Per Unit

.005
1K

.01

.03

.05

.1

.3

.5

500

300

100

10

30

50

100
1K

1.908kA @ 11kV
NMC hospital SWS bus B
CT10 - T3
11 KV 1 PH FAULT CURVE
Base
Normal
02-11-2015

500

300

100

A05 SE44 OCR - G


OC1
Siemens
7SJ62
CT Ratio 600:1
IEC - Normal Inverse
Pickup = 0.2 (0.05 - 4 Sec - 1A)
Time Dial = 0.22
3x = 1.39 s, 5x = 0.942 s, 8x = 0.725 s
Inst = 4 (0.05 - 35 Sec - 1A)
Time Delay = 0.01 s
1.908 kA @ 11 kV
t1: 0.541 s

50

30

10

SWS IC 1 OCR - G
OC1

SWS B/C OCR - G


OC1

1.908 kA @ 11 kV
t1: 0.295 s

ABB
REF 610
CT Ratio 600:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.12
3x = 0.756 s, 5x = 0.514 s, 8x = 0.396 s
1.908 kA @ 11 kV
t1: 0.295 s

.5

TR OCR 2 - G
OC1

.3

.1

.05

I>

.03
R

50

30

10

.5

.3

ABB
REF 610
CT Ratio 100:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.05
3x = 0.315 s, 5x = 0.214 s, 8x = 0.165 s
Inst = 200 (5 - 400 xCT Sec)
Time Delay = 0.05 s
1.908 kA @ 11 kV
t1: 0.05 s

.1

.05

A05 SE44 OCR

.03

SWS IC 1 OCR

SWS B/C OCR

TR OCR 2

T3
1.5 MVA

.01
.005

.01

.03

.05

.1

.3

.5

10

Per Unit

50

.01
100

ETAP Star 7.0.0

Star2
Project: NMC specialty
Location: abu dhabi
Contract:
Engineer:
Filename: C:\ETAP 700\NMC speciality hospital\NMC speciality hospital.OTI

30

Date:
SN:
Rev:
Fault:

02-11-2015
12345678
Base
Ground(Normalized)

Seconds

Seconds

Normalized (shifted) TCC


Line-to-Ground (Sym) fault:
Adj Bus:
Connector:
SQOP File:
Data Rev:
Configuration:
Date: