DAFTAR ANALISA HARGA SATUAN PEKERJAAN

TAHUN ANGGARAN 2011

KODE

U RAIAN

VOLUME
SAT
JML

100.01 1 M2 PEK. PENGUKURAN DAN PEMASANGAN BOUWPLANK


Kayu Terentang
M3
Paku 5-7
Kg
Mandor
Oh
Kepala tukang
Oh
Tukang kayu
Oh
Pekerja
Oh
Total
Keuntungan Max
Total Harga
100.02 1 M2 PEK. KANTOR DIREKSI
Kayu klas II
M3
Paku
Kg
Seng Glb BJLS 28 (80x180 cm)
Lbr
Triplek 3 mm
Lbr
PC
Kg
Pasir Pasang
M3
Bata Merah
Bh
Peralatan
Ls
Ongkos Pasang
Ls
Total
Keuntungan Max
Total Harga
100.03 1 M2 LOS KERJA /GUDANG
Kayu klas II
M3
Paku
Kg
Seng Glb BJLS 28 (80x180 cm)
Lbr
Triplek 3 mm
Lbr
PC
Kg
Peralatan
Ls
Ongkos Pasang
Ls
Total
Keuntungan Max
Total Harga
100.04 1 M2 PAPAN NAMA PROYEK
Kayu Terentang
M3
Paku
Kg
Cat minyak
Ltr
Penulisan
Ls
Ongkos Pasang
Ls
Total
Keuntungan Max
Total Harga
100.05 1 M1 PAGAR PENGAMAN PROYEK
Seng Glb BJLS 28 (80x180 cm)
Lbr
Kayu Terentang
M3
Paku
Kg
Pengecatan cat minyak 2x bag. luar
Kg
Ongkos pasang
Ls
Total
Keuntungan Max
Total Harga
150.01 1 M2 PEK. PERATAAN TANAH
Pekerja
Org
Mandor
Org
Alat bantu
Ls
Total
Keuntungan Max
Total Harga
150.02 1 M3 PEK. GALIAN TANAH BIASA KEDALAMAN 1 M'
Pekerja
Org
Mandor
Org
Alat bantu
Ls
Total
Keuntungan Max
Total Harga

0.0190
0.0200
0.0050
0.0100
0.1000
0.1000

0.1000
0.2500
1.1000
0.5000
5.0000
0.2500
70.0000
1.0000
1.0000

0.1000
0.2500
1.1000
0.5000
5.0000
1.0000
1.0000

0.1300
0.2500
1.0000
1.0000
1.0000

1.4300
0.0360
0.0200
1.8000
1.0000

0.0400
0.0040
1.0000

0.4000
0.0400
1.0000

HARGA
SATUAN
(Rp.)
4

2,420,000.00
19,500.00
55,000.00
50,000.00
45,000.00
40,000.00

2,310,000.00
19,500.00
69,000.00
63,500.00
1,250.00
128,500.00
460.00
5,000.00
40,000.00

3,190,000.00
19,500.00
69,000.00
63,500.00
1,250.00
2,500.00
35,000.00

2,420,000.00
19,500.00
18,400.00
50,000.00
25,000.00

69,000.00
2,420,000.00
19,500.00
21,000.00
7,500.00

40,000.00
55,000.00
500.00

40,000.00
55,000.00
500.00

B IAYA
(Rp.)
UPAH
5

JUMLAH
HARGA
(Rp.)
7

BAHAN
6

275.00
500.00
4500.00
4000.00
9,275.00
927.50
10,202.50

45980.00
390.00
46,370.00
4,637.00
51,007.00

61,209.50

40,000.00
40,000.00
4,000.00
44,000.00

231,000.00
4,875.00
75,900.00
31,750.00
6,250.00
32,125.00
32,200.00
5,000.00
419,100.00
41,910.00
461,010.00

505,010.00

35,000.00
35,000.00
3,500.00
38,500.00

319,000.00
4,875.00
75,900.00
31,750.00
6,250.00
2,500.00
440,275.00
44,027.50
484,302.50

522,802.50

50,000.00
25,000.00
75,000.00
7,500.00
82,500.00

314,600.00
4,875.00
18,400.00
337,875.00
33,787.50
371,662.50

454,162.50

98,670.00
87,120.00
390.00
37,800.00
223,980.00
22,398.00
246,378.00

254,628.00

7,500.00
7,500.00
750.00
8,250.00
1,600.00
220.00
500.00
2,320.00
232.00
2,552.00

16,000.00
2,200.00
18,200.00
1,820.00
20,020.00

0.00
0.00
0.00

2,552.00

500.00
500.00
50.00
550.00

20,570.00

1
2
150.03 1 M3 PEK. GALIAN TANAH KEDALAMAN 2 M'
Pekerja
Org
Mandor
Org
Alat bantu
Ls
Total
Keuntungan Max
Total Harga
150.04 1 M3 GALIAN TANAH SUMURAN MAKSIMUM
KEDALAMAN 5 M'
Pekerja
Org
Mandor
Org
Alat bantu
Ls
Total
Keuntungan Max
Total Harga
150.05 1 M3 GALIAN TANAH BERBATU MAKSIMUM
KEDALAMAN 1 M'
Pekerja
Org
Mandor
Org
Alat bantu
Ls
Total
Keuntungan Max
Total Harga
150.06 1 M3 URUGAN KEMBALI PONDASI DIHITUNG
1/4 DARI GALIAN
Pekerja
Org
Mandor
Org
Alat bantu
Ls
Total
Keuntungan Max
Total Harga
150.07 1 M3 PEMADATAN TANAH ( TIAP 20 CM) TANAH DARI LUAR
Tanah urug/Tanah Merah (tiap 20 cm)
M3
Alat bantu (stamper)
Ls
Pekerja
Org
Mandor
Org
Total
Keuntungan Max
Total Harga
150.08 1 M3 URUGAN PAKAI ALAT BESAR TANAH
DARI LUAR
Pek. galian ( org) 50%
M3
Pek. galian tanah berbatu (10 org) 50%
M3
Pek. galian tanah biasa (10 org) 50%
M3
Pek. grading plant (10 org) 50%
M2
Beli tanah + angkut max 10 km
M3
Total
Keuntungan Max
Total Harga
150.09 1 M3 URUGAN PASIR URUG
Pasir urug
M3
Pekerja
Org
Mandor
Org
Total
Keuntungan Max
Total Harga
200.01 1 M3 LANTAI KERJA 1PC:3PS:5KRL
PC
Kg
Pasir Beton
M3
Split pecah mesin 2/3
M3
Pekerja
Org
Tukang Batu
Org
Kep. Tukang batu
Org
Mandor
Org
Total
Keuntungan Max
Total Harga
200.02 1 M3 PAS. BETON CYCLOOF + 40% BATU KALI
PC
Kg
Pasir Beton
M3
Split pecah mesin 2/3
M3
Kawat beton
Kg
Pekerja
Org
Tukang Batu
Org
Kep. Tukang batu
Org
Mandor
Org
Total
Keuntungan Max
Total Harga

4
0.5260
0.0520
1.0000

1.1530
0.1150
1.0000

0.6250
0.0620
1.0000

0.1920
0.0190
1.0000

1.2000
1.0000
0.2500
0.0100

0.6000
0.6000
0.3500
6.0000
1.2000

1.2000
0.3000
0.0100

218.0000
0.5200
0.8700
1.6500
0.2500
0.0250
0.0800

202.0000
0.3200
0.4900
0.8000
3.0000
0.8500
0.0850
0.1500

40,000.00
55,000.00
500.00

40,000.00
55,000.00
1,500.00

40,000.00
55,000.00
1,000.00

40,000.00
55,000.00
500.00

71,500.00
1,500.00
40,000.00
55,000.00

10,285.00
16,175.50
29,669.75
6,900.00
71,500.00

86,000.00
40,000.00
55,000.00

1,250.00
165,000.00
146,500.00
40,000.00
45,000.00
50,000.00
55,000.00

1,250.00
165,000.00
146,500.00
20,500.00
40,000.00
45,000.00
50,000.00
55,000.00

21,040.00
2,860.00
23,900.00
2,390.00
26,290.00

500.00
500.00
50.00
550.00

26,840.00

46,120.00
6,325.00
52,445.00
5,244.50
57,689.50

1,500.00
1,500.00
150.00
1,650.00

59,339.50

25,000.00
3,410.00
28,410.00
2,841.00
31,251.00

1,000.00
1,000.00
100.00
1,100.00

32,351.00

7,680.00
1,045.00
8,725.00
872.50
9,597.50

500.00
500.00
50.00
550.00

10,147.50

10,000.00
550.00
10,550.00
1,055.00
11,605.00

85,800.00
1,500.00
87,300.00
8,730.00
96,030.00

107,635.00

0.00
0.00
0.00
0.00
85,800.00
85,800.00
8,580.00
94,380.00

3,085.50
4,852.65
5,192.21
20,700.00
33,830.36
3,383.04
37,213.39

131,593.39

12,000.00
550.00
12,550.00
1,255.00
13,805.00

103,200.00
103,200.00
10,320.00
113,520.00

127,325.00

66,000.00
11,250.00
1,250.00
4,400.00
82,900.00
8,290.00
91,190.00

272,500.00
85,800.00
127,455.00
485,755.00
48,575.50
534,330.50

625,520.50

120,000.00
38,250.00
4,250.00
8,250.00
170,750.00
17,075.00
187,825.00

252,500.00
52,800.00
71,785.00
377,085.00
37,708.50
414,793.50

602,618.50

1
2
200.03 1 M3 PAS. BATU KOSONG
Batu belah
Pasir urug
Pekerja
Tukang batu
Kep. Tukang batu
Mandor
Total
Keuntungan Max
Total Harga
200.04 1 M3 PAS. BATU KALI 1:3
Batu kali
PC
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
200.05 1 M3 PAS. BATU KALI 1:4
Batu kali
P.C
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
200.06 1 M3 BATU KALI 1:4 PAKAI MUKA BATU SEGI
ENAM + SIARAN
Batu kali
P.C
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
200.07 1 M2 BATU TEMPEL + SIARAN
Batu tempel
P.C
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
250.01 1 M2 PAS. BATA MERAH 1:2
Bata merah
PC
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
250.02 1 M2 PAS. BATA MERAH 1:4
Bata merah
P.C
Pasir pasang
Pekerja
Tukang Batu
Kep. tukang batu
Mandor
Total
Keuntungan Max
Total Harga

3
M3
M3
Org
Org
Org
Org

M3
Kg
M3
Org
Org
Org
Org

M3
Kg
M3
Org
Org
Org
Org

M3
kg
M3
Org
Org
Org
Org

M3
Kg
M3
Org
Org
Org
Org

Bh
Kg
M3
Org
Org
Org
Org

Bh
Kg
M3
Org
Org
Org
Org

4
1.2000
0.3000
0.7800
0.3900
0.0390
0.0390

1.1000
202.0000
0.4850
1.5000
0.6000
0.0600
0.0750

1.1000
163.0000
0.5200
1.5000
0.6000
0.0600
0.0750

1.5000
163.0000
0.5200
3.0000
1.5000
0.1500
0.2250

1.1000
6.0000
0.0310
0.2500
0.3000
0.0500
0.0450

70.0000
27.2000
0.0470
0.4290
0.2140
0.0210
0.0110

70.0000
10.3700
0.0580
0.4290
0.2140
0.0210
0.0110

138,600.00
86,000.00
40,000.00
45,000.00
50,000.00
55,000.00

138,600.00
1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

138,600.00
1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

138,600.00
1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

143,000.00
1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

460.00
1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

460.00
1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

31,200.00
17,550.00
1,950.00
2,145.00
52,845.00
5,284.50
58,129.50

166,320.00
25,800.00
192,120.00
19,212.00
211,332.00

269,461.50

27,000.00
3,000.00
4,125.00
34,125.00
3,412.50
37,537.50

152,460.00
252,500.00
62,322.50
60,000.00
527,282.50
52,728.25
580,010.75

617,548.25

60,000.00
27,000.00
3,000.00
4,125.00
94,125.00
9,412.50
103,537.50

152,460.00
203,750.00
66,820.00
423,030.00
42,303.00
465,333.00

568,870.50

120,000.00
67,500.00
7,500.00
12,375.00
207,375.00
20,737.50
228,112.50

207,900.00
203,750.00
66,820.00
478,470.00
47,847.00
526,317.00

754,429.50

10,000.00
13,500.00
2,500.00
2,475.00
28,475.00
2,847.50
31,322.50

157,300.00
7,500.00
3,983.50
168,783.50
16,878.35
185,661.85

216,984.35

17,160.00
9,630.00
1,050.00
605.00
28,445.00
2,844.50
31,289.50

32,200.00
34,000.00
6,039.50
72,239.50
7,223.95
79,463.45

110,752.95

17,160.00
9,630.00
1,050.00
605.00
28,445.00
2,844.50
31,289.50

32,200.00
12,962.50
7,453.00
52,615.50
5,261.55
57,877.05

89,166.55

1
2
250.03 1 M2 PLESTERAN DINDING 1:2 + ACIAN
P.C
Pasir pasang
Pekerja
Tukang Batu
Kep. tukang batu
Mandor
Total
Keuntungan Max
Total Harga
250.04 1 M2 PLESTERAN DINDING 1:3 + ACIAN
P.C
Pasir pasang
Pekerja
Tukang Batu
Kep. tukang batu
Mandor
Total
Keuntungan Max
Total Harga
250.05 1 M2 PLESTERAN DINDING 1:4 + ACIAN
P.C
Pasir Pasang
Pekerja
Tukang batu
Kep. tukang batu
Mandor
Total
Keuntungan Max
Total Harga
250.06 1 M2 PLESTERAN DINDING 1:5 + ACIAN
P.C
Pasir Pasang
Pekerja
Tukang batu
Kep. tukang batu
Mandor
Total
Keuntungan Max
Total Harga
300.01 1 M2 DINDING KERAMIK DN PUTIH KW II
Keramik KW II DN Putih
P.C
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total
Keuntungan Max
Total Harga
300.02 1 M2 LANTAI KERAMIK DN PUTIH KW II
Keramik KW II DN Putih
P.C
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total
Keuntungan Max
Total Harga
300.03 1 M2 DINDING KERAMIK BERCORAK/
BERWARNA KW II
Keramik KW II DN Bercorak
P.C
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kep. Tukang batu
Mandor
Total
Keuntungan Max
Total Harga

3
Kg
M3
Org
Org
Org
Org

Kg
M3
Org
Org
Org
Org

Kg
M3
Org
Org
Org
Org

Kg
M3
Org
Org
Org
Org

M2
Kg
M3
Kg
Org
Org
Org
Org

M2
Kg
M3
Kg
Org
Org
Org
Org

M3
Kg
M3
Kg
Org
Org
Org
Org

4
14.2800
0.0230
0.2500
0.2000
0.0200
0.0125

10.8000
0.0260
0.2500
0.2000
0.0200
0.0125

8.6800
0.0280
0.2500
0.2000
0.0200
0.0125

7.2900
0.0280
0.2500
0.2000
0.0200
0.0125

1.0100
9.3000
0.0180
1.5000
0.6000
0.1250
0.0125
0.0300

1.0100
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300

1.0100
9.3000
0.0180
1.5000
0.6000
0.1250
0.0125
0.0300

1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

46,000.00
1,250.00
128,500.00
5,700.00
40,000.00
45,000.00
50,000.00
55,000.00

46,000.00
1,250.00
128,500.00
5,700.00
40,000.00
45,000.00
50,000.00
55,000.00

51,000.00
1,250.00
128,500.00
5,700.00
40,000.00
45,000.00
50,000.00
55,000.00

10,000.00
9,000.00
1,000.00
687.50
20,687.50
2,068.75
22,756.25

17,850.00
2,955.50
20,805.50
2,080.55
22,886.05

45,642.30

10,000.00
9,000.00
1,000.00
687.50
20,687.50
2,068.75
22,756.25

13,500.00
3,341.00
16,841.00
1,684.10
18,525.10

41,281.35

10,000.00
9,000.00
1,000.00
687.50
20,687.50
2,068.75
22,756.25

10,850.00
3,598.00
14,448.00
1,444.80
15,892.80

38,649.05

10,000.00
9,000.00
1,000.00
687.50
20,687.50
2,068.75
22,756.25

9,112.50
3,598.00
12,710.50
1,271.05
13,981.55

36,737.80

24,000.00
5,625.00
625.00
1,650.00
31,900.00
3,190.00
35,090.00

46,460.00
11,625.00
2,313.00
8,550.00
68,948.00
6,894.80
75,842.80

110,932.80

24,800.00
15,750.00
1,750.00
1,650.00
43,950.00
4,395.00
48,345.00

46,460.00
14,225.00
5,397.00
8,550.00
74,632.00
7,463.20
82,095.20

130,440.20

24,000.00
5,625.00
625.00
1,650.00
31,900.00
3,190.00
35,090.00

51,510.00
11,625.00
2,313.00
8,550.00
73,998.00
7,399.80
81,397.80

116,487.80

1
2
300.04 1 M2 LANTAI KERAMIK 20/20 BERCORAK/
BERWARNA KW II KM/WC
Keramik KW II DN bercorak/berwarna
PC
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kep. Tukang batu
Mandor
Total
Keuntungan Max
Total Harga
300.05 1 M2 LANTAI KERAMIK DN BERCORAK/
BERWARNA KW II
Keramik KW II bercorak/berwarna
PC
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kep. Tukang batu
Mandor
Total
Keuntungan Max
Total Harga
300.06 1 M2 PAS. LANTAI UBIN PC. ABU-ABU
UK. 20X20 CM
Ubin abu-abu 20x20 cm
Semen PC
Pasir pasang
Tukang batu
Kep. Tukang batu
Mandor
Total
Keuntungan Max
Total Harga
350.01 1 M2 BEKISTING DENGAN PAPAN
Papan terentang (dihitung 2 x pakai ) 75%
Kaso 5/7 kls II (dihitung 2 x pakai ) 50%
Paku
Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor
Total
Keuntungan Max
Total Harga
350.02 1 M2 BEKISTING MULTIPLEX 9 MM
Kaso 5/7 klas II (dihitung 2 x pakai ) 50%
Multiplex 9 mm (dihitung 2 x pakai ) 75%
Paku
Pekerja
Tukang Kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
350.03 1 M2 PAS. STOOT WERK
Kaso 5/7 klas II (dihitung 2 x pakai ) 50%
Papan Terentang (dihitung 2 x pakai ) 75%
Paku
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
Total
Keuntungan Max
Total Harga

m2
kg
m3
m3
Org
Org
Org
Org

m2
Kg
M3
Kg
Org
Org
Org
Org

bh
kg
m3
Org
Org
Org

M3
M3
Kg
Org
Org
Org
Org

M3
Lbr
Kg
Org
Org
Org
Org

M3
M3
Kg
Org
Org
Org
Org

1.0100
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300

1.0100
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300

25.0000
8.1900
0.0450
0.4000
0.0130
0.0135

0.0240
0.0170
0.4000
0.1200
0.2700
0.1500
0.0500

0.0170
0.3470
0.4000
0.1200
0.2700
0.1500
0.0500

0.1260
0.0160
0.5000
0.1500
0.2000
0.2000
0.0170

51,000.00
1,250.00
128,500.00
5,700.00
40,000.00
45,000.00
50,000.00
55,000.00

51,000.00
1,250.00
128,500.00
5,700.00
40,000.00
45,000.00
50,000.00
55,000.00

1,600.00
1,250.00
128,500.00
45,000.00
50,000.00
55,000.00

2,420,000.00
3,190,000.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
161,000.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
2,420,000.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

24,800.00
15,750.00
1,750.00
1,650.00
43,950.00
4,395.00
48,345.00

51,510.00
14,225.00
5,397.00
8,550.00
79,682.00
7,968.20
87,650.20

135,995.20

24,800.00
15,750.00
1,750.00
1,650.00
43,950.00
4,395.00
48,345.00

51,510.00
14,225.00
5,397.00
8,550.00
79,682.00
7,968.20
87,650.20

135,995.20

18,000.00
650.00
742.50
19,392.50
1,939.25
21,331.75

40,000.00
10,237.50
5,782.50
56,020.00
5,602.00
61,622.00

82,953.75

4,800.00
12,150.00
7,500.00
2,750.00
27,200.00
2,720.00
29,920.00

43,560.00
27,115.00
7,800.00
78,475.00
7,847.50
86,322.50

116,242.50

4,800.00
12,150.00
7,500.00
2,750.00
27,200.00
2,720.00
29,920.00

27,115.00
41,900.25
7,800.00
76,815.25
7,681.53
84,496.78

114,416.78

6,000.00
9,000.00
10,000.00
935.00
25,935.00
2,593.50
28,528.50

200,970.00
29,040.00
9,750.00
239,760.00
23,976.00
263,736.00

292,264.50

1
2
350.04 1 M3 COR BETON SITE MIX K.175
PC
Split pecah mesin 2/3
Pasir beton
Peralatan
Pekerja
Tukang Batu
Kep. Tukang batu
Mandor
Total
Keuntungan Max
Total Harga
350.05 1 M3 COR BETON SITE MIX K. 225
PC
Split pecah mesin 2/3
Pasir beton
Peralatan
Pekerja
Tukang Batu
Kep. Tukang batu
Mandor
Total
Keuntungan Max
Total Harga
350.06 1 M3 COR BETON K. 175 (READYMIX)
MINIMUM 6 M3
Adukan K. 175
Upah pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Alat Pembantu ( Slang + Tes Lab)
Total
Keuntungan Max
Total Harga
350.07 1 M3 COR BETON K. 225 (READMIX)
Adukan K. 225
Upah pekerja
Tukang Batu
Kep. Tukang batu
Mandor
Alat Pembantu ( Slang + Tes Lab)
Total
Keuntungan Max
Total Harga
350.08 1 KG BETON TERPASANG U. 24
Besi Beton Rata-Rata
Kawat Beton
Pekerja
Tukang Besi beton
Kepala tukang besi beton
Mandor
Total
Keuntungan Max
Total Harga
350.09 I KG BESI BETON TERPASANG U. 39
Besi Beton Rata-Rata
Kawat Beton
Pekerja
Tk. Besi beton
Kepala tukang besi beton
Mandor
Total
Keuntungan Max
Total Harga
400.01 1 M3 PASANG KONSTRUKSI KUDA2 KAYU KLAS II
Balok kayu klas II
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga

3
Kg
M3
M3
Ls
Org
Org
Org
Org

Kg
M3
M3
Ls
Org
Org
Org
Org

M3
Org
Org
Org
Org
Ls

M3
Org
Org
Org
Org
Ls

Kg
Kg
Org
Org
Org
Org

Kg
Kg
Ls
Org
Org
Org

m3
Kg
Org
Org
Org
Org

340.0000
0.8300
0.5400
1.0000
3.0000
0.5000
0.0500
0.0100

388.0000
0.8100
0.4900
1.0000
3.0000
0.5000
0.0500
0.0100

1.0000
2.5000
0.2500
0.1000
0.0100
1.0000

1.0000
2.5000
0.2500
0.1000
0.0100
1.0000

1.1000
0.0150
0.0070
0.0070
0.0007
0.0003

1.1000
0.0150
0.0070
0.0070
0.0007
0.0003

1.1000
0.8000
4.0000
12.0000
1.2000
0.2000

1,250.00
163,000.00
165,000.00
14,500.00
40,000.00
45,000.00
50,000.00
55,000.00

1,250.00
163,000.00
165,000.00
14,500.00
40,000.00
45,000.00
50,000.00
55,000.00

809,440.00
40,000.00
45,000.00
50,000.00
55,000.00
5,000.00

857,930.00
40,000.00
45,000.00
50,000.00
55,000.00
5,000.00

12,000.00
20,500.00
40,000.00
45,000.00
50,000.00
55,000.00

12,500.00
20,500.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

120,000.00
22,500.00
2,500.00
550.00
145,550.00
14,555.00
160,105.00

425,000.00
135,290.00
89,100.00
14,500.00
663,890.00
66,389.00
730,279.00

890,384.00

120,000.00
22,500.00
2,500.00
550.00
145,550.00
14,555.00
160,105.00

485,000.00
132,030.00
80,850.00
14,500.00
712,380.00
71,238.00
783,618.00

943,723.00

100,000.00
11,250.00
5,000.00
550.00
116,800.00
11,680.00
128,480.00

809,440.00
5,000.00
814,440.00
81,444.00
895,884.00

1,024,364.00

100,000.00
11,250.00
5,000.00
550.00
116,800.00
11,680.00
128,480.00

857,930.00
5,000.00
862,930.00
86,293.00
949,223.00

1,077,703.00

315.00
35.00
16.50
366.50
36.65
403.15

13,200.00
307.50
280.00
13,787.50
1,378.75
15,166.25

15,569.40

315.00
35.00
16.50
366.50
36.65
403.15

13,750.00
307.50
280.00
14,337.50
1,433.75
15,771.25

16,174.40

3,509,000.00
15,600.00
3,524,600.00
352,460.00
3,877,060.00

160,000.00
540,000.00
60,000.00
11,000.00
771,000.00
77,100.00
848,100.00

4,725,160.00

1
2
400.02 1 M3 KUDA-KUDA OVERSTEK/KONSOL
KAYU KLAS II (EXSPOSE)
Kayu balok kls II
Paku
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.03 1 M3 RANGKA ATAP GENTENG BETON/KERAMIK
Kayu kaso 5/7 klas II
Reng kayu 3/4 klas II
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.04 1 M2 PEK. RANGKA ATAP GENTENG PLENTONG
Kayu kaso 5/7 klas II
Reng kayu 2/3 klas II
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.04a 1 M2 PEK. RANGKA ATAP GENTENG
PLENTONG MENGGUNAKAN BAJA HOLLOW
Besi Hollow 40 40 08
Pengelasan
Total
Keuntungan Max
Total Harga
400.06 1 M1 PEKERJAAN LISPLANK KAYU KLAS II 3/20
Kayu klas II
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.07 1 M1 PEKERJAAN LISPLANK KAYU KLAS II 3/30
Kayu kls II
Paku
Pekerja
Tukang kayu
Kepala Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.08 1 M3 KUSEN KAYU KLAS II
Kayu klas II
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.09 1 M3 KUSEN KAYU KLAS I
Kayu Kls I
Pekerja
Tukang Kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga

M3
Kg
Org
Org
Org
Org

M3
M3
Kg
Org
Org
Org
Org

M3
M3
Kg
Org
Org
Org
Org

bt
Kg

M3
Kg
Org
Org
Org
Org

M3
Kg
Org
Org
Org
Org

M3
Org
Org
Org
Org

M3
Org
Org
Org
Org

1.2000
0.8000
4.0000
12.0000
1.2000
0.2000

0.0092
0.0048
0.1500
0.1000
0.1000
0.0100
0.0050

0.0072
0.0048
0.1500
0.1000
0.1000
0.0100
0.0050

1.0000
4.0000

0.0072
0.0500
0.1000
0.2000
0.0200
0.0050

0.0110
0.0500
0.1100
0.2200
0.0220
0.0050

1.2000
6.0000
18.0000
2.0000
0.3000

1.2000
6.0000
18.0000
2.0000
0.3000

3,190,000.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
3,349,500.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
3,349,500.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

69,000.00
8,033.00

3,190,000.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
19,500.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
40,000.00
45,000.00
50,000.00
55,000.00

4,042,000.00
40,000.00
45,000.00
50,000.00
55,000.00

160,000.00
540,000.00
60,000.00
11,000.00
771,000.00
77,100.00
848,100.00

3,828,000.00
15,600.00
3,843,600.00
384,360.00
4,227,960.00

5,076,060.00

4,000.00
4,500.00
500.00
275.00
9,275.00
927.50
10,202.50

29,348.00
16,077.60
2,925.00
48,350.60
4,835.06
53,185.66

63,388.16

4,000.00
4,500.00
500.00
275.00
9,275.00
927.50
10,202.50

22,968.00
16,077.60
2,925.00
41,970.60
4,197.06
46,167.66

56,370.16

69,000.00
32,132.00
32,132.00
3,213.20
35,345.20

69,000.00
6,900.00
75,900.00

111,245.20

4,000.00
9,000.00
1,000.00
275.00
14,275.00
1,427.50
15,702.50

22,968.00
975.00
23,943.00
2,394.30
26,337.30

42,039.80

4,400.00
9,900.00
1,100.00
275.00
15,675.00
1,567.50
17,242.50

35,090.00
975.00
36,065.00
3,606.50
39,671.50

56,914.00

240,000.00
810,000.00
100,000.00
16,500.00
1,166,500.00
116,650.00
1,283,150.00

3,828,000.00
3,828,000.00
382,800.00
4,210,800.00

5,493,950.00

240,000.00
810,000.00
100,000.00
16,500.00
1,166,500.00
116,650.00
1,283,150.00

4,850,400.00
4,850,400.00
485,040.00
5,335,440.00

6,618,590.00

1
2
400.10 1 M2 DAUN PINTU PANIL KAYU KLAS II
Rangka + Panil kayu klas II
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
1 M2 DAUN PINTU triplek t= 5 mm KAYU KLAS II
Rangka + Panil kayu klas II
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.11 1 M2 DAUN PINTU DOUBLE TEAKWOOD
Rangka kayu klas II
Teakwood untuk pintu uk. pintu 4 mm
Lem putih (POX)
Paku triplek
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.12 1 M2 DAUN PINTU PANIL TEAKWOOD
Rangka kayu klas II
Teakwood untuk pintu uk.pintu 4 mm
Lem putih (POX)
Paku triplek
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.13 1 M2 DAUN PINTU TEAKWOOD LAPIS
ALUMUNIUM (U/KM/WC)
Rangka kayu klas II
Teakwood untuk pintu uk. pintu 4 mm
Alumunium Sheet 0,3 mm
Paku triplex
Lem putih (POX)
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.14 1 M2 DAUN PINTU TEAKWOOD LAPIS FORMIKA
(U/KM/WC)
Rangka kayu klas II
Teakwood untuk pintu uk. pintu 4 mm
Formika ukuran pintu
Paku triplek
Lem putih (POX)
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.15 1 M2 DAUN JENDELA KACA (TANPA KACA)
Rangka kayu klas II
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga

M3
Org
Org
Org
Org

0.0400
1.0000
2.5000
0.2500
0.0500

M3
Org
Org
Org
Org

0.0144
0.0395
1.0000
2.5000
0.2500
0.0500

M3
Lbr
Kg
Kg
Org
Org
Org
Org

M3
Lbr
Kg
Kg
Org
Org
Org
Org

M3
Lbr
M2
Kg
Lbr
Org
Org
Org
Org

M3
Lbr
Lbr
Kg
Kg
Org
Org
Org
Org

M3
Org
Org
Org
Org

0.0196
1.0000
0.3000
0.3000
0.6000
2.0000
0.2000
0.0300

0.0500
1.0000
0.3000
0.3000
0.6000
2.0000
0.2000
0.0300

0.0196
0.5000
1.8000
0.3000
0.8000
0.8000
2.5000
0.2500
0.0400

0.0196
0.5000
1.0000
0.3000
1.2000
1.0000
2.6000
0.2600
0.0500

0.0300
0.8000
2.0000
0.2000
0.0400

3,465,000.00
40,000.00
45,000.00
50,000.00
55,000.00

3,465,000.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
150,000.00
19,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
150,000.00
19,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
150,000.00
45,000.00
23,000.00
19,000.00
40,000.00
45,000.00
50,000.00
55,000.00

3,190,000.00
150,000.00
161,500.00
23,000.00
19,000.00
40,000.00
45,000.00
50,000.00
55,000.00

3,465,000.00
40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
112,500.00
12,500.00
2,750.00
167,750.00
16,775.00
184,525.00

138,600.00
138,600.00
13,860.00
152,460.00

336,985.00

40,000.00
112,500.00
12,500.00
2,750.00
167,750.00
16,775.00
184,525.00

136,715.04
136,715.04
13,671.50
150,386.54

334,911.54

24,000.00
90,000.00
10,000.00
1,650.00
125,650.00
12,565.00
138,215.00

62,524.00
150,000.00
5,700.00
6,900.00
225,124.00
22,512.40
247,636.40

385,851.40

24,000.00
90,000.00
10,000.00
1,650.00
125,650.00
12,565.00
138,215.00

159,500.00
150,000.00
5,700.00
6,900.00
322,100.00
32,210.00
354,310.00

492,525.00

32,000.00
112,500.00
12,500.00
2,200.00
159,200.00
15,920.00
175,120.00

62,524.00
75,000.00
81,000.00
6,900.00
15,200.00
240,624.00
24,062.40
264,686.40

439,806.40

40,000.00
117,000.00
13,000.00
2,750.00
172,750.00
17,275.00
190,025.00

62,524.00
75,000.00
161,500.00
6,900.00
22,800.00
328,724.00
32,872.40
361,596.40

551,621.40

32,000.00
90,000.00
10,000.00
2,200.00
134,200.00
13,420.00
147,620.00

103,950.00
103,950.00
10,395.00
114,345.00

261,965.00

1
2
400.16 1 M2 DAUN PINTU KACA (TANPA KACA)
Rangka kayu klas II
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.17 1 M2 DAUN PINTU/JENDELA JALUSI
Rangka kayu klas II
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
400.18 1 M2 JALUSI MATI PADA KUSEN
Papan kayu klas II
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.01 1 M2 PAS. PLAFOND TRIPLEX 4 MM BERIKUT
RANGKA KAYU TERENTANG
Triplek 4 mm
Kayu terentang
Paku
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.02 1 M2 PAS. PLAFOND TRIPLEX 4 MM BERIKUT
RANGKA KLAS II
Triplek 4 mm
Kayu Klas II
Paku
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.03 I M2 PAS. PLAFOND TRIPLEX 6 MM BERIKUT
RANGKA KAYU TERENTANG
Triplek 6 mm
Kayu terentang
Paku
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.04 I M2 PAS. PLAFOND TRIPLEX 6 MM BERIKUT
RANGKA KLAS II
Triplek 6 mm
Kayu klas II
Paku
Pekerja
Tukang kayu
Kep. tukang kayu
Mandor
Total
Keuntungan Max
Total Harga

