)
16)
Ho Hup/Siab JV
Ireka Construction Sdn Bhd
Jumantan Sdn Bhd
Key Profile Sdn Bhd
17)
18)
Jaya
Simpang
19)
20)
21)
22)
23)
24)
25)
26)
27)
28)
29)
30)
Sin Ki Piling & Engineering (M) S/B Sobroun Yeoh Tiong Lay Sdn Bhd -
6-6
31)
32)
33)
34)
35)
36)
7-1
CRACK MONITORING
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
AIU Limited
A. Sani & Associates Sdn Bhd
BBN Development Sdn Bhd
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
GR Associates
Gugusan Sdn Bhd
Ho Hup Construction Co Bhd
H.S.Liao & Rakan
Hume Industries (Malaysia) Bhd
16)
17)
18)
19)
20)
21)
22)
23)
24)
25)
26)
27)
28)
7-2
29)
30)
31)
32)
33)
34)
35)
36)
37)
38)
Shimizu Corporation
Shinei Geotechnique (M) Sdn Bhd
Setsco Services (M) Sdn Bhd
Sistem Televisyen (M) Bhd
Structural Repairs (M) Sdn Bhd
39)
40)
41)
42)
Syarikat Yoon On
Techart Sdn Bhd
Tekton Beacon Sdn Bhd
Vertitech (M) Sdn Bhd
43)
44)
7-3
SETTLEMENT MONITORING
NO.
1)
2)
3)
4)
5)
13
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
OUR CLIENT
A. Sani & Associates Sdn Bhd
PROJECT
-
7-4
18)
19)
20)
21)
22)
23)
CNK Kontraktor
CSR Building Materials Sdn Bhd
CTF Build Sdn Bhd
Cygal Bhd
24)
25)
26)
27)
28)
29)
30)
31)
No4
32)
33)
Double
Houses (Phase 3 &
Compact
Part of Lot 35449
34)
GR Associates
35)
Hwee Lai Co (M) Sdn Bhd
36)
Ho Hup Construction Co. Bhd
7-5
37)
38)
39)
40)
41)
42)
43)
JT GeoDesign
Kejuruteraan Spektra Sdn Bhd
44)
45)
46)
7-6
-
Abdullah Tahir,
Tingkat Di
591, 592, 685,
Seksyen 67, Jln Imbi
Tingkat (412
& 2733, KL
47)
Khairi Consult Sdn Bhd
48)
49)
50)
51)
52)
53)
54)
55)
7-7
56)
57)
58)
59)
60)
61)
62)
63)
64)
65)
66)
67)
68)
69)
70)
71)
72)
73)
Permohonan Kebenaran
Merancang bagi Cadangan Pindaan
Pelan Susunatur untuk
Pembangunan Perumahan di atas
Sebahagian Lot 4842, Bandar
Selayang, Daerah Gombak,
Selangor Darul Ehsan
Menara RKT Management Corp.
Menara RKT
Mersing Services Sdn Bhd
Proposed Construction&Completion
of 3 Blocks 539 Units Serviced
Apartment on Lot 91, off Persiaran
Golf, Saujana Resort, Seksyen U2,
Shah Alam (Esquire Corner)
MRCB Engineering Sdn Bhd
Lebuhraya Duta-Ulu Kelang (DUKE)
Package 1
Ms Fairly Yap
Double Storey Detached Building,
19 Lorong Limau Manis 3,
Bangsar Park, Kuala Lumpur
Nehemiah Reinforced Soil Sdn Bhd Cadangan Membina 2 Blok 18
Tingkat Pangsapuri di Desa
Petaling untuk Tetuan Arosa
Builders Sdn Bhd
Nikmat Jasa Piling (M) Sdn Bhd
Proposed Contiguous Bored Pile
(CBP) Retaining Wall for Petronas
Petrol Station at Jalan Jelatik,
Ampang, Kuala Lumpur (at
adjacent bungalows)
Nishimatsu-Corpro Construction (M) 39-Storey Building at Lot 181, Jalan
Sdn Bhd
Binjai
Nissin Builders Sdn Bhd
Proposed 83 Landed Units, Guard
House, TNB Sub-Station & Retail 2
for Mixed Development at Lot 501,
502 & 503, Taman Melawati, Mukim
Hulu Kelang, Daerah Gombak,
Selangor Darul Ehsan
Nuhito Sdn Bhd
Sekolah Rendah Kebangsaan Tamil
at USJ20, Subang Jaya
O.G. Perunding Sdn Bhd
Terrace Houses Taman Datuk Senu
Queensbay Mall JMB
Monitoring of Queensbay Mall
Settlement
Pacific Geoscience (M) Sdn Bhd
Batu Caves
Pembinaan Emaskami Sdn Bhd
Build, Install, Testing and
Commissioning of Power Station
and Quarters at Pulau Ketam,
Klang, Selangor
Pembinaan Limpah Bersatu SB
Sungai Pekan Levee
Perak-Hanjoong Simen Sdn Bhd
Clinker Dome
Perunding Majucipta Sdn Bhd
Southern Hospital, Malacca
16 Plastic Factory (Blk H) at
Likom
17 Technology Park, Cheng Melaka
18 15-17 Pinggiran Tunku, Bukit
19 Tunku
Pintaras Geotechnics Sdn Bhd
BKP Project, Parcel C, MontKiara
Promatik Emas, Persiaran
Hampshire
7-8
74)
75)
76)
77)
78)
20
79)
80)
81)
82)
83)
84)
85)
86)
87)
88)
89)
90)
7-9
91)
92)
93)
94)
95)
96)
97)
Kuantan-Kerteh
Brickfields
Homes at 1 Jalan Putra Bahagia
8/2F and 9 Jalan 8/2B, Putra
Heights, USJ
Double-Storey Medium Cost House
at Seksyen 24, Shah Alam
Bandar Puteri untuk Tetuan Flora
Development Sdn Bhd
Apartment Block at Seksyen 7,
Shah Alam, Selangor
Roche Warehouse, Jalan 13/1, PJ
OCBC Bank, Jalan Tun Perak, KL
Warehouse of Espress Chemical
Supplies Sdn Bhd at Kota
Kemuning, Shah Alam
Lot PT109&110, Jln Pudu Lama
50 Jalan Ampang, KL
24 Persiaran Bukit Tunku, KL
Pedestrian Bridge Link at Chan Sow
Lin
8-1
FIELD DENSITY
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
Daewoo Corporation
15)
21 -
16)
17)
18)
8-2
19)
20)
21)
22)
23)
24)
25)
26)
27)
28)
22
29)
30)
31)
32)
33)
34)
35)
36)
37)
Kota Damansara
Chua Tower, Jln Binjai, KL
Cadangan Rumah Kakitangan
Penjara Seremban, Negeri
Sembilan
Geo-Sains Sdn Bhd
Access Road on PL 03
Mixed Development Ulu Kelang
Hover Top Sdn Bhd
Jalan Tun Razak-Jalan Semarak
Viaduct
Ho Hup Construction Co Bhd
Jabatan Perkhidmatan Awam
KLCC Mandarin Oriental Hotel
23 Putrajaya
24 Cadangan Membina Jalan
Raya
25 Durian Tunggal-Paya Rumput-Sg.
26 Udang, Melaka
HRA Teguh Sdn Bhd
Sewage Treatment Plant Project,
Phase 1, Package 1, Southern
Klang Valley CSTF
IJM Construction Sdn Bhd
Bandar Tun Razak Earthworks
Parcel E Office Block Sub-Package
27 1, Precinct 1, Putrajaya
Alam Warisan, Packages 1 & 2
Ikhmas Jaya Sdn Bhd
Cadangan Projek Pembinaan
Jambatan di atas Sungai Pahang,
Chenor, Daerah Maran, Pahang
Imbas Mesra Sdn Bhd
Cadangan Projek Perumahan (Fasa
III) di atas sebahagian Lot 5068 dan
Tanah Kerajaan berhampiran Kg.
