84 NE Loop 410 STE 325 10555 West Little York Dr.

San Antonio, TX 78216 Houston, TX 77041


(800) 576-1071 (800) 576-1071
(210) 579-1925 fax (281) 741-5272 fax

To: Cottonwood Capital


Attn: La Donna Donnan
Job Name: Copperfield Apartment Homes
11245 Sir Winston Dr.
San Antonio, TX 78216

Copperfield fencing and gazebo rehab

HB Southern Builders LLC proposes to replace rotted boards and repair screens on existing patio fences. Install new
patio fencing to match existing on patios that currently have none. Remove and replace 6' privacy fencing around
dumpsters at 4 locations. Install 20 new prehung 32" x 80" patio storage doors. Make necessary repairs to gazebo by
swimming pool. Prep, prime and paint to match all new materials installed.

Scope of Work:

Building 1
Remove and replace pressure treated 2x4 LF 132.00
Remove and replace pressure treated 2x6 LF 44.00
Remove and replace pressure treated 1x4 LF 44.00
Remove and replace pressure treated 4x4 post LF 56.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 150.00

Building 2
Remove and replace pressure treated 2x4 LF 305.00
Remove and replace pressure treated 2x6 LF 86.00
Remove and replace pressure treated 1x4 LF 86.00
Remove and replace pressure treated 4x4 post LF 20.00
Install 4x4 Simpson Strong Tie standoff post base EA 5.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 294.00

Building 3
Remove and replace pressure treated 2x4 LF 207.00
Remove and replace pressure treated 2x6 LF 45.00
Remove and replace pressure treated 1x4 LF 45.00
Remove and replace pressure treated 4x4 post LF 36.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 154.00

Building 4
Remove and replace pressure treated 2x4 LF 140.00
Remove and replace pressure treated 2x6 LF 70.00
Remove and replace pressure treated 1x4 LF 70.00
Remove and replace pressure treated 4x4 post LF 48.00
Install 4x4 Simpson Strong Tie standoff post base EA 12.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 236.00

Page 1 Copperfield fence proposal


Building 5
Remove and replace pressure treated 2x4 LF 112.00
Remove and replace pressure treated 2x6 LF 65.00
Remove and replace pressure treated 1x4 LF 56.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 192.00

Building 6
Remove and replace pressure treated 2x4 LF 60.00
Remove and replace pressure treated 2x6 LF 30.00
Remove and replace pressure treated 1x4 LF 30.00
Remove and replace pressure treated 4x4 post LF 24.00
Install 4x4 Simpson Strong Tie standoff post base EA 6.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 104.00

Building 7
Remove and replace pressure treated 2x4 LF 98.00
Remove and replace pressure treated 2x6 LF 41.00
Remove and replace pressure treated 1x4 LF 41.00
Remove and replace pressure treated 4x4 post LF 20.00
Install 4x4 Simpson Strong Tie standoff post base EA 5.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 140.00

Building 8
Remove and replace pressure treated 2x4 LF 92.00
Remove and replace pressure treated 2x6 LF 41.00
Remove and replace pressure treated 1x4 LF 41.00
Remove and replace pressure treated 4x4 post LF 20.00
Install 4x4 Simpson Strong Tie standoff post base EA 5.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 140.00

Building 9
Remove and replace pressure treated 2x4 LF 305.00
Remove and replace pressure treated 2x6 LF 86.00
Remove and replace pressure treated 1x4 LF 86.00
Remove and replace pressure treated 4x4 post LF 20.00
Install 4x4 Simpson Strong Tie standoff post base EA 5.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 294.00

Building 10
Remove and replace pressure treated 2x4 LF 293.00
Remove and replace pressure treated 2x6 LF 123.00
Remove and replace pressure treated 1x4 LF 123.00
Remove and replace pressure treated 4x4 post LF 80.00
Install 4x4 Simpson Strong Tie standoff post base EA 20.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 240.00

Building 11
Remove and replace pressure treated 2x4 LF 305.00
Remove and replace pressure treated 2x6 LF 86.00

Page 2 Copperfield fence proposal


Remove and replace pressure treated 1x4 LF 86.00
Remove and replace pressure treated 4x4 post LF 20.00
Install 4x4 Simpson Strong Tie standoff post base EA 5.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 294.00

Building 12
Remove and replace pressure treated 2x4 LF 90.00
Remove and replace pressure treated 2x6 LF 28.00
Remove and replace pressure treated 1x4 LF 28.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 96.00

Building 13
Remove and replace pressure treated 2x4 LF 90.00
Remove and replace pressure treated 2x6 LF 60.00
Remove and replace pressure treated 1x4 LF 72.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 96.00

Building 14
Remove and replace pressure treated 2x4 LF 90.00
Remove and replace pressure treated 2x6 LF 68.00
Remove and replace pressure treated 1x4 LF 28.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 96.00

Building 15
Remove and replace pressure treated 2x4 LF 90.00
Remove and replace pressure treated 2x6 LF 60.00
Remove and replace pressure treated 1x4 LF 28.00
Remove and replace 3 1/2" X 4' pressure treated fence picket EA 96.00

Building 16
Remove and replace pressure treated 2x6 LF 40.00

Building 17
Remove and replace pressure treated 1x2 LF 800.00
Remove and replace charcoal patio fiberglass screen wire SF 2,560.00

Building 18
Remove and replace pressure treated 1x2 LF 800.00
Remove and replace charcoal patio fiberglass screen wire SF 2,560.00

Dumpster Enclosures
Remove and replace pressure treated 2x4 LF 313.00
Remove and replace pressure treated 2x6 LF 159.00
Remove and replace pressure treated 1x4 LF 189.00
Remove and replace pressure treated 4x4 post LF 208.00
Remove old posts and concrete reset new posts in concrete EA 26.00
Remove and replace 3 1/2" X 6' pressure treated fence picket EA 483.00

Gazebo
Remove and replace cedar 1x2 LF 1,920.00

Page 3 Copperfield fence proposal


Remove and replace cedar 1x4 LF 112.00
Install 3'x3'x6"x1/4" metal L brackets lag bolted in at all 4 corners EA 4.00

Patio Storage Doors


Remove and replace 32" x 80" prehung hollow core wood doors, paint to match existing EA 20.00
(Location of doors to be replaced will be determined by management)

Paint
Areas to be painted are all patio fencing on 18 buildings, 4 dumpster enclosures, 20 new patio storage doors. Scrape
and sand all loose paint from existing materials to be painted. Prime all new or raw wood. Paint 1 coat to match
existing paint scheme.

Permits and Fees:


HB Southern will be responsible for any permits or associated fees for this project.

Dumpsters:
HB Southern will provide dumpsters and will maintain debris removal throughout the day with a complete pickup of all
debris at the end of each work day.

Completion Schedule:
HB Southern will complete the project within 30 calendar days from start of construction.
**HB Southern cannot be responsible for delays caused by weather.

Exclusions:
Any work not described in the attached scope of work
Lead Paint or Asbestos Surveys or Abatement

Warranty:
1 year for all materials and workmanship

We propose to provide all labor, material and equipment to perform all work listed in the scopes of work listed above
in a professional and timely manner with all work meeting all city and state building codes for:
$47,237.56
Our bid price is guaranteed for 30 days. Work will be billed weekly as job progresses. Net 15

Thanks for the opportunity to bid this project. We look forward to working with you in the very near future.

Approved by: Date:

Please fax a signed copy to (210) 579-1925 so we can schedule a start date.

Page 4 Copperfield fence proposal