3
M3
Org
Org
Org
Org

M3
Org
Org
Org
Org

M3
Lbr
Org
Org
Org
Org

Lbr
M3
Kg
Org
Org
Org
Org

Lbr
M3
Kg
Org
Org
Org
Org

Lbr
M3
Kg
Org
Org
Org
Org

Lbr
M3
Kg
Org
Org
Org
Org

4
0.0350
0.8000
2.0000
0.2000
0.0400

0.0640
1.0000
3.0000
0.3000
0.5000

0.0600
0.1500
0.5000
2.0000
0.2000
0.0250

0.3470
0.0120
0.1000
0.1500
0.2500
0.0250
0.0750

0.3470
0.0120
0.1000
0.1500
0.2500
0.0250
0.0750

0.3470
0.0120
0.1000
0.1500
0.2500
0.0250
0.0750

0.3470
0.0070
0.1000
0.1500
0.2500
0.0250
0.0750

3,465,000.00
40,000.00
45,000.00
50,000.00
55,000.00

3,465,000.00
40,000.00
45,000.00
50,000.00
55,000.00

3,465,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

78,500.00
2,420,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

78,500.00
3,190,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

115,500.00
2,420,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

115,500.00
3,190,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

32,000.00
90,000.00
10,000.00
2,200.00
134,200.00
13,420.00
147,620.00

121,275.00
121,275.00
12,127.50
133,402.50

281,022.50

40,000.00
135,000.00
15,000.00
27,500.00
217,500.00
21,750.00
239,250.00

221,760.00
221,760.00
22,176.00
243,936.00

483,186.00

207,900.00
3,450.00
211,350.00
21,135.00
232,485.00

20,000.00
90,000.00
10,000.00
1,375.00
121,375.00
12,137.50
133,512.50

365,997.50

6,000.00
11,250.00
1,250.00
4,125.00
22,625.00
2,262.50
24,887.50

27,239.50
29,040.00
2,300.00
58,579.50
5,857.95
64,437.45

178,649.90
89,324.95

6,000.00
11,250.00
1,250.00
4,125.00
22,625.00
2,262.50
24,887.50

27,239.50
38,280.00
2,300.00
67,819.50
6,781.95
74,601.45

99,488.95

6,000.00
11,250.00
1,250.00
4,125.00
22,625.00
2,262.50
24,887.50

40,078.50
29,040.00
2,300.00
71,418.50
7,141.85
78,560.35

103,447.85

6,000.00
11,250.00
1,250.00
4,125.00
22,625.00
2,262.50
24,887.50

40,078.50
22,330.00
2,300.00
64,708.50
6,470.85
71,179.35

96,066.85

1
2
450.05 1 M2 PAS. PLAFOND GRC BERIKUT
RANGKA KAYU KLAS II
Grc
Kayu klas II
Paku
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.06 1 M2 PAS. RANGKA PLAFOND KAYU TERENTANG
Kayu 5/10 terentang
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.07 1 M2 PAS. BAHAN PLAFOND TRIPLEK 4 MM
PADA RANGKANYA
Triplek 4 mm
Paku
Pekerja
Tukang kayu
Kepala Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.08 1 M2 PAS. BAHAN PLAFOND ETERNIT 4 MM
PADA RANGKANYA
Eternit 4 mm
Paku
Pekerja
Tukang kayu
Kepala Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.09 1 M2 PAS. BAHAN PLAFOND ASBES SEMEN
4 MM PADA RANGKANYA
Asbes semen 4 mm
Paku
Pekerja
Tukang kayu
Kepala Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.10 1 M2 PAS. BAHAN PLAFOND ACUSTIK PADA
RANGKANYA
Acustik
Paku
Pekerja
Tukang kayu
Kepala Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
450.10a 1 M2 PAS. BAHAN PLAFOND GYPSUM
RANGKA BESI HOLLOW
Baja Hollow 40 40 08
Baja Hollow 40 20 08
Gypsum
Paku ripet / ulir
Pekerja
Tukang
Kepala Tukang
Mandor
Total
Keuntungan Max
Total Harga

m2
M3
Kg
Org
Org
Org
Org

M3
Kg
Org
Org
Org
Org

Lbr
Kg
Org
Org
Org
Org

M2
Kg
Org
Org
Org
Org

M2
Kg
Org
Org
Org
Org

Lbr
Kg
Org
Org
Org
Org

btg
btg
Lbr
bh
Org
Org
Org
Org

2.8800
0.0070
0.1000
0.1500
0.2500
0.0250
0.0750

0.0070
0.1000
0.1500
0.2500
0.0250
0.0750

0.3470
0.0100
0.0300
0.0700
0.0070
0.0015

1.0000
0.0100
0.0300
0.0700
0.0070
0.0015

1.1000
0.0100
0.0300
0.0700
0.0070
0.0015

1.5000
0.0500
0.0600
0.1000
0.0100
0.0030

0.3300
0.3300
0.3400
35.0000
0.0600
0.1000
0.0100
0.0030

30,034.72
3,190,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

2,420,000.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

78,500.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

13,500.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

30,034.72
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

13,800.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

69,000.00
40,000.00
86,500.00
1,000.00
40,000.00
45,000.00
50,000.00
55,000.00

6,000.00
11,250.00
1,250.00
4,125.00
22,625.00
2,262.50
24,887.50

86,500.00
22,330.00
2,300.00
111,130.00
11,113.00
122,243.00

147,130.50

6,000.00
11,250.00
1,250.00
4,125.00
22,625.00
2,262.50
24,887.50

16,940.00
2,300.00
19,240.00
1,924.00
21,164.00

46,051.50

1,200.00
3,150.00
350.00
82.50
4,782.50
478.25
5,260.75

27,239.50
230.00
27,469.50
2,746.95
30,216.45

35,477.20

1,200.00
3,150.00
350.00
82.50
4,782.50
478.25
5,260.75

13,500.00
230.00
13,730.00
1,373.00
15,103.00

20,363.75

1,200.00
3,150.00
350.00
82.50
4,782.50
478.25
5,260.75

33,038.19
230.00
33,268.19
3,326.82
36,595.01

41,855.76

2,400.00
4,500.00
500.00
165.00
7,565.00
756.50
8,321.50

20,700.00
1,150.00
21,850.00
2,185.00
24,035.00

32,356.50

2,400.00
4,500.00
500.00
165.00
7,565.00
756.50
8,321.50

22,770.00
13,200.00
29,410.00
35,000.00
100,380.00
10,038.00
110,418.00

118,739.50

1
2
500.01 1 M2 PEK. ATAP GENTENG PLENTONG
EX. JATIWANGI
Genteng plentong
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
500.02 1 M2 PEK. ATAP GENTENG BETON
Genteng beton
Paku
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
500.03 1 M2 PEK. ATAP GENTENG KERAMIK
Reain bow
Genteng keramik
Baut 5/7 cm
Pekerja
Tukang Besi
Mandor
Total
Keuntungan Max
Total Harga
500.04 1 M2 PASANG ATAP ASBES GELOMBANG
80 X 180 X 4 M
Asbes gelombang
Paku sekurp 3"-5"
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
500.05 1 M1 PEK. BUBUNGAN ATAP GENTENG PLENTONG
Genteng Bubungan Genteng plentong
PC
Pasir pasang
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total
Keuntungan Max
Total Harga
500.06 1 M1 PEK. BUBUNGAN ATAP GENTENG BETON
Genteng Bubungan Genteng Beton
PC
Pasir Pasang
Paku
Semen warna
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total
Keuntungan Max
Total Harga
500.07 1 M1 PEK. BUBUNGAN ATAP GENTENG METAL
Genteng Bubungan Genteng mettal
Baut 5/7 cm
Pekerja
Tukang Besi
Kep. Tukang kepala tukang besi
Mandor
Total
Keuntungan Max
Total Harga

bh
Org
Org
Org
Org

bh
kg
Org
Org
Org
Org

lbr
bh
Org
Org
Org

Lb
Bh
Org
Org
Org
Org

Bh
kg
m3
Org
Org
Org
Org

Bh
kg
Lbr
kg
kg
Org
Org
Org
Org

m'
bh
Org
Org
Org
Org

25.0000
0.1500
0.0750
0.0080
0.0080

11.0000
0.0300
0.2000
0.1000
0.0100
0.0100

1.0000
6.0000
0.0600
0.1200
0.0100

0.6000
4.0000
0.0080
0.1400
0.0750
0.0080

5.0000
8.0000
0.0320
0.4000
0.2000
0.0200
0.0020

3.5000
10.8000
0.0320
0.0500
1.0000
0.4000
0.2000
0.0200
0.0200

1.0000
6.0000
0.4000
0.2000
0.0200
0.0020

1,700.00
40,000.00
45,000.00
50,000.00
55,000.00

10,300.00
23,000.00
40,000.00
45,000.00
50,000.00
55,000.00

95,800.00
750.00
40,000.00
45,000.00
55,000.00

69,000.00
1,000.00
40,000.00
45,000.00
50,000.00
55,000.00

5,700.00
1,250.00
128,500.00
40,000.00
45,000.00
50,000.00
55,000.00

11,500.00
1,250.00
128,500.00
23,000.00
5,700.00
40,000.00
45,000.00
50,000.00
55,000.00

164,000.00
750.00
40,000.00
45,000.00
50,000.00
55,000.00

6,000.00
3,375.00
400.00
440.00
10,215.00
1,021.50
11,236.50

42,500.00

8,000.00
4,500.00
500.00
550.00
13,550.00
1,355.00
14,905.00

2,400.00
5,400.00
550.00
8,350.00
835.00
9,185.00

42,500.00
4,250.00
46,750.00

57,986.50

113,300.00
690.00
113,990.00
11,399.00
125,389.00

140,294.00

95,800.00
4,500.00

100,300.00
10,030.00
110,330.00

119,515.00

41,400.00
4,000.00

320.00
6,300.00
3,750.00
440.00
10,810.00
1,081.00
11,891.00

45,400.00
4,540.00
49,940.00

61,831.00

16,000.00
9,000.00
1,000.00
110.00
26,110.00
2,611.00
28,721.00

28,500.00
10,000.00
4,112.00
42,612.00
4,261.20
46,873.20

75,594.20

40,250.00
13,500.00
4,112.00
1,150.00
5,700.00
64,712.00
6,471.20
71,183.20

100,993.20

164,000.00
750.00
164,750.00
16,475.00
181,225.00

209,946.00

16,000.00
9,000.00
1,000.00
1,100.00
27,100.00
2,710.00
29,810.00
16,000.00
9,000.00
1,000.00
110.00
26,110.00
2,611.00
28,721.00

1
2
500.08 1 M' PASANG NOK ASBES GELOMBANG
1080 MM
Nok asbes gelombang
Paku sekrup 3,5"
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
500.09 1 M' PASANG TALANG DATAR SENG BJLS 30
Seng plat BJLS 30
Paku biasa 2"-5"
Kayu papan
Plink cut
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
500.10 1 M' PASANG TALANG MIRING SENG BJLS 30
Seng plat BJLS 30
Paku biasa 2"-5"
Kayu papan
Plink cut
Pekerja
Tukang kayu
Kepala tukang kayu
Pekerja
Total
Keuntungan Max
Total Harga
550.01 1 KG PEK. ERECTION KONST. KUDA-KUDA BESI
Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Operator alat besar
Pembantu operator
Alat bantu
Alat
Bahan bakar solar
Pelumas
Total
Keuntungan Max
Total Harga
550.02 1 KG PEK. KONST. BESI IWF/PROFIL EX LUAR
Pekerja
Tukang besi profil
Kepala Tukang besi profil
Mandor
Meni besi
Besi IWF Ex Jepang
Total
Keuntungan Max
Total Harga
550.03 1 KG PEK. KONST. BESI IWF/PROFIL EX DN/S.I.I
Pekerja
Tukang besi profil
Kepala Tukang besi profil
Mandor
Meni besi
Besi IWF Ex DN/SII
Total
Keuntungan Max
Total Harga
550.04 1 KG PEK. KONST. BESI SIKU/S.I.I
Pekerja
Tukang besi profil
Kepala Tukang besi profil
Mandor
Meni besi
Besi profil Ex DN/SII
Total
Keuntungan Max
Total Harga

Lb
Bh
Org
Org
Org
Org

Lb
Kg
M3
Kg
Org
Org
Org
Org

Lb
Kg
M3
Ltr
Org
Org
Org
Org

Org
Org
Org
Org
Org
Org
Ls
Ls
Lt
Lt

1.2000
6.0000
0.0840
0.1250
0.0130
0.0040

0.5000
0.0150
0.0096
0.2500
0.1500
0.4000
0.0250
0.0013

0.5000
0.0150
0.0190
0.3000
0.0400
0.4000
0.0250
0.0013

0.0010
0.0010
0.0002
0.0001
0.0002
0.0002
0.0002
0.0002
0.0100
0.0010

56,500.00
1,000.00
40,000.00
45,000.00
50,000.00
55,000.00

28,500.00
23,000.00
3,190,000.00
31,000.00
40,000.00
45,000.00
50,000.00
55,000.00

28,500.00
23,000.00
3,190,000.00
31,000.00
40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00
50,000.00
40,000.00
45,000.00
2,700,000.00
8,000.00
22,000.00

3,360.00
5,625.00
650.00
220.00
9,855.00
985.50
10,840.50

67,800.00
6,000.00

6,000.00
18,000.00
1,250.00
71.50
25,321.50
2,532.15
27,853.65

14,250.00
345.00
30,624.00
7,750.00

1,600.00
18,000.00
1,250.00
71.50
20,921.50
2,092.15
23,013.65

14,250.00
345.00
60,610.00
9,300.00

40.00
45.00
10.00
5.50
10.00
8.00
118.50
11.85
130.35

Org
Org
Org
Org
Kg
Kg

Org
Org
Org
Org
Kg
Kg

Org
Org
Org
Org
Kg
Kg

0.0600
0.0060
0.0060
0.0003
0.0800
1.1000

0.0600
0.0060
0.0060
0.0003
0.0800
1.1000

0.0600
0.0060
0.0060
0.0003
0.0800
1.1000

40,000.00
45,000.00
50,000.00
55,000.00
18,400.00
18,000.00

40,000.00
45,000.00
50,000.00
55,000.00
18,400.00
19,000.00

40,000.00
45,000.00
50,000.00
55,000.00
18,400.00
19,000.00

2,400.00
270.00
300.00
16.50
2,986.50
298.65
3,285.15
2,400.00
270.00
300.00
16.50
2,986.50
298.65
3,285.15
2,400.00
270.00
300.00
16.50
2,986.50
298.65
3,285.15

73,800.00
7,380.00
81,180.00

52,969.00
5,296.90
58,265.90

84,505.00
8,450.50
92,955.50

92,020.50

86,119.55

115,969.15

9.00
540.00
80.00
22.00
651.00
65.10
716.10

846.45

1,472.00
19,800.00
21,272.00
2,127.20
23,399.20

26,684.35

1,472.00
20,900.00
22,372.00
2,237.20
24,609.20

27,894.35

1,472.00
20,900.00
22,372.00
2,237.20
24,609.20

27,894.35

1
2
550.05 1 CM PENGELASAN DENGAN LAS LISTRIK
Tukang besi profil
Mandor
Kawat Las Listrik
Bahan Bakar Solar
Pelumas
Total
Keuntungan Max
Total Harga
550.06 1 TTK MELOBANG KONST BESI DENGAN BOR
Pekerja
Tukang besi profil
Mandor
Total
Keuntungan Max
Total Harga
600.01 1 M2 PENGECATAN DINDING DG METROLITE ( 3X)
Cat Tembok Metrolite
Plamour tembok
Rol cat
Steger werk
Hamplas
Pekerja
Tukang cat
Kep. tukang cat
Mandor
Total
Keuntungan Max
Total Harga
600.02 1 M2 PENGECATAN PLAFOND DG METROLITE ( 3X)
Cat Tembok Metrolite
Plamour tembok
Rol cat
Steger werk
Hamplas
Pekerja
Tukang cat
Kep. tukang cat
Mandor
Total
Keuntungan Max
Total Harga
600.03 1 M2 PENGECATAN DINDING DG VINILEX(3X)
Cat Tembok Vinilex
Plamour tembok
Rol cat
Steger werk
Hamplas
Pekerja
Tukang cat
Kep. tukang cat
Mandor
Total
Keuntungan Max
Total Harga
600.04 1 M2 PENGECATAN PLAFOND DG VINILEX(3X)
Cat Tembok Vinilex
Plamour tembok
Rol cat
Steger werk
Hamplas
Pekerja
Tukang cat
Kep. tukang cat
Mandor
Total
Keuntungan Max
Total Harga