Permata Kuang, Mukim Rawang,
Daerah Gombak, Selangor
J.K. Lim Trading & Engineering S/B Road Works & Associated Works
for Phase 3 (Package 1) in Temasya
Industrial Park
JOSU Engineering Construction S/B Mont Hill, Bandar Baru Salak Tinggi
Kadar Kemas Sdn Bhd
Condominium Bukit Robson
Kembang Serantau Sdn Bhd
Cadangan Menaikkan Taraf Jalan
Puchong Bt 7 - Bt 9 Daerah
Petaling, Selangor Darul Ehsan
Key Profile Sdn Bhd
Pembangunan Saujana O-Lot
Mukim Damansara, Daerah
Petaling, Keluasan : 25Ekar
8-3
38)
39)
Jaya
Simpang
40)
41)
42)
43)
8-4
44)
45)
46)
29
30
47)
48)
49)
50)
51)
52)
53)
54)
55)
56)
57)
58)
Nicomaju Trading
59)
Mewah
SKF Factory
Permanent Depot at Sg. Renggam,
Shah Alam
Construction, Completion and
Maintenance of Jalan Syed Putra
Ingress Salk South Egress, KL
Cadangan Melebarkan Jalan dan
JambatanSempit di seluruh Wilayah
Persekutuan Kuala Lumpur - B3
Jambatan di Jalan Tun Razak
menyeberangi Sg. Gombak
Cadangan Melebarkan Jambatan di
Jalan Sultan Sulaiman merentangi
Jalan Tun Sambanthan
M176-Manjung Power Station-Civils
M174-Cooling Water Intake,
Manjung
Putrajaya
Taman Melati Ulu Kelang
Lateral Gas Petronas Melaka
Putrajaya
JKR Workshop at Bota Perak
Palm Oil Mill at Bota Perak
Sri Keladi
Cadangan Menaikkan Taraf Jalan
Puchong Bt 7 - Bt 9 Daerah
Petaling, Selangor Darul Ehsan
P.I.S. Rentis 082
RT2-123 YUNIT Rumah Teres 2
Tingkat, Puchong
Lebuhraya Duta-Ulu Kelang (DUKE)
Package 1
Mixed Development Project at
Bandar Pinggiran Subang for M/S
Unique Creation
Cadangan Pembangunan
Perumahan di atas Lot 4979 &
4982, Kg. Sg. Pusu, Mukim
Setapak, Daerah Gombak, Selangor
untuk Tetuan Capital Lane Sdn Bhd
Cadangan Kerja-kerja Dredging
Tasik Putrajaya, Fasa 1A untuk
Perbadanan Putrajaya
Cadangan Projek Markas Tentera
Darat Pengkalan Hulu, Kedah
Cadangan Merekabentuk, Membina
dan Menyiapkan Sekolah
Menengah Sains Rembau, Daerah
Rembau, Negeri Sembilan
8-5
60)
61)
62)
63)
64)
65)
66)
67)
68)
69)
70)
71)
72)
73)
74)
8-6
75)
76)
77)
78)
79)
80)
81)
82)
83)
84)
85)
86)
87)
Sunshine Construction
88)
89)
90)
91)
92)
93)
94)
95)
96)
8-7
97)
98)
99)
9-1
DILAPIDATION SURVEY
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
5)
6)
7)
8)
Evenfit Consult
10)
11)
12)
GR Associates
Haw Ah Bee Construction Sdn Bhd -
9)
9-2
13)
14)
15)
16)
Impian,
Alam, Selangor
17)
Jabatan Kerja Raya Klang
18)
19)
20)
21)
22)
23)
24)
25)
26)
9-3
27)
28)
29)
30)
31)
Mr The/Ms Sue
32)
33)
34)
35)
36)
9-4
37)
38)
39)
40)
41)
42)
43)
44)
45)
46)
10 - 1
ULTRASONIC PULSE VELOCITY
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
5)
6)
7)
8)
9)
Buildcon Bhd
Cygal Concrete Sdn Bhd
Dubon Bhd
Dynamic Pile Testing Sdn Bhd
10)
11)
12)
13)
14)
15)
16)
17)
31 2
Invescor-Dumez Jaya-Woh Hup JV Juruhiasan Jaya Sdn Bhd
Jurubina Cekap Sdn Bhd
-
18)
19)
20)
21)
22)
23)
24)
25)
26)
27)
28)
29)
30)
10 - 2
31)
32)
33)
34)
PTKSH Consortium
P.K. Leong Sdn Bhd
Ready Mixed Concrete Malaysia S/B 32 Samsung Engineering &
Construction (M) Sdn Bhd
-
35)
36)
37)
38)
39)
Shimizu Corporation
Silveron Builders Sdn Bhd
40)
41)
Soils & Materials Laboratory (M) S/B Sunway PMI-Pile Construction S/B -
42)
43)
44)
45)
46)
47)
Taisei Corporation
Tahir Wong Sdn Bhd
Teambess Engineering Sdn Bhd
Telekom Malaysia Bhd
Tekton Beacon Sdn Bhd
48)
49)
11 - 1
INSTRUMENTED TEST PILE WITH STRAIN GAUGES
NO.
1)
2)
OUR CLIENT
APG Geo-Systems Sdn Bhd
Bored Piling (M) Sdn Bhd
PROJECT
-
3)
4)
5)
6)
7)
33 ll,
34
35 -
8)
9)
11 - 2
-
10)
11)
12)
36
13)
14)
15)
16)
17)
18)
19)
20)
21)
38
40
41
42
43
44
45
46
47
48
49
50
22)
11 - 3
23)
24)
25)
26)
27)
28)
29)
30)
elevated
31)
32)
Shimizu Corporation
33)
34)
slab
- strain gauging of steel formwork
for concrete pump-up method
Elevated Highway over rivers in
Kuala Lumpur (4 borepiles)
Malaysia Singapore Second Link
(2 borepiles)
Cadangan Pembangunan
Pangsapuri Mewah 20 Tingkat (288
Unit) dengan 2 Paras Basemen
Tempat Letak Kereta & 1 Blok
Kemudahan (Annexe) 3 Tingkat Lot
123, 130 & 131, Jln Tun Razak, KL
Proposed Development at Lot PT
67144 Lot 10 Jalan Sungai Pinang,
Taman Perindustrian Pulau Indah,
Phase 2A, Selangor Darul Ehsan
Jalan Duta
Proposed Private Hospital at Jalan
Tun Razak, Kuala Lumpur
Block 3, G/L : F/4-5 (300mm dia,
micropile) for Platinum Damansara
12 - 1
PLATE BEARING
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
5)
Buildcon Bhd
Bidari Properties Sdn Bhd
BTD-Suncon JV
Civil And Structural Engineering
Services Sdn Bhd
6)
7)
8)
Hazama Corporation
Ho Hup Constructions Co Bhd
9)
10)
11)
12)
13)
14)
15)
16)
12 - 2
17)
18)
19)
20)
21)
12 - 3
TEMPERATURE MONITORING
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
5)
6)
7)
8)
9)
on
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
Hazama Corporation
20)
Cygal Berhad
Daewoo Corporation
12 - 4
21)
22)
23)
24)
25)
26)
27)
28)
29)
30)
31)
32)
33)
34)
35)
36)
37)
38)
39)
40)
41)
42)
Pembenaan Chan & Chua Sdn Bhd Percon Piling Sdn Bhd
-
43)
44)
45)
46)
Bina)
47)
Perwira Bintang Holdings Sdn Bhd 48)
12 - 5
49)
50)
51)
PTKSH Consortium
52)
53)
54)
55)
56)
57)
58)
59)
60)
61)
Seribong-Konbina-Hazama
Consortium
Shimizu Corporation
Shinei Geotechnique (M) Sdn Bhd
62)
63)
64)
Takenaka Corporation
65)
66)
67)
Damansara City
MK7 - Sunrise
Kiaramas Cendana
Kiaramas Ayuria
Wisma TSH
Setapak Heights (Villa Wangamas
Condo)
Kiaramas Phase 4, Lot 2592, Mont
Kiara, KL
Pearl KLCC, Jalan Stonor, KL
Lot 9342 di Desa Melawati, Fasa 4
Mukim Setapak, Daerah Petaling
Veo Melawati
Quantum Quest
Wafer Technology (M) Sdn Bhd at
Kulim Hi-Tech Industrial Park
KLIA PTC 1 (31 nos foundation
slabs & 3 nos retaining walls)
KL Pavilion
Cadangan Membina & Menyiapkan
Bangunan Baru Blok 8 serta kerjakerja berkaitan di Kompleks Kota
Darulnaim, Kota Baru, Kelantan
STP2, Precinct 5, Putrajaya, Phase
1B - Package WW9
Putrajaya Bridge BR8
- South Abutment - Zones A & B
- North Abutment - Zone B
3G2, Putrajaya, Section. 2,
Office Block Slab
Bandar Tun Razak STP - Concrete
Trial Block
Bunus STP - Concrete Trial Block
KL Pavilion (Mock-up)
Phase 1, Universiti Malaysia
Sarawak (2 nos of Mass Footing)
Kinta Dam
Pantai STP
Proposed 31-Storey Aprt, Jalan
Mayang
Sultan Ismail Station, LRT System 2
City Square, Johor Bahru (4 nos raft
foundations)
KL Sentral Hotel
- Mass Concrete Mock-up
- Transfer Beam at Level 8
KLIA PTC 2 (36 nos foundation
slabs)
Bank Kerjasama Rakyat Malaysia
Berjaya Central Park : Package 1Basement, Podium and Corporate
Suites and Reinforced Concrete
Structural Works for Ritz-Carlton
Residence Tower on Lot 43, 44,
133 and 135 Section 58 KL
12 - 6
68)
13 - 1
CONCRETE CORING
NO.
OUR CLIENT
PROJECT
1)
2)
AA Jurutera Perunding
Advanced Supply Chain Solutions S/B -
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
Arterior Konsult
16)
17)
18)
19)
20)
21)
22)
23)
13 2
24)
25)
26)
27)
28)
29)
30)
31)
32)
33)
34)
35)
36)
37)
38)
39)
40)
41)
Buildcon Bhd
42)
Desa Jati
Lot 6644, Jalan Bukit Desa, 8
Taman Bukit Desa, Haven
Kuala Lumpur
Dataran Prima Condominium
Taman Lagenda Mas, Phase 2
KL Eco City, Parcel A RT 1
Nandayu 28, Bandar Sunway
PKG 8A Simpang Pulai-Gopeng
Menara Bukit Ceylon
Subang Perdana Phase 4
Fasa 2-Zone B, Puncak Alam
Desa Putra, Wangsa Maju
Kota Kemuning Town Centre 3, Lot
138 (No. 24C, Jalan Anggerik
Vanilla Y31/Y)
Upper East Ampang
Cadangan Menaiktaraf Jalan
Sambungan Sekinchan Hulu
Bernam, Daerah Sabak Bernam,
Selangor Darul Ehsan
38 units Light Industrial
Development
Tiara Ville, Bandar Subang Jaya
Subang Soho
BBMB Basement
Lot 6644, Jalan Bukit Desa, 8
Taman Bukit Desa, Haven
Kuala Lumpur
Proposed Restaurant Development
(Miami Spice) Block B at Jalan Imbi
Menara Bukit Ceylon
Villa Angsana Condominium
Jasa Export Transit Warehouse Sdn
Bhd, Port Klang
Bridge BR2, Putrajaya
LRT (Package 101A), Putrajaya
Phase 1 (A & B) TTDI KL
Brunsfield Business Park, Shah
Alam
Bungalow House No. 2, Lorong
Duta Satu, Taman Duta
Proposed Brunsfield Country
Homes at Bukit Kapar, Kapar,
Daerah Ulu Selangor
Taman Datuk Ahmad Razali
Buildcon Casting Yard
BAM Condominium Taman Maluri
One Ampang Avenue
Sri Damansara Main Darin KL/MDI
Berjaya Star City
West Port
Proposed Housing at Serdang
13 - 3
43)
44)
45)
46)
47)
48)
52)
53)
54)
55)
56)
57)
58)
1
318,
Jaya
59)
60)
49)
50)
51)
61)
62)
63)
64)
13 - 4
65)
66)
67)
68)
Evenfit Consult
69)
70)
71)
72)
73)
74)
75)
76)
77)
13 - 5
78)
79)
80)
81)
82)
83)
84)
85)
86)
87)
88)
89)
90)
Hazama Corporation
91)
92)
56 -
13 - 6
93)
94)
95)
96)
97)
98)
99)
100)
101)
102)
103)
104)
105)
106)
107)
108)
109)
110)
111)
112)
113)
114)
115)
13 - 7
-
116)
117)
118)
119)
120)
121)
122)
123)
124)
125)
126)
127)
128)
129)
130)
131)
132)
133)
134)
135)
Istana Klang
Bangunan SSAAS, Shah Alam
Kuil Sri Perumal, Pusat Bandar
Puchong
Cadangan Kerja-kerja Siasatan bagi
mengenal pasti tahap ketahanan
struktur Tingkat 4, Blok B,
Bangunan KWSP, Jalan Gasing,
Petaling Jaya, Selangor
Nestle BT - Air Dried Noodle
Factory
Construction & Completion Phase II
for 32 Unit Double-Storey Houses in
Arena Kepayang Putra, Ipoh
Silk project, Kajang
Perkuat Kuari, Lot PT 18060
PT18064, Taman Bt Permai,
Cheras
Kajang Traffic Dispersal Ring Road
(Package 2, Sections 2B & C)
Cadangan Pembinaan Jalan
Sambungan dari Taman Alam
Damai ke Lebuhraya Perhubungan
Timur-Barat di Cheras
KM 290, Seremban Highway
Sering Ukay
Taman Segar, Cheras
Universiti Utara Malaysia
Puncak Alam, Phases 3A & 3B
Taman Segar Interchange, Cheras
PM10 Interchange, Putrajaya
Vista Serdang
Fire Damage to Part of FDY 2 Plant
in Factory Complex on Lot PT 2274,
1628, 2113 & 2114, Kawasan
Perindustrian Nilai belonging to
Recron Malaysia Sdn Bhd
A Plastic Factory at Cheng
Industrial Park, Malacca
Sri Kuala Lumpur School, Subang