3
Org
Org
Kg
LT
LT

4
0.0100
0.0010
0.1000
0.0300
0.0040

45,000.00
55,000.00
72,000.00
8,000.00
22,000.00

5
450.00
55.00
505.00
50.50
555.50

Org
Org
Org

Kg
Kg
Bh
Ls
Lbr
Org
Org
Org
Org

Kg
Kg
Bh
Ls
Lbr
Org
Org
Org
Org

Kg
Kg
Bh
Ls
Lbr
Org
Org
Org
Org

Kg
Kg
Bh
Ls
Lbr
Org
Org
Org
Org

0.0200
0.0200
0.0010

0.1750
0.1600
0.0100
1.0000
0.5000
0.1600
0.2800
0.0300
0.0100

0.2000
0.1600
0.0100
1.0000
0.5000
0.2000
0.3000
0.0300
0.0100

0.1750
0.1600
0.0100
1.0000
0.5000
0.1600
0.2800
0.0300
0.0100

0.2000
0.1600
0.0100
1.0000
0.5000
0.2000
0.3000
0.0300
0.0100

40,000.00
45,000.00
55,000.00

13,000.00
9,200.00
36,000.00
500.00
4,600.00
40,000.00
45,000.00
50,000.00
55,000.00

13,000.00
9,200.00
36,000.00
500.00
4,600.00
40,000.00
45,000.00
50,000.00
55,000.00

19,000.00
9,200.00
36,000.00
500.00
4,600.00
40,000.00
45,000.00
50,000.00
55,000.00

19,000.00
9,200.00
36,000.00
500.00
4,600.00
40,000.00
45,000.00
50,000.00
55,000.00

800.00
900.00
55.00
1,755.00
175.50
1,930.50

7,200.00
240.00
88.00
7,528.00
752.80
8,280.80

8,836.30

0.00
0.00
0.00

1,930.50

6,400.00
12,600.00
1,500.00
550.00
21,050.00
2,105.00
23,155.00

2,275.00
1,472.00
360.00
500.00
2,300.00
6,907.00
690.70
7,597.70

30,752.70

8,000.00
13,500.00
1,500.00
550.00
23,550.00
2,355.00
25,905.00

2,600.00
1,472.00
360.00
500.00
2,300.00
7,232.00
723.20
7,955.20

33,860.20

6,400.00
12,600.00
1,500.00
550.00
21,050.00
2,105.00
23,155.00

3,325.00
1,472.00
360.00
500.00
2,300.00
7,957.00
795.70
8,752.70

31,907.70

8,000.00
13,500.00
1,500.00
550.00
23,550.00
2,355.00
25,905.00

3,800.00
1,472.00
360.00
500.00
2,300.00
8,432.00
843.20
9,275.20

35,180.20

1
2
600.05 1 M2 PENGECATAN DINDING DG DULUX (ICI) (3X)
Cat Tembok Dulux (ICI)
Plamour tembok
Rol cat
Steger werk
Hamplas
Pekerja
Tukang cat
Kep. tukang cat
Mandor
Total
Keuntungan Max
Total Harga
600.06 1 M2 PENGECATAN PLAFOND DG DULUX (ICI) (3X)
Cat Tembok Dulux (ICI)
Plamour tembok
Rol cat
Steger werk
Amplas
Pekerja
Tukang cat
Kep. tukang cat
Mandor
Total
Keuntungan Max
Total Harga
600.07 1 M2 PENGECATAN KAYU (3X) BERIKUT MENI
Meni kayu
Plamour kayu
Cat kayu/besi Merk SEIV
Amplas kayu
Minyak cat terpentin
Kwas 3"
Pekerja
Tukang cat
Kep. Tukang Cat
Mandor
Total
Keuntungan Max
Total Harga
600.08 1 M2 CAT BESI (3X)
Meni besi
Cat dasar
Cat besi/kayu Merk SEIV
Amplas besi
Minyak cat thiner B
Kwas 3"
Pekerja
Tukang Cat
Kep. Tukang Cat
Mandor
Total
Keuntungan Max
Total Harga
600.09 1 M2 PLITURAN UNTUK MEUBELAIR
Dempul pelitur (dempul kasar)
Residu
Melamik
Oker putih
Oker coklat warna
Batu apung (gosok)
Sirlak ex India
Kwas 3"
Spirtus
Ampelas kayu
Pekerja
Tukang cat/pelitur
Kep. Tukang cat/pelitur
Mandor
Total
Keuntungan Max
Total Harga

3
Kg
Kg
Bh
Ls
Lbr
Org
Org
Org
Org

Kg
Kg
Bh
Ls
Lbr
Org
Org
Org
Org

Kg
Kg
Kg
Lbr
Ltr
Bh
Org
Org
Org
Org

Kg
Kg
Kg
Lbr
Ltr
Bh
Org
Org
Org
Org

Kg
Kg
Kg
Kg
Kg
Kg
Kg
bh
Ltr
Lbr
Org
Org
Org
Org

4
0.1750
0.1600
0.0100
1.0000
0.5000
0.1600
0.2800
0.0300
0.0100

0.2000
0.1600
0.0100
1.0000
0.5000
0.2000
0.3000
0.0300
0.0100

0.1670
0.0830
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100

0.1670
0.0830
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100

0.0300
0.2000
0.3500
0.0200
0.0100
0.1000
0.2000
0.0100
0.1000
0.2000
0.2500
0.2850
0.0400
0.0200

161,500.00
9,200.00
36,000.00
500.00
4,600.00
40,000.00
45,000.00
50,000.00
55,000.00

161,500.00
9,200.00
36,000.00
500.00
4,600.00
40,000.00
45,000.00
50,000.00
55,000.00

18,400.00
32,300.00
80,800.00
4,600.00
1,950.00
9,300.00
40,000.00
45,000.00
50,000.00
55,000.00

18,400.00
30,500.00
80,800.00
4,600.00
18,400.00
9,300.00
40,000.00
45,000.00
50,000.00
55,000.00

20,500.00
3,000.00
34,500.00
24,400.00
24,400.00
231,000.00
92,500.00
9,300.00
11,500.00
4,600.00
40,000.00
45,000.00
50,000.00
55,000.00

6,400.00
12,600.00
1,500.00
550.00
21,050.00
2,105.00
23,155.00

28,262.50
1,472.00
360.00
500.00
2,300.00
32,894.50
3,289.45
36,183.95

59,338.95

8,000.00
13,500.00
1,500.00
550.00
23,550.00
2,355.00
25,905.00

32,300.00
1,472.00
360.00
500.00
2,300.00
36,932.00
3,693.20
40,625.20

66,530.20

8,000.00
13,500.00
1,500.00
550.00
23,550.00
2,355.00
25,905.00

3,072.80
2,680.90
16,160.00
1,840.00
292.50
465.00
24,511.20
2,451.12
26,962.32

52,867.32

8,000.00
13,500.00
1,500.00
550.00
23,550.00
2,355.00
25,905.00

3,072.80
2,531.50
16,160.00
1,840.00
2,760.00
465.00
26,829.30
2,682.93
29,512.23

55,417.23

10,000.00
12,825.00
2,000.00
1,100.00
25,925.00
2,592.50
28,517.50

615.00
600.00
12,075.00
488.00
244.00
23,100.00
18,500.00
93.00
1,150.00
920.00
57,785.00
5,778.50
63,563.50

92,081.00

1
2
600.10 1 M2 PLITURAN BIASA
Dempul pelitur (dempul kasar)
Wood filer/residu
Oker putih
Oker coklat warna
Batu apung (gosok)
Sirlak ex India
Kwas
Spirtus
Ampelas kayu
Pekerja
Tukang Cat/Pelitur
Kep. Tukang Cat/Pelitur
Mandor
Total
Keuntungan Max
Total Harga
600.11 1 M2 MERESIDU KUDA-KUDA & RANGKA ATAP
Residu
Tukang cat
Kepala tukang cat
Mandor
Total
Keuntungan Max
Total Harga
650.01 1 BH PASANG KUNCI TANAM
Kunci tanam 2 slaag Standar
Tukang kayu
Total
Keuntungan Max
Total Harga
650.02 1 BH PASANG ENGSEL PINTU
Engsel pintu
Tukang kayu
Total
Keuntungan Max
Total Harga
650.03 1 BH PASANGAN GRENDEL
Gerendel
Tukang kayu
Total
Keuntungan Max
Total Harga
650.04 1 BH PASANG ENGSEL JENDELA
Engsel jendela
Tukang kayu
Total
Keuntungan Max
Total Harga
650.05 I BH PASANG KAIT ANGIN
Kait angin
Tukang kayu
Total
Keuntungan Max
Total Harga
650.06 1 M2 PASANG KACA POLOS TEBAL 3 MM
Kaca polos tebal 3 mm
Tukang kayu
Total
Keuntungan Max
Total Harga
650.07 1 M2 PASANG KACA POLOS TEBAL 5 MM
Kaca polos 5 mm
Tukang kayu
Total
Keuntungan Max
Total Harga
650.08 1 M2 PASANG KACA RAYBAND TEBAL 5 MM
Kaca rayband 5 mm
Tukang kayu
Total
Keuntungan Max
Total Harga

3
Kg
Kg
Kg
Kg
Kg
Kg
bh
Ltr
Lbr
Org
Org
Org
Org

Kg
Org
Org
Org

Bh
Org

Bh
Org

Bh
org

Bh
Org

Bh
Org

M2
Org

M2
Org

M2
Org

4
0.0300
0.2000
0.0200
0.0100
0.1000
0.2000
0.0100
0.1000
0.2000
0.2500
0.2850
0.0400
0.0200

0.3400
0.1450
0.0075
0.0025

1.0000
0.5000

1.0000
0.1500

1.0000
0.1500

1.0000
0.1000

1.0000
0.1000

1.1000
0.3000

1.1000
0.3000

1.1000
0.3000

20,500.00
3,000.00
24,400.00
24,400.00
231,000.00
92,500.00
9,300.00
11,500.00
4,600.00
40,000.00
45,000.00
50,000.00
55,000.00

3,000.00
45,000.00
50,000.00
55,000.00

167,000.00
45,000.00

14,400.00
45,000.00

15,000.00
45,000.00

10,000.00
45,000.00

9,200.00
45,000.00

86,500.00
45,000.00

115,500.00
45,000.00

138,500.00
45,000.00

10,000.00
12,825.00
2,000.00
1,100.00
25,925.00
2,592.50
28,517.50

615.00
600.00
488.00
244.00
23,100.00
18,500.00
93.00
1,150.00
920.00
45,710.00
4,571.00
50,281.00

78,798.50

1,020.00
1,020.00
102.00
1,122.00

6,525.00
375.00
137.50
7,037.50
703.75
7,741.25

8,863.25

22,500.00
22,500.00
2,250.00
24,750.00

167,000.00
167,000.00
16,700.00
183,700.00

208,450.00

6,750.00
6,750.00
675.00
7,425.00

14,400.00
14,400.00
1,440.00
15,840.00

23,265.00

6,750.00
6,750.00
675.00
7,425.00

15,000.00
15,000.00
1,500.00
16,500.00

23,925.00

4,500.00
4,500.00
450.00
4,950.00

10,000.00
10,000.00
1,000.00
11,000.00

15,950.00

4,500.00
4,500.00
450.00
4,950.00

9,200.00
9,200.00
920.00
10,120.00

15,070.00

13,500.00
13,500.00
1,350.00
14,850.00

95,150.00
95,150.00
9,515.00
104,665.00

119,515.00

13,500.00
13,500.00
1,350.00
14,850.00

127,050.00
127,050.00
12,705.00
139,755.00

154,605.00

13,500.00
13,500.00
1,350.00
14,850.00

152,350.00
152,350.00
15,235.00
167,585.00

182,435.00

1
2
650.09 1 M2 PASANG JENDELA NAKO
Jendela nako
Tukang kayu
Kepala tukang kayu
Total
Keuntungan Max
Total Harga
700.01 1 M1 SALURAN GREFEL BETON 1/2 DIA 20 CM +
PASANGAN
Galian tanah
Grefel beton dia 20 cm
Pas. bata + plesteran 1:3
Ongkos pasang grefel
Total
Keuntungan Max
Total Harga
700.02 1 M1 SALURAN GREFEL BETON 1/2 DIA 30 CM +
PASANGAN
Galian tanah
Grefel beton dia 30 cm
Pas. bata + plesteran 1:3
Ongkos pasang grefel
Total
Keuntungan Max
Total Harga
700.03 1 M2 PAS. PAVING BLOCK WARNA 6 CM
Paving block warna
Pasir beton
Peralatan
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
700.04 1 M2 PAS. PAVING BLOCK WARNA 8 CM
Paving block warna
Pasir beton
Peralatan
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
700.05 1 M2 PAS. PAVING BLOCK NATURAL 6 CM
Paving block natural
Pasir beton
Peralatan
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
700.06 1 M2 PAS. PAVING BLOCK NATURAL 8 CM
Paving block natural
Pasir beton
Peralatan
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
700.07 1 M' PAS. KANSTiN 15 X 25 X 50 CM
Galian tanah
Pondasi batu kali 1:4
Adukan 1:3
Kansten
Ongkos pasang kansten
Total
Keuntungan Max
Total Harga

3
M1
Org
Org

M3
Bh
M2
Ls

M3
Bh
M2
Ls

M2
M3
Ls
Org
Org
Org
Org

M2
M3
Ls
Org
Org
Org
Org

M2
M3
Ls
Org
Org
Org
Org

M2
M3
Ls
Org
Org
Org
Org

m3
m3
m2
bh
ls

4
1.0000
0.0400
0.0020

0.1500
1.0000
0.5000
1.0000

0.2000
1.0000
0.6000
1.0000

1.0100
0.1000
1.0000
0.2500
0.5000
0.0250
0.0030

1.0100
0.1000
1.2000
0.2500
0.5000
0.0250
0.0030

1.0100
0.1000
1.0000
0.2500
0.5000
0.0250
0.0030

1.0100
0.1000
1.2000
0.2500
0.5000
0.0250
0.0030

0.0900
0.0900
0.2250
2.0000
1.0000

231,000.00
45,000.00
50,000.00

20,570.00
34,000.00
118,589.00
7,900.00

20,570.00
51,000.00
118,589.00
8,680.00

113,400.00
165,000.00
850.00
40,000.00
45,000.00
50,000.00
55,000.00

192,500.00
165,000.00
850.00
40,000.00
45,000.00
50,000.00
55,000.00

83,100.00
165,000.00
850.00
40,000.00
45,000.00
50,000.00
55,000.00

93,500.00
165,000.00
850.00
40,000.00
45,000.00
50,000.00
55,000.00

20,570.00
517,155.00
41,281.35
9,500.00
4,500.00

1,800.00
100.00
1,900.00
190.00
2,090.00

231,000.00
231,000.00
23,100.00
254,100.00

256,190.00

7,900.00
7,900.00
790.00
8,690.00

3,085.50
34,000.00
59,294.50
96,380.00
9,638.00
106,018.00

114,708.00

8,680.00
8,680.00
868.00
9,548.00

4,114.00
51,000.00
71,153.40
126,267.40
12,626.74
138,894.14

148,442.14

10,000.00
22,500.00
1,250.00
165.00
33,915.00
3,391.50
37,306.50

114,534.00
16,500.00
850.00
131,884.00
13,188.40
145,072.40

182,378.90

10,000.00
22,500.00
1,250.00
165.00
33,915.00
3,391.50
37,306.50

194,425.00
16,500.00
1,020.00
211,945.00
21,194.50
233,139.50

270,446.00

10,000.00
22,500.00
1,250.00
165.00
33,915.00
3,391.50
37,306.50

83,931.00
16,500.00
850.00
101,281.00
10,128.10
111,409.10

148,715.60

10,000.00
22,500.00
1,250.00
165.00
33,915.00
3,391.50
37,306.50

94,435.00
16,500.00
1,020.00
111,955.00
11,195.50
123,150.50

160,457.00

1,851.30
46,543.95
9,288.30
0.00
4,500.00
62,183.55
6,218.36
68,401.91

19,000.00
19,000.00
1,900.00
20,900.00

89,301.91

1
2
700.08 1 M1 PEK. PAGAR DEPAN TRALIS STANDAR
Galian tanah
Urugan pasir 10 cm
Pasang Aanstamping
Pas. batu belah 1 pc : 4 psr
Plesteran dan acian 1 pc : 4 psr
Beton tulang
Pagar tralis
Pengecatan
Total
Keuntungan Max
Total Harga
700.09 1 M1 PEK. PAGAR BELAKANG/SAMPING
Galian tanah
Urugan pasir 10 cm
Pasang Aanstamping
Pas. batu belah 1 pc : 4 psr
Pas. bata + plesteran 1:4
Beton tulang
Besi siku 50/50/5
Kawat duri
Pengecatan tembok
Total
Keuntungan Max
Total Harga
750.01 MEMASANG 1 BH KLOSET JONGKOK PORSELINT
Kloset jongkok porselin
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
750.02 MEMBUAT 1 BH BAK MANDI BATU BATA VOL 0,3 M3
Batu bata
Sement porland
Pasir pasang
Porselint 11x11
Sement nat
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
750.03 MEMBUAT 1 BH BAK KONTROL BATU BATA
UK. 30X30 T = 35 CM
Batu bata
Sement pc
Pasir pasang
Kerikil
Besi beton
Pasir beton
Tukang batu
Kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga
750.04 MEMBUAT 1 BH BAK KONTROL BATU BATA
UK. 45X45 T = 5 CM
Batu bata
Semen pc
Pasir pasang
Kerikil
Besi beton
Pasir beton
Tukang batu
kepala tukang batu
Mandor
Total
Keuntungan Max
Total Harga