Jaya
396 Apartment at Segambut (Prima
Tiara)
Taman Sri Bahagia Cheras
Magnum
MGSW Port Klang
Menara Telekom
Taman Mas Sepang, Phase 3
A.S.M. Klang
Port Klang (Shell)
Factory at Port Klang
Helmi, Taman Tun Dr Ismail
NKVE Plus/2C
13 - 8
136)
137)
138)
139)
140)
144)
145)
Obayashi Corporation
146)
147)
148)
149)
150)
151)
152)
153)
154)
155)
141)
142)
143)
160)
161)
162)
163)
156)
157)
158)
159)
13 - 9
-
164)
165)
166)
167)
168)
13 - 10
-
169)
170)
171)
172)
173)
174)
175)
176)
177)
178)
179)
180)
181)
182)
183)
184)
185)
186)
187)
188)
San Soon Seng Food Industries S/B See Yong & Son Construction S/B Sekimas Holdings Sdn Bhd
-
189)
190)
191)
192)
193)
S. G. Concrete Products
Shimizu Corporation
Capital Square
HQ Glenmarie
MK5
UMNO Complex
Danau Idaman
TUDM Complex
Broga Casting Yard - Kajang
KL International Airport PTC 1
KL Pavilion
4 Blok Pangsapuri Kos Sederhana
18 Tingkat di atas Lot 12206, Jalan
PJS 8/9, Petaling Jaya, Selangor
untuk Tetuan PKNS
Desa Bangsar Rio
Proton City Plant, Tanjung Malim
Shah Alam High Court
Vision Heights Seremban
STP 2, Precinct 5, Putrajaya
Taman Lagenda Mas, Cheras
Proposed Housing Development on
Lot 978 & 979, Mukim Cheras,
Daerah Hulu Langat, Selangor
KL Monorail - TPSS Wawasan,
Medan Tuanku
Lembaga Urusan Tabung Haji
Masjid Tanah Melaka
RHB Bank Branches
Taman Lagenda Mas, Phase 2
(Vital Projects Sdn Bhd)
Hampshire Park, Phase 2, Jln
Ampang, Kuala Lumpur
Menara Keck Seng
Wisma AIA Redevelopment
(Phase 1)
Warehouse Monitoring
Tg Emas Jetty, Muar, Johor
Proposed Low Cost Apartment
(Block 1, 2, 3 & 4) comprising 1482
Units on Lots 21571-21574, 2157821579, Tapak D1 and D2, Mukim
Setapak, off Jalan Genting Kelang,
Kuala Lumpur
Proposed Reinforced Concrete
Tower
Siemens Components Sdn Bhd
Martego Chao Centre
Proposed Renovation &
Refurbishment Works to 9 Strorey
Hotel for Messrs Agora Hotel
(Melaka) Sdn Bhd
Setapak Ria Condominium
Teo Hang Sam Realty
The Little Sisters of the Poor,
Cheras
13 - 11
194)
195)
196)
197)
9
198)
199)
200)
201)
10
202)
203)
204)
205)
206)
207)
208)
209)
210)
211)
Menara CMY
Southern Klang Valley CSTF
Proton Research & Development
2 Blok, 18 Tingkat, 632 Unit Rumah
Pangsa, Jalan Ipoh Lama
Lot 110 & 112, Jalan Padang
Kelang
Nova II, Segambut
Proposed 132 units Condominium
Development on Lot 1828, Jalan
Mont Kiara
Cadangan 7 Banglo di Jalan
Cemerlang, Taman Duta, KL
Rhythm Avenue
LRT System 2 (Cut & Cover)
ILKAP, Bangi
Seremban-Simpang Ampat
Pavement Rehabilitation
Proposed Topographical Survey and
Soil Investigation Works for the
Defects on Pilecap at the Bridge
over Sg Linggi KM 259.70BB,
Section S1, North South
Expressway
Shop Lot No. 59 1st Floor Jalan SS
15/4E, Subang Jaya
Cadangan Pembangunan
Bercampur di atas Lot-lot 595-599,
604-607, 611-614, 616, 617,
Sebahagian Lot 624, 682, 683, 684
dan PT 35, Seksyen 67, Jalan
Imbi, Kuala Lumpur untuk Tetuan
Dinamik Sdn Bhd
Travelodge, Jalan Ampang
C/165 Pandan Indah Site
SMV Krian
Impiana
Gasing Height Condo Phase 3
Glomac Business Centre
Jalan Duta
Upgrading & Widening of Jalan Sg.
Besi
Ampang Hospital
Sri Mahkota Condominium
Cadangan Merekabentuk, Membina
dan Menyiapkan Rumah Keluarga
(206 Unit) Pelbagai Kelas dan
Kerja-kerja Berkaitan untuk Pegawai
dan Anggota Tentera Darat di Kem
Syed Sirajuddin, Gemas, Negeri
Sembilan
VIVA (Jalan Ipoh)
Mukim Sg. Buloh
Nagapura Complex
13 - 12
212)
213)
214)
215)
216)
217)
Cheras
Langat, Kajang
218) Syed Mansur & Associates S/B
219)
220)
221)
222)
223)
224)
225)
226)
227)
228)
229)
230)
231)
8
Telekom Malaysia Bhd
Temen Joint Venture Sdn Bhd
13 - 13
232)
233)
234)
235)
236)
237)
238)
239)
240)
241)
242)
243)
244)
Structural Serviceability of
Abandoned Building on Lot 210,
Taman Melaka Raya, Melaka
Precast Piling Puchong Yard
Apartment at Taman Midah, Cheras
11 Blocks of 5-Storey Service
Apartment (Sri Jasmin), Mantin
Putrajaya
Pantai Dickson
Sprint Highway
Team Concrete Product Factory
(Taman Berjaya Baru Kajang)
South View Jalan Ampang
Proposed Keystone Wall at Saujana
Impian Kajang
Construction, Completion &
Maintenance of Hewlett Packard
Global IT Hub on Lot P200 &
P200A, Persiaran Rimba Permai,
Cyberjaya Flagship Zone
Istana Shariff Ali
Sg. Buloh Casting Yard
Lot 4G9, Putrajaya
Desa Serdang
Assessment for First Floor
Slab/Beam to carry a load of
7.5kN/m2 at 13 Jalan Tandang,
Petaling Jaya
500KV Transmission Line 2,
Langkap
14 - 1
BRIDGE TESTING
1.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
Supply and install resistance wire strain gauges on existing JKR Bridges, and
monitor together with linear displacement transducers during load test :
Bridge FT005/500/6 near Tanjong Karang
Bridge FT005/328/5 near Lukut
Bridge FT005/569/0 near Teluk Intan
Bridge FT003/365/5 Sg. Baging near Kuantan
Bridge FT003/373/5 Sg. Cerating near Kuantan
Bridge FT001/511/7 near Batang Padang
Bridge FT005/356/6 Sg. Sepang Kecil
Bridge FT001/268/8
Bridge FT060/28/5 near Pengkalan Bharu
Bridge FT001/425/5 Sg. Serendah near Serendah
Bridge FT005/409/1 near Kuala Langat
Bridge FT005/448/8 near Klang
Bridge FT001/149/2 near Segamat
2.
Supply and install linear displacement transducers for load testing of North and
South Bridges for New Pantai Highway
3.
Install linear displacement transducers and vibrating wire strain gauges, and
carry out load test :
Sg. Semenggok 2 Bridge, Sarawak
Sg. Batang Padeh 2 Bridge, Sarawak
Sg. Kinarut Bridge, Sabah
Sg. Batu 30 Bridge, Sabah
a.
b.
c.
d.
4.
Install linear displacement transducers and vibrating wire strain gauges, and
carry out load test at KTMB Sg Perai Bridge
5.
Supply and install resistance wire strain gauges and monitor together with linear
displacement transducers during load test at Sg Kuah Bridge, Langkawi, Kedah
15 - 1
VIBRATION & NOISE MONITORING
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
5)
6)
7)
Seksyen
8)
357,
9)
12)
13)
15 - 2
14)
15)
16)
17)
18)
19)
20)
21)
22)
GSIB Sdn Bhd
Kilang
15 - 3
23)
24)
25)
26)
27)
28)
29)
30)
PT68,
(Lot Lama
Lot
Kuala
31)
MRCB Engineering Sdn Bhd
32)
33)
34)
35)
36)
15 - 4
37)
Associated Works
Mixed
Kompleks
(Package 3A) on Lot
51, Seksyen 70, Jln
Hishamuddin, KL
38)
Pembinaan Emaskami Sdn Bhd
39)
40)
41)
42)
43)
PETRONAS
Pengurusan LRT Sdn Bhd
Prefabrik Struktur Sdn Bhd
44)
45)
46)
47)
48)
49)
15 - 5
50)
51)
52)
53)
54)
55)
56)
15 6
-
57)
58)
59)
60)
61)
62)
16 - 1
NUCLEAR DENSITY TEST
NO.
OUR CLIENT
PROJECT
1)
2)
Cadangan Menaiktaraf
Persimpangan dan Jalan Raja
Nong, Daerah Klang, Selangor
Darul Ehsan
3)
4)
Mydin USJ
5)
17 - 1
SITE LABORATORY
NO.