3
M3
M3
M3
M3
M2
M3
M2
M2

M3
M3
M3
M3
M2
M3
Kg
M1
M2

Bh
Org
Org
Org

bh
kg
M3
M2
Kg
Org
Org
Org

M3
Kg
M3
M3
Kg
M3
Org
Org
Org

M3
Kg
M3
M3
Kg
M3
Org
Org
Org

4
0.4500
0.0800
0.1200
0.3000
0.4100
0.0600
1.5000
1.0000

0.4500
0.0800
0.1200
0.3000
1.8000
0.0800
5.0000
5.0000
1.0000

1.0000
2.5000
0.1500
0.1600

280.0000
150.0000
0.3000
1.0000
6.0000
9.0000
0.3000
0.3000

0.1450
44.0000
0.0700
0.0700
1.6000
0.0600
1.3350
0.0015
0.0160

0.2500
77.0000
0.1300
0.0200
2.6000
0.0900
1.8930
0.0470
0.0710

20,570.00
115,750.00
244,965.00
517,155.00
35,135.50
1,353,563.66
80,000.00
50,379.30

20,570.00
115,750.00
244,965.00
517,155.00
116,196.00
1,353,563.66
3,250.00
86,500.00
27,957.00

173,000.00
45,000.00
50,000.00
55,000.00

460.00
1,250.00
128,500.00
43,800.00
1,700.00
45,000.00
50,000.00
55,000.00

120,000.00
1,250.00
128,500.00
165,000.00
12,000.00
165,000.00
45,000.00
50,000.00
55,000.00

120,000.00
1,250.00
128,500.00
60,000.00
12,000.00
165,000.00
45,000.00
50,000.00
55,000.00

0.00
0.00
0.00

9,256.50
9,260.00
29,395.80
155,146.50
14,405.56
81,213.82
120,000.00
50,379.30
469,057.47
46,905.75
515,963.22

515,963.22

0.00
0.00
0.00

9,256.50
9,260.00
29,395.80
155,146.50
209,152.80
108,285.09
16,250.00
432,500.00
27,957.00
997,203.69
99,720.37
1,096,924.06

1,096,924.06

112,500.00
7,500.00
8,800.00
128,800.00
12,880.00
141,680.00

173,000.00
173,000.00
17,300.00
190,300.00

331,980.00

405,000.00
15,000.00
16,500.00
436,500.00
43,650.00
480,150.00

128,800.00
187,500.00
38,550.00
43,800.00
10,200.00
408,850.00
40,885.00
449,735.00

929,885.00

60,075.00
75.00
880.00
61,030.00
6,103.00
67,133.00

17,400.00
55,000.00
8,995.00
11,550.00
19,200.00
9,900.00
122,045.00
12,204.50
134,249.50

201,382.50

85,185.00
2,350.00
3,905.00
91,440.00
9,144.00
100,584.00

30,000.00
96,250.00
16,705.00
1,200.00
31,200.00
14,850.00
190,205.00
19,020.50
209,225.50

309,809.50

1
2
750.05 1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA
Galian Tanah
Pasir Urug
Lantai Kerja
Pas. bata 1 PC : 2 PS + Plesteran
Plat Beton penutup + balok
Pipa PVC 4" jenis AW + Sambungan
Pipa GIP 1,5"
Galian Tanah untuk rembesan
Pas. injuk
Urugan Kerikil 3,5 cm
Pipa PVC 4" berlobang jenis AW
Urugan tanah perataan
Tambahan Upah
Total
Keuntungan Max
Total Harga
800.01 1 M3 MEMBONGKAR DINDING BATA
( Jika bongkaran dipakai lagi)
Pekerja
Mandor
Total
Keuntungan Max
Total Harga
800.02 1 M2 MEMBONGKAR PLESTERAN DINDING
Pekerja
Mandor
Total
Keuntungan Max
Total Harga
800.03 1 M2 MEMBONGKAR GENTENG/SIRAP
( Jika bongkaran dipakai)
Pekerja
Mandor
Total
Keuntungan Max
Total Harga
800.04 1 M3 MEMBONGKAR RANGKA ATAP/RENG KASO
(Jika bongkaran tidak dipakai)
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
800.05 1 M3 MEMBONGKAR RANGKA ATAP/
RENG KASO
(Jika bongkaran dipakai)
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
800.06 1 M3 MEMBONGKAR KUDA-KUDA,GORDING/
BALOK-BALOK
(Jika bongkaran dipakai)
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
800.07 1 M3 MEMBONGKAR KUDA-KUDA,GORDING/
BALOK-BALOK
(Jika bongkaran tidak dipakai)
Pekerja
Tukang kayu
Mandor
Total
Keuntungan Max
Total Harga

3
M3
M3
M3
M2
M3
M1
M1
M3
Kg
M3
M1
M3
LS

Org
Org

Org
Org

Org
Org

Org
Org
Org
Org

Org
Org
Org
Org

Org
Org
Org
Org

Org
Org
Org

4
7.5000
0.3570
0.3750
25.0000
0.5000
9.0000
2.0000
5.6250
9.0000
1.7500
6.0000
1.8750
1.0000

2.0000
0.0900

0.0500
0.0250

0.0400
0.0200

0.1000
0.0250
0.0025
0.0050

0.2000
0.0500
0.0050
0.0100

4.0000
6.0000
0.6000
0.2000

4.0000
3.0000
0.2000

20,570.00
86,000.00
625,520.50
142,177.50
292,100.00
42,000.00
23,750.00
26,840.00
11,500.00
60,000.00
32,000.00
97,850.00
150,000.00

40,000.00
55,000.00

40,000.00
55,000.00

40,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
55,000.00

5
150,000.00
150,000.00
15,000.00
165,000.00

154,275.00
30,702.00
234,570.19
3,554,437.50
146,050.00
378,000.00
47,500.00
150,975.00
103,500.00
105,000.00
192,000.00
183,468.75
5,280,478.44
528,047.84
5,808,526.28

80,000.00
4,950.00
84,950.00
8,495.00
93,445.00

2,000.00
1,375.00
3,375.00
337.50
3,712.50

1,600.00
1,100.00
2,700.00
270.00
2,970.00

4,000.00
1,125.00
125.00
275.00
5,525.00
552.50
6,077.50

8,000.00
2,250.00
250.00
550.00
11,050.00
1,105.00
12,155.00

160,000.00
270,000.00
30,000.00
11,000.00
471,000.00
47,100.00
518,100.00

160,000.00
135,000.00
11,000.00
306,000.00
30,600.00
336,600.00

5,973,526.28

0.00
0.00
0.00

93,445.00

0.00
0.00
0.00

3,712.50

0.00
0.00
0.00

2,970.00

0.00
0.00
0.00

6,077.50

0.00
0.00
0.00

12,155.00

0.00
0.00
0.00

518,100.00

0.00
0.00
0.00

336,600.00

1
2
800.08 1 M2 MEMBONGKAR PLAFOND
(Jika bongkaran di pakai)
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Total
Keuntungan Max
Total Harga
800.09 1 M2 MEMBONGKAR PLAFOND
(Jika bongkaran tidak dipakai)
Pekerja
Mandor
Total
Keuntungan Max
Total Harga

Org
Org
Org
Org

Org
Org

0.1000
0.2500
0.0025
0.0050

0.1250
0.0050

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
55,000.00

4,000.00
11,250.00
125.00
275.00
15,650.00
1,565.00
17,215.00

5,000.00
275.00
5,275.00
527.50
5,802.50

0.00
0.00
0.00

17,215.00

0.00
0.00
0.00

5,802.50

CARA MENGHITUNG HARGA SATUAN PEKERJAAN KONSTRUKSI BETON BERTULANG


1.
2.
3.
4.
5.
6.
7.
8.
9.

Hasil Analisa Pekerjaan Adukan Beton K.175


Hasil Analisa Pekerjaan Adukan Beton K. 225
Hasil Analisa Pekerjaan Adukan Beton Ready Mix K. 175
Hasil Analisa Pekerjaan Adukan Beton Ready Mix K. 225
Hasil Analisa Pekerjaan Besi Beton U.24
Hasil Analisa Pekerjaan Besi Beton U.39
Hasil Analisa Pekerjaan Bekisting papan
Hasil Analisa Pekerjaan Multiflex 9 mm
Hasil Analisa Pekerjaan Stoot Werk

----------------------------------------------------------------------------------------------------------------------

Analisa
Analisa
Analisa
Analisa
Analisa
Analisa
Analisa
Analisa
Analisa

350.04
350.04
350.06
350.07
350.08
350.09
350.01
350.02
350.03

890,384.00
943,723.00
1,024,364.00
1,077,703.00
15,569.40
16,174.40
116,242.50
114,416.78
292,264.50

/M3
/M3
/M3
/M3
/Kg
/Kg
/M2
/M2
/M2

A. GEDUNG BERTINGKAT
350.10

MENGHITUNG HARGA SATUAN KOLOM 30 X 30 CM' PAKAI U.24


MUTU BETON K. 175 DENGAN BERAT BESI BETON 200 Kg/M3
- Adukan Beton (Site Mix K.175)

= Rp.

890,384.00 /M3

- Bekisting papan -------------- ( 1 M3 : 0,3 x 0,3 ) ( 0,3 x 4 )

x Rp.

116,242.50

= Rp.

1,549,745.01 /M3

- Besi beton U.39 : --------------------------------- 200 Kg/M3

x Rp.

16,174.40

= Rp.

3,234,880.00 /M3

= Rp.

5,675,009.01 /M3

= Rp.

890,384.00 /M3

JUMLAH HARGA SATUAN KOLOM BETON 30X30 DENGAN BESI 200 Kg/m3
350.11 MENGHITUNG HARGA SATUAN-SATUAN PLAT BETON TEBAL 12 CM'
PAKAI BESI U.39 MUTU BETON K.175 DENGAN BERAT 110 Kg/M3
- Adukan Beton (Site Mix K.175)
- Bekisting papan ----------------------------------- ( 1 : 0,12 )

x Rp.

116,242.50

= Rp.

968,687.50 /M3

- Besi beton U.39 : --------------------------------- 110 Kg/M3

x Rp.

16,174.40

= Rp.

1,779,184.00 /M3

- Stut Werk ---------------------------------------------- ( 1 : 012 )

x Rp.

292,264.50

= Rp.

2,435,537.50 /M3

= Rp.

6,073,793.00 /M3

= Rp.

890,384.00 /M3

JUMLAH HARGA SATUAN PLAT BETON T.20 CM K.175 - 110 Kg/M3


350.12 MENGHITUNG HARGA SATUAN-SATUAN BALOK PORTAL 40X70 CM'
MUTU BETON K.175 DENGAN BERAT BESI BETON U.24 - 200 Kg/M3
- Adukan Beton (Site Mix K.175)
- Bekisting papan ( 1 : 0,40 : 0,70 ) ( 0,70 + 0,70 + 0,40)

x Rp.

116,242.50

= Rp.

746,974.31 /M3

- Besi beton U.39 : --------------------------------- 200 Kg/M3

x Rp.

16,174.40

= Rp.

3,234,880.00 /M3

- Stut Werk ---------------------------- ( 1 : 0,40 x 0,70 ) x 0,40

x Rp.

292,264.50

= Rp.

417,353.71 /M3

= Rp.

5,289,592.01 /M3

= Rp.

890,384.00 /M3

JUMLAH HARGA SATUAN BALOK PORTAL 40X70 CM K.175 - 200 Kg/M3


350.13 MENGHITUNG HARGA SATUAN SATUAN SLOOF BETON BERTULANG
25X30 CM MUTU BETON K.175 DGN BERAT BESI BETON U.24 175 Kg/M3
- Adukan Beton (Site Mix K.175)
- Bekisting papan ------------- ( 1 : 0,25 : 0,30 ) ( 0,30 X2)

x Rp.

116,242.50

= Rp.

929,940.00 /M3

- Besi beton U.39 : --------------------------------- 200 Kg/M3

x Rp.

16,174.40

= Rp.

3,234,880.00 /M3

= Rp.

5,055,204.00 /M3

= Rp.

890,384.00 /M3

JUMLAH HARGA SATUAN BALOK PORTAL 40X70 CM K.175 - 200 Kg/M3


350.14 MENGHITUNG HARGA SATUAN SATUAN POOR BETON BERTULANG
0,40X1,00X1.00 MUTU BETON K.175 DGN BERAT BESI BETON U.24 175 Kg/M3
- Adukan Beton (Site Mix K.175)
- Bekisting papan ------------------ ( 1 : 0,4 x 1 ) ( 0,40 x4)

x Rp.

116,242.50

= Rp.

464,970.00 /M3

- Besi beton U.24 : --------------------------------- 175 Kg/M3

x Rp.

16,174.40

= Rp.

2,830,520.00 /M3

= Rp.

4,185,874.00 /M3

JUMLAH HARGA SATUAN BALOK PORTAL 40X70 CM K.175 - 200 Kg/M3

B. GEDUNG TIDAK BERTINGKAT


350.15

MENGHITUNG HARGA SATUAN KOLOM 15 X 20 CM' PAKAI U.24


MUTU BETON K. 175 DENGAN BERAT BESI BETON 150 Kg/M3
- Adukan Beton (Site Mix K.175)

= Rp.

890,384.00 /M3

- Bekisting papan ------- ( 1:0,15x0,2) (0,15x2+0,2x2)

x Rp.

116,242.50

= Rp.

2,711,937.53 /M3

- Besi beton U.24 : --------------------------------- 150 Kg/M3

x Rp.

15,569.40

= Rp.

2,335,410.00 /M3

= Rp.

5,937,731.53 /M3

JUMLAH HARGA SATUAN KOLOM BETON 15X20 DENGAN BESI 150 Kg/m3
350.16 MENGHITUNG HARGA SATUAN RINGBALK 15X20 CM' (Exposed)
MUTU BETON K.175 DENGAN BERAT BESI BETON U.24 - 150 Kg/M3
- Adukan Beton (Site Mix K.175)

= Rp.

890,384.00 /M3

116,242.50

= Rp.

2,130,725.03 /M3

x Rp.

15,569.40

= Rp.

2,335,410.00 /M3

x Rp.

292,264.50

= Rp.

438,396.75 /M3

= Rp.

5,794,915.78 /M3

- Bekisting papan --------------------- (1:0,15:0,20) (0,15+0,20+0,20)

x Rp.

- Besi beton U.24 : --------------------------------- 150 Kg/M3


- Stut Werk ---------------------------------------------- ( 1X10X0,15)
JUMLAH HARGA SATUAN RINGBALK 15X20 CM K.175 - 150 Kg/M3
350.17 MENGHITUNG HARGA SATUAN BALOK SELASAR 10X25 CM (Exposed)
MUTU BETON K.175 DENGAN BERAT BESI BETON U.24 - 150 Kg/M3
- Adukan Beton (Site Mix K.175)

= Rp.

890,384.00 /M3

116,242.50

= Rp.

2,789,820.00 /M3

x Rp.

15,569.40

= Rp.

2,335,410.00 /M3

x Rp.

292,264.50

= Rp.

292,264.50 /M3

= Rp.

6,307,878.50 /M3

- Bekisting papan ( 1 : 0,10 : 0,25 ) ( 0,10 + 0,25 + 0,25)

x Rp.

- Besi beton U.24 : --------------------------------- 150 Kg/M3


- Stut Werk ---------------------------- ( 1 x 10 x 0,10 )

JUMLAH HARGA SATUAN BALOK SELASAR10X25 CM K.175 - 150 Kg/M3


350.18 MENGHITUNG HARGA SATUAN SATUAN SLOOF UTAMA DAN RINGBALK
MUTU BETON K.175 DGN BERAT BESI BETON U.24 175 Kg/M3
- Adukan Beton (Site Mix K.175)

= Rp.

890,384.00 /M3

- Bekisting papan ------------- ( 1 : 0,15 : 0,20 ) ( 0,20 X2)

x Rp.

116,242.50

= Rp.

1,549,512.53 /M3

- Besi beton U.24 : --------------------------------- 150 Kg/M3

x Rp.

15,569.40

= Rp.

2,335,410.00 /M3

= Rp.

4,775,306.53 /M3

JUMLAH HARGA SATUAN SLOOF, KOLOM DAN RINGBALK 15/20 CM K 175 - 150 Kg/M3

DAFTAR HARGA SATUAN UNTUK PEKERJAAN GEDUNG


TAHUN ANGGARAN 2011

NO

KODE

URAIAN PEKERJAAN

HARGA SATUAN
Rp

1
2
3
4
5

100.01
100.02
100.03
100.04
100.05

1 m1
1 m2
1 m2
1 m2
1 m1

Pek. Pengukuran dan pemasangan bouwplank


Pek. Kantor Direksikeet
Los Kerja/Gudang
Papan Nama Proyek
Pagar Pengaman Proyek

61,209.50
505,010.00
522,802.50
454,162.50
254,628.00

6
7
8
9
10
11
12
13
14

150.01
150.02
150.03
150.04
150.05
150.06
150.07
150.08
150.09

1 m2
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3

Pek. Perataan Tanah


Pek. Galian Tanah Biasa Kedalaman 1 m'
Pek. Galian Tanah Kedalaman 2 m'
Pek. Galian Tanah Sumuran Max Kedalaman 5 m'
Galian Tanah Berbatu Maksimum Kedalaman 1 m'
Urugan Kembali Pondasi Dihitung 1/4 dari Galian
Pemadatan tanah (tiap 20 cm) tanah dari luar
Urugan Pakai Alat Besar Tanah Dari Luar Dipadatkan (500m3)
Urugan Pasir Urug

2,552.00
20,570.00
26,840.00
59,339.50
32,351.00
10,147.50
107,635.00
131,593.39
127,325.00

15
16
17
18
19
20
21

200.01
200.02
200.03
200.04
200.05
200.06
200.07

1m3
1m3
1m3
1m3
1m3
1m2
1m3

Lantai Kerja 1 Pc:3Ps:5Krl


Pas. Beton Cycloff + 40% Batu Kali
Pas. Batu Kosong
Pas. Batu Kali 1:3
Pas. Batu Kali 1:4
Pas. Batu kali 1:4 Pakai Muka Batu Segi Enam + Siaran
Pas. Batu Tempel + Siaran

625,520.50
602,618.50
269,461.50
617,548.25
568,870.50
754,429.50
216,984.35

22
23
24
25
26
27

250.01
250.02
250.03
250.04
250.05
250.06

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2

Pas. Bata Merah 1:2


Pas. Bata merah 1:4
Plesteran Dinding 1:2
Plesteran Dinding 1:3
Plesteran Dinding 1:4
Plesteran Dinding 1:5

110,752.95
89,166.55
45,642.30
41,281.35
38,649.05
36,737.80

28
29
30
31
32
33

300.01
300.02
300.03
300.04
300.05
300.06

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2

Dinding Keramik DN Putih KW II


Lantai Keramik DN Putih KW II
Dinding Keramik Bercorak/Berwarna KW II
Lantai Keramik 20/20 DN Bercorak/Berwarna KW II KM/WC
Lantai Keramik DN Bercorak/Berwarna KW II
Pas. lantai ubin PC abu-abu uk.20x20 cm

110,932.80
130,440.20
116,487.80
135,995.20
135,995.20
82,953.75

34
35
36
37
38
39
40
41
42
43

350.01
350.02
350.03
350.04
350.05
350.06
350.07
350.08
350.09
350.10

1 m2
1 m2
1 m2
1m3
1m3
1m3
1m3
1 Kg
1 Kg
1m3

Bekisting Dengan Papan


Bekisting Multiplek 9 mm
Pas. Stoot Werk
Cor Beton Site Mix K.175
Cor Beton Site Mix K. 225
Cor Beton K.175 (Readmix) Minimum 6 m3
Cor Beton K.225 (Readmix)
Beton Terpasang U. 24
Besi Beton Terpasang U. 39
Membuat kolom beton bertulang 200kg besi + bekisting

116,242.50
114,416.78
292,264.50
890,384.00
943,723.00
1,024,364.00
1,077,703.00
15,569.40
16,174.40
5,675,009.01

HARGA SATUAN
Rp

NO

KODE

URAIAN PEKERJAAN

1
44
45
46
47
48
49
50
51

2
350.11
350.12
350.13
350.14
350.15
350.16
350.17
350.18

1m3
1m3
1m3
1m3
1m3
1m3
1m3
1m3

3
Membuat plat beton bertulang 110Kg besi + bekisting
Membuat balok beton bertulang 200 Kg besi + bekisting
Membuat sloof/ringbalk beton bertulang 175 Kg besi+bekisting
Membuat pondasi/poor beton bertulang 175 Kg besi + bekisting
Membuat kolom beton 15x20 beton bertulang 150 Kg besi + bekisting
Membuat Ringbalk 15x20 beton bertulang 175 Kg besi + bekisting
Membuat Balok selasar 10x25 cm beton bertulang 175 Kg besi + bekisting
Membuat sloof, kolom utama dan ringbalk 15/20 cm K.175 Kg besi + bekisting

4
6,073,793.00
5,289,592.01
5,055,204.00
4,185,874.00
5,937,731.53
5,794,915.78
6,307,878.50
4,775,306.53

52
53
54
55
56
57
58

400.01
400.02
400.03
400.04
400.04a
400.06
400.07

1 m3
1 m3
1 m2
1 m2
1 m2
1 m1
1 m1

Pasang konstruksi kuda - kuda kayu klas II


Kuda - Kuda Overstek/Konsol Kayu Klas II
Rangka Atap Genteng Beton/Keramik
Pek. Rangka atap Genteng Plentong
Pek. Rangka atap Genteng Plentong menggunakan Besi Hollow
Pekerjaan Lisplank Kayu klas II 3/20
Pekerjaan Lisplank Kayu klas II 3/30

4,725,160.00
5,076,060.00
63,388.16
56,370.16
111,245.20
42,039.80
56,914.00

59
60
61

400.08
400.09
400.10

62
63
64
65
66
67
68
69

400.11
400.12
400.13
400.14
400.15
400.16
400.17
400.18

1 m3
1 m3
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2

Kusen Kayu Klas II


Kusen Kayu Klas I
Daun Pintu Panil Kayu klas II
Daun Pintu Panil Triplek Kayu klas II
Daun Pintu Double Teakwood
Daun Pintu Panil Teakwood
Daun Pintu Teakwood Lapis Almunium (U/KM/WC)
Daun Pintu Teakwood Lapis Formika (U/KM/WC)
Daun Jendela Kaca (Tanpa Kaca )
Daun Pintu Kaca (Tanpa Kaca)
Daun Pintu Jendela Jalusi
Jalusi mati pada kusen

5,493,950.00
6,618,590.00
336,985.00
334,911.54
385,851.40
492,525.00
439,806.40
551,621.40
261,965.00
281,022.50
483,186.00
365,997.50

70
71
72
73
74
75
76
77
78
79
80

450.01
450.02
450.03
450.04
450.05
450.06
450.07
450.08
450.09
450.10
450.10

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2

Pas. Plafond Triplex 4 mm Berikut rangka kayu terentang


Pas. Plafond Triplex 4 mm Berikut rangka kayu klas II
Pas. Plafond Triplek 6 mm Berikut rangka kayu terentang
Pas. Plafond Triplek 6 mm Berikut rangka kayu klas II
Pas. Plafond Asbes 4 mm Berikut rangka kayu klas II
Pas. Rangka Plafond kayu terntang
Pas. Bahan Plafond Triplek4 mm pada rangkanya
Pas. Bahan Plafond Eternit 4 mm pada rangkanya
Pas. Bahan Palfond Asbes Semen 4 mm pada rangkanya
Pas. Bahan Plafond Acustik pada rangkanya
Pas. Plafond Gypsum rangka Besi Hollow

81
82
83
84
85
86
87
88
89
90

500.01
500.02
500.03
500.04
500.05
500.06
500.07
500.08
500.09
500.10

1m2
1m2
1m2
1m2
1 m'
1 m'
1 m'
1 m'
1 m'
1 m'

Pek. Atap genteng plentong Ex Jatiwangi


Pek. Atap genteng beton
Pek. Atap genteng metal
Pek. Atap asbes Gelombang 80x180x4 m
Pek. Bubungan Atap Genteng plentong Ex Jatiwangi
Pek. Bubungan Atap Genteng Beton
Pek. Bubungan Atap Genteng Metal
Pek. Bubungan Asbes Gelombang 1080 mm
Pasang talang Datar Seng BJLS 30
Pasang Talang Miring Seng BJLS 30

178,649.90

89,324.95
99,488.95
103,447.85
96,066.85
147,130.50
46,051.50
35,477.20
20,363.75
41,855.76
32,356.50
118,739.50
57,986.50
140,294.00
119,515.00
61,831.00
75,594.20
100,993.20
209,946.00
92,020.50
86,119.55
115,969.15

NO

KODE

URAIAN PEKERJAAN

HARGA SATUAN
Rp

91
92
93
94
95
96

550.01
550.02
550.03
550.04
550.05
550.06

1Kg
1Kg
1Kg
1Kg
1Cm
1 ttk

Pek Erection Konst. Kuda-Kuda Besi


Pek. Konst. Besi IWF/Profil Ex Luar
Pek. Konst. Besi IWF/Profil Ex DN /S I I
Pek. Konst. Besi Siku / S I I
Pengelasan Dengan Las Listrik
Melobang Konst. Besi Dengan Cor

97
98
99
100
101
102
103
104
105
106
107

600.01
600.02
600.03
600.04
600.05
600.06
600.07
600.08
600.09
600.10
600.11

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2

Pengecatan Dinding Dg Mertolite (3x)


Pengecatan Plafond Dg Metrolite (3x)
Pengecatan Dinding Dg Vinilex (3x)
Pengecatan Plafond Dg Vinilex (3x)
Pengecatan Dinding Dg Dulux (3x)
Pengecatan Plafond Dg Dulux (3x)
Pengecatan Kayu (3x) Berikut Meni
Cat Besi (3x)
Plituran Untuk Meubelair
Plituran Biasa
Meresidu kuda-kuda dan rangka atap

108
109
110
111
112
113
114
115
116

650.01
650.02
650.03
650.04
650.05
650.06
650.07
650.08
650.09

1 Bh
1 Bh
1 Bh
1 Bh
1 Bh
1 m2
1 m2
1 m2
1 m2

Pasang Kunci Tanam Double Slaag


Pasang Engsel Pintu
Pasangan Grendel
Pasang Engsel Jendela
Pasang Kait Angin
Pasang Kaca Polos Tebal 3 mm
Pasang Kaca Polos Tebal 5 mm
Pasang Kaca Warna Tebal 5 mm
Pasang Jendela Kaca Naco Dan Teralis

117
118
119
120
121
122
123
124
125

700.01
700.02
700.03
700.04
700.05
700.06
700.07
700.08
700.09

1 m1
1 m1
1 m2
1 m2
1 m2
1 m2
1 m'
1 m1
1 m1

Saluran Grefel Beton 1/2 dia 20 cm + Pasangan


Saluran Grefel Beton 1/2 dia 30 cm + Pasangan
Pas. Paving Block Warna 6 Cm
Pas. Paving Block Warna 8 Cm
Pas. Paving Block Natural 6 Cm
Pas. Paving Block Natural 8 Cm
Pas. Kasteen 15x25x50 cm
Pek. Pagar Depan Tralis Standar
Pek. Pagar Belakang / Samping

114,708.00
148,442.14
182,378.90
270,446.00
148,715.60
160,457.00
89,301.91
515,963.22
1,096,924.06

126
127
128
129
130

750.01
750.02
750.03
750.04
750.05

1 Bh
1 Bh
1 Bh
1 Bh
1 Unit

Memasang 1 Bh Kloset Jongkok Porselint


Membuat 1 Bh Bak Mandi Batu Bata Vol 0,3 m3
Membuat 1 Bh Bak Kontrol Batu Bata Uk. 30x30 T = 35 Cm
Membuat 1 Bh Bak Kontrol Batu Bata Uk. 45x40 T= 5 cm
Septictank 2,5 x 1,5 x 2 m + Rembesannya

331,980.00
929,885.00
201,382.50
309,809.50
5,973,526.28

131
132
133
134
135
136

800.01
800.02
800.03
800.04
800.05
800.06

1 m3
1 m2
1 m2
1 m3
1 m3
1 m3

Membongkar Dinding Bata (jika bongkaran dipakai lagi)


Membongkar Plesteran Dinding
Membongkar Genteng Sirap ( jika bongkaran dipakai)
Membongkar rangka Atap / Reng Kaso (jika bongkaran tidak dipakai)
Membongkar Rangka Atap /Reng Kaso (jika bongkaran dipakai)
Membongkar Kuda-Kuda, Gording /Balok-Balok (jika bongkaran dipakai)

846.45
26,684.35
27,894.35
27,894.35
8,836.30
1,930.50
20,501.80 2x
22,573.47 2x

30,752.70
33,860.20
31,907.70
35,180.20
59,338.95
66,530.20
52,867.32
55,417.23
92,081.00
78,798.50
8,863.25
208,450.00
23,265.00
23,925.00
15,950.00
15,070.00
119,515.00
154,605.00
182,435.00
256,190.00

93,445.00
3,712.50
2,970.00
6,077.50
12,155.00
518,100.00

NO

KODE

1
137
138
139

2
800.07
800.08
800.09

URAIAN PEKERJAAN
3
1 m3 Membongkar Kuda-Kuda, Gording /Balok-Balok (jika bongkaran tidak dipakai)
1 m2 Membongkar Plafond (jika bongkaran dipakai)
1 m2 Membongkar Plafond (jika bongkaran tidak dipakai)

HARGA SATUAN
Rp
4
336,600.00
17,215.00
5,802.50

DAFTAR HARGA SATUAN UPAH DAN BAHAN


TAHUN ANGGARAN 2011
I. DAFTAR HARGA SATUAN UPAH
NO

URAIAN PEKERJA

SATUAN

HARGA UPAH
Rp
3

1 Pekerja
2 Tukang Batu

Org/hr/8 jam
Org/hr/8 jam

40,000.00
45,000.00

3
4
5
6
7

Kepala Tukang Batu


Tukang Kayu
Kepala Tukang Kayu
Tukang Cat/Pelitur
Kepala Tukang Cat/Pelitur

Org/hr/8 jam
Org/hr/8 jam
Org/hr/8 jam
Org/hr/8 jam
Org/hr/8 jam

50,000.00
45,000.00
50,000.00
45,000.00
50,000.00

8
9
10
11

Tukang Besi Beton


Kepala Tukang Besi Beton
Tukang Besi Profil
Kepala Tukang Besi Profil

Org/hr/8 jam
Org/hr/8 jam
Org/hr/8 jam
Org/hr/8 jam

45,000.00
50,000.00
45,000.00
50,000.00

12 M a n d o r
13 Operator Alat Besar

Org/hr/8 jam
Org/hr/8 jam

55,000.00
50,000.00

14 Pemb. Operator
15 Supir Truk
16 Kenek Truk

Org/hr/8 jam
Org/hr/8 jam
Org/hr/8 jam

40,000.00
50,000.00
40,000.00

17 Penjaga Malam

Org/hr/8 jam

40,000.00

Serang,

2011

II. DAFTAR HARGA SATUAN BAHAN MATERIAL


NO
1
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

JENIS BAHAN

SAT

HARGA BAHAN
Rp

2
3
BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN MATERIAL LAINNYA
Tanah urug
m3
material Pilihan
m3
Pasir urug
m3
Sirtu
m3
Kerikil Sungai Tersaring
m3
Base Coarse
m3
Sirdam
m3
Pasir Teras
m3
Pasir pasang kali
m3
Pasir beton
m3
Pasir Beton (Jalupang)
m3
Abu batu 0 - 0,5
m3
Batu gosok (apung)
Kg
Screening 0,5 - 1
m3
Batu pecah mesin 1/2
m3
Batu pecah mesin 2/3
m3
Batu pecah mesin 3/5
m3
Batu pecah mesin 5/7
m3
Batu pecah mesin 7/10
m3
Batu belah 10/15
m3
Batu Bronjong (untuk Bronjong)
m3
Batu koral beton kali
m3
Batu tempel hitam
m2
Kansteen Paving Block
m'
Kansteen 60x30 cm
bh
Kansteen 60x42 cm
bh
Batu telor
m3
Batu Quary
m3
Batako kecil 8x10x20
bh
Batako besar 8x10x30
bh
Con blok 8x10x40
bh
Bata merah bakar kelas I
bh
Bata merah bakar kelas II
bh
Bata merah oven (klingker)
bh
Roster beton 20x20
bh
Roster beton 30x30
bh
Grass block 20x20 cm
bh
Grass block 30x30 cm
bh
Paving blok natural 8 cm cetak mesin
m2
Paving blok natural 8 cm cetak tangan
m2
Paving blok warna 8 cm cetak mesin
m2
Paving blok natural 6 cm cetak mesin
m2
Paving blok natural 6 cm cetak tangan
m2
Paving blok warna 6 cm cetak mesin
m2
Paving blok warna 6 cm cetak tangan
m2
Semen PC
Kg
Semen putih
Kg
Semen warna
Kg
Semen merah (bubuk bata)
m3
Readmix beton K.300 (Prince list)
m3
Readmix beton K.225 (Prince list)
m3

4
71,500.00
119,700.00
86,000.00
98,000.00
82,500.00
94,050.00
77,000.00
98,000.00
128,500.00
165,000.00
190,000.00
165,000.00
231,000.00
92,400.00
146,500.00
163,000.00
146,500.00
146,500.00
96,250.00
138,600.00
179,000.00
165,000.00
143,000.00
26,500.00
24,200.00
30,250.00
98,000.00
71,500.00
2,000.00
3,350.00
4,600.00
570.00
460.00
1,500.00
6,700.00
6,900.00
5,000.00
7,000.00
93,500.00
49,500.00
192,500.00
83,100.00
42,350.00
113,400.00
49,500.00
1,250.00
1,700.00
5,700.00
52,000.00
929,000.00
924,000.00