OUR CLIENT
1)
2)
Ecometro (M) Sdn Bhd
Earthworks,
PROJECT
-
Proposed Completion of
Surface Water Drainage, Retaining
Wall and other Related Works for
the Proposed Construction, Fitout,
Commissioning and Completion of
the Facilities and Infrastructure of
Royal Malaysia Polis for
Perbandaran Perwira Harta
Malaysia
3)
4)
RMP Subang
5)
6)
Ikhmas Jaya Sdn Bhd
Pembinaan
Cadangan
Projek
17 - 2
8)
9)
10)
Package 2 - Cadangan
Menaiktaraf Jalan Abu Bakar Jalan Skudai, Johor Bahru, Johor
Darul Takzim Secra Rundingan
Terus Design & Build for Iskandar
Investment Berhad
11)
18 - 1
OVERSEAS PROJECT
Vietnam
Setting up Concrete Testing Laboratory and Training of Local Engineers on Testing for
United Nations Development Programme, Ministry of Agriculture and Ruiral
Development, Vietnam
1.
2.
3.
4.
5.
6.
7.
July-August 1996 at :
Dong Ha, Quang Tri Province
Hue, Thua Thien Province
Da Nang, Quang Nam-Da Nang Province
Dong Hoi, Quang Binh Province
Ha Tinh, Ha Tinh Tri Province
Vinh City, Nghe An Province
Thanh Hoa, Thanh Hoa Province
1.
2.
3.
4.
5.
August-September 1998 at :
Ninh Binh, Ninh Binh Province
Nam Dinh, Nam Dinh Province
Thai Binh, Thai Binh Province
Hai Phong, Hai Phong Province
Ha Long, Quang Ninh Province
19 - 1
LIST OF TESTING EQUIPMENT AVAILABLE
1) UNITEST 500kN and 2000kN Compression Testing Machines for cores, bricks,
grout cubes, etc
2) N-34 PROCEQ SCHMIDT Rebound Hammers
3) Concrete Coring Machines
4) Cube Moulds, Slump Cone, Compacting Factor Apparatus, etc
5) Sets of BS Sieves, Riffle Boxes, Weighing Balances, Oven, Speedy Moisture
Tester, etc
6) Other equipment for aggregate testing
7) Standard and Modified Proctor Compaction Moulds and their respective hammers
8) Sand Pouring Apparatus for Field Density
9) Light Dynamic Cone Penetrometer
10)
11)
12)
Precision Levels
13)
TML TDS-301 and TDS-302 Portable Data Loggers with switch boxes
14)
15)
TML 50 tons, 200 tons, 500 tons and 1000 tons Load Cells
16)
17)
18)
YOKOGAWA Thermometer
19)
20)
PROCEQ Profometer 5
21)
22)
23)
24)
20 1
ROCK TEST
NO.
OUR CLIENT
1)
PROJECT
-
and
Sebahagian
20 - 2
-
2)
3)
4)
5)
21 1
RENTAL OF LOAD CELLS
LOAD CELLS CAPACITY 1000 TONS
NO.
OUR CLIENT
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
21 2
LOAD CELLS CAPACITY 800 TONS
NO.
OUR CLIENT
1)
2)
OUR CLIENT
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
OUR CLIENT
1)
2)
3)
4)
5)
6)
22 1
FWD / HWD TEST
NO.
OUR CLIENT
PROJECT
1)
2)
3)
4)
5)
6)
7)
8)
23 1
CAISSON PILE TEST
(Friction Load Test)
NO.
OUR CLIENT
1)
2)
PROJECT
-
3)
4)
5)
6)
7)
23 2
CAISSON PILE TEST
(Plate Bearing Test)
NO.
OUR CLIENT
1)
PROJECT
-
Perseketuan
2)
3)
4)
Majustruktur
Tekton Beacon Sdn Bhd
5)
Kuala Lumpur
MRRS Phase 3A Sambungan
MRRS Phase 2B-KGV Interchange7
Projek Membina Jalan Lingkaran
Tengah Seremban Negeri SembilanFasa 3A Main line
MRT VI, Sungai Buloh
Bestraya Interchange
Proposed Fourth Lane Widening
Between Shah Alam Interchange
(km 8.9 NKVE) and Sungai Buloh
(km 457 NSE)
Proposed Fourth Lane Widening
Between Shah Alam Interchange
(km 8.9 NKVE) and Sungai Buloh
(km 457 NSE)
24 1
ASPHALT CORING & DYNAMIC CONE PENETRATION (DCP) TEST
NO.
OUR CLIENT
1)
Selia Selenggara
Engineering SB
(HDMJalan Di Bawah
Seliaan Dewan Bandaraya Kuala
Lumpur
PROJECT
-