2
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74

B.
1
2
3
4
5
6

Readmix beton K.175 (Prince list)


Kapur pasang / kapur tembok
Kapur sirih
Kapur Bakar
Tanah liat
Pipa Beton Bertulang 600 mm
Pipa Beton Bertulang 800 mm
Pipa Beton Bertulang 1000 mm
Besi Pipa Galvanis 2.0"
Besi Pipa Galvanis 2.5"
Besi Pipa Galvanis 3.0"
Aspal Bitumen
LASTON (AC - BC)
LASTON (ATB-L/AC-L)
LASTON (AC - WC)
LATASTON (HRS-WC)
Material Agregat Kasar A
Material Agregat Kasar B
Material Agregat Kasar C
Klem
Gebalan Rumput
Patok (Kilometer)
Patok (Hektameter)

3
m3
m3
kg
m3
Kg

Btg
Btg
Btg
Kg
Ton
Ton
Ton
Ton
m3
m3
m3
Bh
Bh
Bh
Bh

4
881,340.00
103,950.00
5,700.00
275,000.00
4,600.00
385,000.00
522,500.00
632,500.00
176,000.00
330,000.00
500,500.00
7,700.00
1,028,000.00
1,140,150.00
1,056,000.00
1,138,500.00
103,400.00
99,000.00
96,250.00
4,950.00
2,750.00
165,000.00
74,250.00

BAHAN FINISHING : LABURAN,PENGISI DAN ALATNYA


Plamir tembok
Cat tembok metrolite
Cat tembok ICI Exs.
Cat tembok Vinilex
Cat tembok Sanlex
Cat tahan asam

kg
kg
kg
kg
kg
kg

9,200.00
13,000.00
161,700.00
19,000.00
15,450.00
59,000.00

1
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

2
Cat dasar ICI
Cat marka / spotlight
Water profing emulsion
Water profing membrance
Rool cat tembok
Kape tembok
Kape kayu
Solignum 1 blek
Plincote
Pengawetan kayu
Pengopenan kayu
Kuwas 3"
Oker
Oyan
Otem (pewarna plitur)
Spirtus
Bahan plitur (sirlak) India
Dempul lilin
Dempul plitur
Dempul halus / imfra
Residu
Terpentin
Tiner A
Tiner B
Kumpon
Melamik
Dempul plastik
Dempul duco
Amplas
Dempul kayu (cap kucing)
Meni kayu/besi
Sincromate
Cat kayu sive
Cat besi sive
Cat besi duco danaglos / ICI
Cat bronze
Cat tembok ICI Int.
Pelapis alkali ICI
Cat kayu Avian / Glotex / Romatex
Plamir kayu Kansai

3
ltr
kg
kg
ml
bh
bh
bh
ltr
kg
m3
m3
bh
kg
bks
bks
lt
kg
kg
kg
kg
kg
Lt
Lt
Lt
kg
Kg
kg
kg
lbr
kg
Kg
kg
Kg
Kg
kg
kg
ltr
ltr
kg
kg

BAHAN KAYU BERIKUT BAHAN JADINYA


Bambu dia. 5 s/d 7
Bambu dia. 7 s/d 10
Bambu gambong
Kayu terentang / Albasia
Kayu balok borneo super (kls. II)
Kayu balok kamper medan (kruing)
Kayu papan kamper medan (kruing)
Kayu balok kamper banjar
Kayu papan kamper banjar
Kayu balok kamper samarinda
Kayu papan kamper samarinda
Kayu balok rasamala
Kayu jati Jatim tua lepas mata
Kayu jati Jateng tua lepas mata

btg
btg
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

4
8,000.00
48,500.00
11,000.00
5,200.00
36,000.00
8,000.00
9,000.00
31,000.00
31,000.00
693,000.00
404,000.00
9,300.00
24,400.00
1,150.00
1,150.00
11,500.00
92,500.00
33,500.00
26,000.00
25,400.00
28,000.00
1,950.00
17,000.00
23,000.00
8,000.00
34,500.00
28,500.00
34,500.00
4,600.00
20,500.00
18,400.00
51,000.00
35,800.00
80,800.00
83,000.00
75,000.00
161,500.00
40,500.00
36,850.00
32,300.00

21,500.00
26,500.00
28,800.00
2,420,000.00
3,190,000.00
3,234,000.00
3,465,000.00
3,349,000.00
3,580,000.00
3,465,000.00
4,065,000.00
2,887,000.00
9,240,000.00
11,000,000.00

2
15 Kayu jati Jabar tua

3
m3

4
6,930,000.00

2
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

D.
1
2
3
4
5
6
7
E.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
F.

Kayu hutan klas I


Kayu hutan klas II
Dolken 5 - 7 : L = 3 mm
Dolken 7 - 10 : L = 3 mm
Dolken 15 : L = 3 mm
Papan 3.5x20x400 mm
Papan Bekisting
Lis Propil Kamper 1 cm
Lis Propil Kamper 2 cm
Lis Propil Kamper 4 cm
Lis Propil Kamper 5 cm
Lis Propil Kamper 10 cm
Pegangan tangga profil jati
Pegangan tangga profil kamper
Kayu reng 2/3 borneo super
Kayu reng 2/3 kamper banjar
Kayu reng 3/4 kamper banjar

3
m3
m3
bt
bt
bt
Lbr
m3
m'
m'
m'
m'
m'
m'
m'
m3
m3
m3

4
4,042,000.00
2,310,000.00
22,000.00
29,700.00
38,500.00
85,800.00
3,300,000.00
27,500.00
4,400.00
9,250.00
13,500.00
27,700.00
150,000.00
63,000.00
3,175,000.00
3,349,500.00
3,349,500.00

BAHAN PENUTUP RANGKA PLAFOND


Bahan Plafond Eternit 4 mm
Bahan Plafond hardpleks 5 mm 120 x 240
Bahan Plafond Asbes Semen 4 mm
Gypsum 120x240 t= 9 mm ex.DN
Gypsum 120x240 t= 9 mm ex.luar
Acustik amstrong 60x120
GRC board

m2
lbr
m2
lbr
lbr
lbr
lbr

13,500.00
110,000.00
28,800.00
86,500.00
98,100.00
13,800.00

BAHAN KAYU LAPIS


Triplek 3 mm 120x240
Triplek 4 mm 120x240
Triplek 4 mm ukuran pintu
Triplek 6 mm 120x240
Triplek 9 mm 120x240
Jabar wood 4 mm
Bilik bambu (tanpa kulit)
Bilik bambu (depan kulit)
Bilik bambu hitam variasi
Wall paper (kls menengah)
Multiplek 9 mm 120x240
Multiplek 12 mm 120x240
Multiplek 18 mm 120x240
Playwood 18 mm 120x240
Teakwood 3 mm 120x240
Teakwood 4 mm 120x240
Teakwood 9 mm 120x240
Teakwood ukuran pintu 4 mm
Tacon (tahan bakar)
Supercon
Melamin 4 mm
Melamin TOK 4 mm
Formika
Formika Ukuran Pintu

lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr

63,500.00
78,500.00
54,000.00
115,500.00
161,000.00
288,500.00
23,000.00
34,500.00
46,000.00
78,500.00
138,500.00
184,500.00
323,000.00
317,500.00
127,000.00
150,000.00
80,800.00
80,800.00
115,500.00
40,400.00
138,500.00
173,200.00
161,500.00
138,500.00

bh
bh

1,350.00
570.00

BAHAN LANTAI DAN PELAPIS DINDING


1 Tegel Wafel PC 20x20
2 Plint tegel PC 10x20

2
3
4
5
6
7

Tegel PC 30x30
Plint tegel PC 15x30
Tegel warna 20x20
Plint tegel warna 10x20
Tegel warna 30x30

3
bh
bh
bh
bh
bh

4
4,200.00
1,600.00
1,600.00
690.00
1,700.00

1
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
G.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

2
Plint tegel warna 15x30
Tegel Wafel warna 20x20
Tegel badak PC 30x30
Poslin 11x11 Warna Putih DN
Poslin 11x11 Warna khusus DN
Keramik 10x20 DN Putih kw II
Keramik 10x20 DN Warna/Corak kw II
Keramik 20x20 KM DN Putih kw II
Keramik 20x20 DN Warna/Corak kw II
Keramik 20x25 dinding DN Warna/Corak kw II
Keramik 30x30 DN Putih kw II
Keramik 30x30 DN Warna/Corak kw II
Keramik 30x30 DN Putih kw I
Keramik 30x30 DN Warna/Corak kw I
Vinyl lantai biasa
Karpet kelas baik LN
Karpet kelas sedang LN
Stairnosing keramik 10x20
Stairnosing fiber
Granit alam DN ukuran besar
Granit alam DN ukuran kecil
Granito tile Essensa ukuran 40x40 polis
Granito tile Essensa ukuran 40x40 unpolis
Marmer alam Lampung ukuran kecil
Marmer alam Citatah ukuran kecil
Teraso karang 30x30
Plin teraso 10x30
Granit alam LN kualitas sedang ukuran besar
Granit alam LN kualitas baik ukuran besar
Marmer alam Lampung ukuran besar
Marmer alam Citatah ukuran besar
Marmer sintesis
Granito tile Essensa ukuran 60x60 polis
Granito tile Essensa ukuran 60x60 unpolis
Bata karawang KW I
Campuran untuk kedap air

3
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m'
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
ls

2,600.00
1,800.00
5,700.00
43,800.00
48,500.00
46,000.00
51,000.00
46,000.00
51,000.00
55,000.00
46,000.00
51,000.00
69,000.00
46,000.00
20,000.00
570,000.00
420,000.00
8,000.00
11,500.00
1,150,000.00
924,000.00
259,000.00
161,000.00
346,000.00
173,000.00
31,000.00
25,000.00
1,500,000.00
1,848,000.00
427,000.00
231,000.00
138,000.00
462,000.00
184,000.00
1,700.00
34,000.00

BAHAN SALURAN AIR KOTOR (RIOLERING)


Grafel U 20 cm
Grafel U 30 cm
Grafel U 40 cm
Buis beton dia. 20 cm
Buis beton dia. 30 cm
Buis beton dia. 40 cm
Buis beton dia. 50 cm (0,5 m)
Buis beton dia. 60 cm (0,5 m)
Buis beton dia. 110 cm (0,5 m)
Buis beton dia. 80 cm (0,5 m)
Buis beton dia. 10 cm (0,5 m)
Buis beton dia. 15 cm (0,5 m)
Buis beton dia. 20 cm (0,5 m)
Buis beton dia. 25 cm (0,5 m)
Ijuk

m'
m'
m'
m'
m'
m'
stk
stk
stk
stk
stk
stk
stk
stk
kg

34,000.00
51,000.00
70,000.00
40,000.00
172,000.00
252,000.00
398,000.00
427,000.00
1,091,000.00
714,000.00
23,000.00
28,500.00
28,500.00
57,000.00
11,500.00

Kg

12,000.00

H. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi beton U. 24 rata-rata

2
2
3
4
5

Besi beton U. 39 rata-rata


Baja Teralis
Baja, Profil/Besi Siku 70,70,7
Baja, Tulang Beton

3
Kg
Kg

4
12,500.00
13,200.00
21,175.00
15,400.00

1
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

2
Pagar BRC lengkap tiang
Bondek
IWF Ex DN S I I
IWF Ex Jepang
Besi profil DN S I I
Besi profil Ex. LN
Besi Clip Chanel
Besi Hollow 40 40 08
Besi Hollow 40 20 08
Besi Kanal
Besi Bulat ST 42
Besi Bulat ST 60
Besi Cor
Besi Plat
Besi Plat Strip
Ongkos galvanis besi
Roda Gigi M10
Niple
Spie
Drucklager Kecil/Besar
Angker Bolt 20Kg
Splite pen/ Pengunci
Seal
Seal Karet
Na F + Ring
Kawat beton
Kawat Duri
Kawat pengikat
Kawat bronjong Non Pabrikan
Kawat bronjong Pabrikan 3.0 mm ( isi = 1 m3)
Besi siku 50 50 5
Kawat tembaga
Ram nyamuk hijau
Ram nyamuk 1x1 cm
Ram ayam
Kawat kasa
Kawat harmonika 4 cm
Kawat harmonika 2 cm
Kawat las listrik
Wiremesh M8
Wiremesh M6
Timah
Timah hitam
Ram nyamuk alumunium
Plat strip dia. 3 mm - 3 cm
Plat strip dia. 3 mm - 4 cm
Plat alumunium 0,2 mm
Plat alumunium 0,3 mm
Plat alumunium 0,4 mm
Plat alumunium 0,5 mm
Plat alumunium 0,6 mm
Plat alumunium 0,1 mm
Plat Bronze
Kusen alumunium natural 1,3 mm
Kusen alumunium warna 1,3 mm
Kusen jendela alumunium natural 1,3 mm

3
m2
m2
Kg
Kg
Kg
Kg
Kg
Btg
Btg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ps
Bh
Bh
Bh
Bh
Bh
Bh
m'
Bh
Kg
m'
kg
kg
Unit
btg
kg
m2
m2
m2
m2
m2
m2
kg
m2
m2
Kg
Kg
m2
btg
btg
m2
m2
m2
m2
m2
m2
Kg
m'
m'
m2

4
258,000.00
246,000.00
20,700.00
18,000.00
19,000.00
19,000.00
11,500.00
69,000.00
40,000.00
13,200.00
9,900.00
11,220.00
15,400.00
11,000.00
18,500.00
9,075.00
3,432,000.00
5,280.00
23,100.00
792,000.00
43,560.00
58,080.00
316,800.00
316,800.00
203,280.00
20,500.00
86,500.00
23,000.00
34,100.00
550,000.00
20,500.00
28,500.00
19,500.00
13,500.00
13,500.00
25,000.00
23,000.00
13,500.00
72,000.00
286,000.00
519,000.00
40,000.00
62,000.00
24,000.00
10,000.00
9,000.00
69,000.00
92,000.00
109,000.00
132,000.00
144,000.00
34,000.00
33,000.00
86,000.00
127,000.00
127,000.00

1
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
I.

2
Kusen jendela alumunium warna 1,3 mm
Daun pintu alumunium natural
Daun pintu alumunium warna
Handle alumunium
Kait angin sendok alumunium
Karet accessories kusen/pintu alumunium
Seng plat BJLS 30 d = 60 cm
Seng plat BJLS 30 d = 90 cm
Plat besi tipis 1 mm
Plat besi tipis 0,5 mm
Plat besi 2 mm s/d 5 mm
Plat besi 10 mm ke atas
Lem kuning
Lem fox
Alumunium 0,3 mm

BAHAN KACA
1 Kaca Polos 2 mm

3
m2
m2
m2
bh
ps
m'
m'
kg
Kg
Kg
Kg
Kg
Kg
Kg
lbr

4
161,000.00
219,000.00
242,000.00
164,000.00
127,000.00
7,000.00
28,500.00
75,000.00
11,500.00
11,500.00
11,500.00
11,500.00
33,000.00
19,000.00
92,000.00

m2

42,500.00

1
2
3
4
5
6
7
8
9
10
11
J.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
K.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

2
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Rayband 5 mm
Kaca Rayband 8 mm
Kaca graver 12 mm
Kaca patri lokal
Kaca graver 6 mm
Kaca Naco Lengkap Frame
Grass Block DN 20x20 (kedawung)
Grass Block DN 20x20 ex. LN

3
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh

4
86,500.00
115,500.00
138,500.00
334,500.00
519,500.00
1,155,000.00
346,500.00
231,000.00
28,500.00
86,500.00

BAHAN PAKU DAN MUR BAUT


Paku 1 cm - 3 cm
Paku 4 cm - 10 cm
Paku 12 cm
Paku beton 2 cm s/d 5 cm
Paku sekrup
Paku cacing
Paku Jembatan
Paku Seng
Paku Keling 3/4", 5/8", 7/8"
Besi beugeul kuda-kuda
Duk angker
Angker mur baud dia. 19 / P= 60 cm
Mur Baud 1/2", 5/8", 7/8"
Mur baud HTB dia. 12 cm
Mur baud HTB dia. 19 s/d 16 (5 cm)
Mur baud biasa dia. 19 s/d 16 (5 cm)
Piser dia. 12 s/d 20 cm
Baud Baja

kg
kg
kg
kg
bh
kg
kg
kg
kg
kg
bh
bh
Kg
Kg
bh
bh
bh
Kg

23,000.00
19,500.00
19,500.00
34,500.00
1,000.00
34,500.00
15,125.00
17,600.00
19,800.00
54,000.00
35,500.00
46,000.00
23,100.00
15,125.00
11,000.00
6,000.00
5,700.00
9,075.00

BAHAN PERPIPAAN (RIOLERING DAN ANSINERING


Besi pipa hydran BSP dia. 1"
Besi pipa hydran BSP dia. 1,25"
Besi pipa hydran BSP dia. 1,5"
Besi pipa hydran BSP dia. 2"
Besi pipa hydran BSP dia. 2,5"
Besi pipa hydran BSP dia. 3"
Besi pipa hydran BSP dia. 4"
Besi pipa hydran BSP dia. 6"
Besi pipa hitam dia. 1" t= 2 mm (6 m)
Besi pipa hitam dia. 2" t= 2 mm (6 m)
Besi pipa hitam dia. 3" t= 2 mm (6 m)
Besi pipa hitam dia. 4" t= 2 mm (6 m)
Besi pipa hitam dia. 5" t= 2 mm (6 m)
Pipa Galvanis Dia 3"
Pipa Galvanis Dia 4"
Pipa Porus
Sambungan Pipa PVC jenis AW 4" TY
Air Valve Single Drat With Flange 0,75"
Air Valve Single Drat With Flange 1"
Air Valve Single Drat With Flange1,5"
Air Valve Single Drat With Flange 2"
Air Valve Single Drat With Flange 3"
Air Valve Double Drat With Flange 2"
Air Valve Double Drat With Flange 3"

btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
bh
bh
bh
bh
bh
bh
bh
bh

211,200.00
314,000.00
361,000.00
348,000.00
477,000.00
486,000.00
488,000.00
866,000.00
150,000.00
260,000.00
635,000.00
773,000.00
831,000.00
323,000.00
519,000.00
115,000.00
20,500.00
173,000.00
288,000.00
519,000.00
1,732,000.00
2,079,000.00
1,501,000.00
1,732,000.00

1
25
26
27
28
29
30
31

2
Air Valve Double Drat With Flange 4"
Ball Valve Drat 0,5"
Ball Valve Drat 0,75"
Ball Valve Drat 1"
Ball Valve Drat 1,5"
Ball Valve Drat 2"
Ball Valve Drat 2,5"

3
bh
bh
bh
bh
bh
bh
bh

4
3,349,000.00
46,000.00
57,500.00
60,000.00
115,000.00
231,000.00
288,000.00

1
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
L.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

2
Ball Valve Drat 3"
Ball Valve Flange 3"
Ball Valve Flange 4"
Ball Valve Flange 6"
Ball Valve Flange 8"
Pipa PVC maspion abu-abu dia 1/2"
Pipa PVC maspion abu-abu dia 3/4"
Pipa PVC maspion abu-abu dia 1"
Pipa PVC maspion abu-abu dia 1 1/4"
Pipa PVC maspion abu-abu dia 1 1/2"
Pipa PVC maspion abu-abu dia 2"
Pipa PVC maspion abu-abu dia 2 1/2"
Pipa PVC maspion abu-abu dia 3"
Pipa PVC maspion abu-abu dia 4"
Pipa PVC maspion abu-abu dia 6"
Macam-macam sambungan GIP dia. 1/2" (AW)
Macam-macam sambungan GIP dia. 3/4" (AW)
Macam-macam sambungan GIP dia. 1" (AW)
Macam-macam sambungan GIP dia. 1 1/4" (AW)
Macam-macam sambungan GIP dia. 1 1/2" (AW)
Macam-macam sambungan GIP dia. 1 3/4" (AW)
Macam-macam sambungan GIP dia. 2" (AW)
Macam-macam sambungan GIP dia. 2 1/2" (AW)
Macam-macam sambungan GIP dia. 3" (AW)
Macam-macam sambungan GIP dia. 4" (AW)
Sambungan Pipa PVC jenis AW 4" TY
Lem paralon
Solatip ledeng
Lem PVC

3
bh
bh
bh
bh
bh
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg

4
554,000.00
2,194,000.00
3,465,000.00
6,699,000.00
9,240,000.00
92,000.00
46,000.00
46,000.00
69,000.00
92,000.00
115,000.00
150,000.00
207,000.00
323,000.00
385,000.00
1,700.00
2,800.00
3,400.00
5,700.00
6,900.00
8,000.00
12,500.00
23,000.00
46,000.00
69,000.00
20,500.00
11,500.00
4,500.00
57,500.00

BAHAN SANITAIR DAN PERPIPAAN


Stop kran 3/4" KIT
Stop kran 1" KIT
Stop kran 1 1/2" KIT
Stop kran 2" KIT
Stop kran 2 1/2" KIT
Stop kran 3" KIT
Check valve 1/2"
Double neuple 1/2"
Wafer mur 1/2"
Gate valve 1/2"
Saringan air lantai km stainless steel
Apooer bath tube
Kran steinlees lokal kait
Shower dengan tiang
Shower tanpa tiang
Kran tembok sansui 1/2"
Kran tembok ITAP 1/2"
Kran bebek sansui 1/2"
Kran bebek ITAP 1/2"
Kran panas dingin steinlees steel TOTO
Bath koop lengkap standar
Tempat sabun porselin
Wastafel lengkap standar putih TOTO
Wastafel lengkap INA
Closet Jongkok Std. warna Poslin TOTO

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
unit
bh
unit
unit

288,000.00
311,500.00
288,000.00
334,000.00
577,000.00
924,000.00
51,000.00
43,000.00
46,000.00
57,000.00
46,000.00
924,000.00
46,000.00
924,000.00
288,000.00
66,000.00
63,000.00
173,000.00
103,000.00
519,000.00
131,000.00
68,000.00
1,039,000.00
75,000.00
265,000.00

2
26 Closet Jongkok Std. Putih Poslin TOTO
27 Closet Jongkok lengkap sistem Jet TOTO

3
unit
unit

4
173,000.00
577,000.00

1
28
29
30
31
32
33
M.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
N.
1
2
3
4
5
6
7
8
9

2
Wastafel bulat warna standar lengkap
Closet duduk standar lengkap INA
Urinoir lengkap TOTO warna standar
Penyekat porselin urinoir TOTO
Khinchen zink stainlees standar
Khinchen zink stainlees standar (1 lobang)

3
unit
bh
unit
bh
bh
bh

4
2,079,000.00
1,270,000.00
1,617,000.00
519,000.00
519,000.00
1,212,000.00

BAHAN PENUTUP ATAP


Atap plastik gelombang 80x180 cm
Atap fiber glass tipis 60x180 cm (gelombang)
Atap fiber glass tebal 60x180 cm (gelombang)
Seng Gelombang BJLS 30 80x180
Seng Gelombang BJLS 28 80x180
Atap alumunium natural USR 26
Atap alumunium warna USR 26
Atap asbes Gel. Kecil 4 mm 80x180 cm
Atap asbes Gel. besar 5 mm 80x180 cm
Atap tegola kubota lengkap
Atap tegola kwalitas sedang
Alumunium Fuile
Atap Genteng Plentong pres bakar
Atap Genteng Plentong pres ex. Jatiwangi
Atap Genteng Plentong pres Open
Bubungan genteng flam pres bulat ex. Jatiwangi
Genteng bubungan ex. Jatiwangi
Genteng Bubungan Beton
Genteng metal (rainbow roof)
Genteng metal hana
Nok atas metal (rainbow roof)
Nok atas metal hana
Nok pinggir metal (rainbow roof)
Nok asbes gelombang
Wall flasing (rainbow roof)
Wall flasing hana
Atap genteng beton natural
Atap genteng beton warna
Sirap Kelas I (80/m2)
Genteng Keramik natural intan
Genteng Keramik Glasurl standar
Genteng Keramik Glasurl special
Genteng Keramik Glasurl premium
Genteng Murando natural 1 m2 = 20 bh
Genteng Murando glasur 1 m2 = 20 bh
Bubungan genteng glasur
Bubungan genteng natural

lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
m2
m2
m2
bh
bh
bh
bh
bh
bh
m2
m2
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

24,000.00
43,000.00
80,000.00
86,000.00
69,000.00
138,000.00
231,000.00
60,000.00
103,000.00
519,000.00
277,000.00
13,800.00
1,150.00
1,700.00
1,380.00
6,900.00
5,700.00
11,500.00
231,000.00
161,000.00
164,000.00
80,500.00
113,000.00
56,500.00
103,500.00
80,500.00
9,200.00
10,300.00
13,800.00
11,500.00
15,500.00
16,500.00
18,400.00
2,300.00
4,000.00
17,300.00
8,600.00

BAHAN MEKANIKAL
Jokey Pump Kap. 80 gln/menit 100 m l (18,6 kw)
Elektrik Pump Kap. 750 gln/menit 120 m l (990 kw)
Diesel Pump Kap. 750 gln/menit 120 m l (105 kw)
Presure Tank Kap. 750 ltr lengkap
Hydan Box dalam gedung (lengkap)
Fire House 1.5 x 30 m + nose
Exphouse Fan H.360 CFN 60x60
Exphouse Fan H.380 CFN 55x55
Exphouse Fan 40x40 100 w

unit
unit
unit
unit
unit
unit
unit
unit
unit

57,750,000.00
173,250,000.00
404,250,000.00
34,650,000.00
5,775,000.00
4,042,500.00
5,775,000.00
5,197,500.00
1,732,500.00

1
O.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

2
BAHAN ELEKTRIKAL
Kabel NYA 1 x 1,5 Prima
Kabel NYA 1 x 2,5 Prima
Kabel NYM 2 x 1,5 Prima
Kabel NYM 3 x 1,5 Prima
Kabel NYM 2 x 2,5 Prima
Kabel NYM 3 x 2,5 Prima
Kabel NYM 4 x 2,5 Prima
Kabel NYM 2 x 4 Prima
Kabel NYM 3 x 4 Prima
Kabel NYM 4 x 4 Prima
Kabel NYM 2 x 6 Prima
Kabel NYM 3 x 6 Prima
Kabel NYM 4 x 6 Prima
Kabel NYM 2 x 10 Prima
Kabel NYM 3 x 10 Prima
Kabel NYM 4 x 10 Prima
Kabel NYM 4 x 16 Prima
Kabel NYY 2 x 4 Prima
Kabel NYY 3 x 4 Prima
Kabel NYY 4 x 4 Prima
Kabel NYY 2 x 6 Prima
Kabel NYY 3 x 6 Prima
Kabel NYY 4 x 6 Prima
Kabel NYY 2 x 10 Prima
Kabel NYY 3 x 10 Prima
Kabel NYY 4 x 10 Prima
Kabel NYY 4 x 16 Prima
Kabel NYY 1x70 qmm
Kabel NYY 1x95 qmm
Kabel NYY 1x70 mm2
Kabel NYY 1x50 mm2
Saklar
Sealtafe
CCO
Wad Clem
Kabel TIC 1x35
Kabel TIC 3x35+N
Kabel TIC 2x10 mm
Kawat AAAC 70 mm
Kawat BC 50
Isolator tutup
Isolator asfan
Isolator Stay
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A
Rumah Panel 30 x 60 cm (kosong)
Skring kas 2 group biasa
Skring kas 3 group biasa
Skring kas 5 group biasa
MCB 1 PHASE
MCB 3 PHASE
Tahanan 50 A merk fuji
Saklar Broco tunggal standar
Saklar Broco seri standar
Stop kontak Broco standar

3
roll
roll
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
Bh
Bh
Bh
Bh
m'
m'
m'
m'
m'
Bh
Bh
Bh
bh
bh
unit
unit
unit
unit
unit
bh
bh
bh
bh
bh

4
66,000.00
98,000.00
3,700.00
4,500.00
5,400.00
6,350.00
8,000.00
9,800.00
9,800.00
13,800.00
8,000.00
13,500.00
17,300.00
16,700.00
21,900.00
28,800.00
43,800.00
18,000.00
20,000.00
25,000.00
20,000.00
25,000.00
27,500.00
25,000.00
30,000.00
40,000.00
60,000.00
137,750.00
205,875.00
100,538.00
83,738.00
15,675.00
10,381.00
20,625.00
12,375.00
16,023.00
48,750.00
17,188.00
18,375.00
110,000.00
331,250.00
436,250.00
100,000.00
71,500.00
173,000.00
127,000.00
144,300.00
184,800.00
369,600.00
40,000.00
49,000.00
438,900.00
13,800.00
17,300.00
15,000.00

1
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
P
1
2
3
4
Q
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

2
Stop kontak Broco 3 phase (out bow)
Stop kontak Broco 3 phase (in bow)
Stop kontak handle 3 phase
Instalasi titik lampu/stop kontak
Lampu pijar 5 watt s/d 100 watt
Lampu Hemat Energi 40 watt
Lampu neon TL philip 20 watt
Lampu neon TL philip 40 watt
Trapo TL 20 watt (philip)
Trapo TL 40 watt (philip)
Trapo TL 20 watt (sinar)
Trapo TL 40 watt (sinar)
Stater neon philip
Stater neon biasa
Rumah TK I 2x20 W kosongan
Down light + SL 25 W
Lampu SL philip 25 W
Lampu Sirkel TL 20 W lengkap
Lampu mercury 80 W
Lampu taman + tiang + mercury
Lampu baret 30 cm + neon
Jarum penangkal petir 16
Kawat BC (tembaga)
Pentahanan penangkal petir
Pentahanan panel

3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk

BAHAN KEPERLUAN JARINGAN LISTRIK


Tiang TB 11/350 daN
Tiang TB 11/200 daN
Tiang TB 9/200 daN
Tiang TB 9/100 daN

btg
btg
btg
btg

4,888,443.00
4,221,399.00
2,856,772.00
2,621,251.00

bh
bh
bh
bh
bh

288,750.00
307,500.00
326,250.00
394,875.00
710,000.00
598,750.00
11,500.00
23,750.00
35,000.00
39,625.00
120,000.00
57,500.00
8,750.00
41,250.00
41,250.00
45,000.00
90,625.00
32,500.00
75,000.00
7,500.00
42,500.00
234,375.00
15,625.00

MATERIAL HARDWARE TM
Traves TUmpu 1,8 m UNP 10
Traves Asfan 1,8 m UNP 10
Traves Tampu 2 m UNP 10
Traves Asfan 2,5 m UNP 10
Traves Asfan UNP 10 (3m)
Dudukan cat out & Arester
Mur baut dan ring 16 x 60mm
Mur baut dan ring 16 x 140mm
Mur baut dan ring 16 x 260mm
Mur baut dan ring 16 x 300mm
Plat simpul
Clamp Begel
Binding Wire
Plat Strip Tipe 1
Plat Strip Tipe 2
Cross Arm
Straint Clamp
Shacle medium
Turn Buckle medium
Timble medium
Prefrom Spiral Grip D.35
Expanding Anchoor medium
Steel Wire D.35

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

4
65,800.00
115,500.00
65,800.00
115,500.00
6,900.00
170,500.00
11,500.00
16,000.00
25,400.00
30,000.00
19,500.00
24,000.00
4,000.00
1,900.00
85,800.00
242,500.00
115,500.00
55,400.00
92,000.00
242,500.00
173,000.00
85,000.00
34,000.00
346,500.00
150,000.00

1
Klem sechor TB 11m
Klem sechor TB 9m
H. Type Connector 70
Travers V 2,1 m UNP 10

3
bh
bh
bh
bh

R
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

MATERIAL GARDU
Pondasi gardu cantol
Pentanahan gardu cantol
Sepatu kabel Cu. 50
Sepatu kabel Al. 35
Sepatu kabel Cu. 70
Dudukan Cut Out dan Arrester
Dudukan Travo 50 KVA/type duduk
Link 25 x 25
Paralel Grouve Cu. 50
Stopping buckle
Link 25 x 50
H. Type Connector 70/35
H. Type Connector 35/35
Stainles steel strip untuk pentanahan dan pipa
Rood earthing 20x2500 mm lengkap Clamp
Binding Wire
Bare Conductorn CU.50 mm2
Bimetal Joint silve Cu/Al 50/35
Bimetal Joint silve Cu/Al 50/25
Cut Out 20Kv 100Amp dan Fuse Link
Arrester 20Kv 5 KA
Pengadaan Lemari bagi 2jurusan pake saklar NH furse & ddk.MDI
Trafo Distribusi 50Kva/ 3 fasa
Trafo Distribusi 100Kva/ 3 fasa

bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
mtr
set
mtr
mtr
bh
bh
bh
bh
Set
bh
bh

883,313.00
169,969.00
29,531.00
14,438.00
32,156.00
643,781.00
1,586,813.00
2,231.00
15,750.00
1,969.00
2,166.00
32,156.00
28,219.00
10,369.00
94,238.00
8,859.00
69,038.00
45,281.00
45,281.00
950,000.00
887,500.00
7,905,625.00
72,312,500.00
90,937,500.00

MATERIAL HARDWARE TR
Suspension Clamp
Stainless Steel Strap
Stoping buckle
Plastik strap
Large Angle
Fixed Dead and Ass
H.Type Connector 35
Electrical Protec
Link 25x25
Link 25x50
Earthing Rood
Sackle Light
Turn Buckle Light
Timble Light
Preporm Spiral Grip D.9
Expanding Anchoor Light
Steel Wire D.9

bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
mtr

52,750.00
21,478.00
3,103.00
2,625.00
159,063.00
96,972.00
38,281.00
86,625.00
3,102.00
3,750.00
133,875.00
24,063.00
82,031.00
9,844.00
53,594.00
293,945.00
18,594.00

BAHAN ALAT PENGGANTUNG DAN KUNCI


Kunci alpha khusus alumunium
Tarikan pintu alumunium handle
Rel henderson lengkap
Rel maraton 1 pintu
Kunci 2 slaag Royal

bh
bh
bh
unit
bh

404,000.00
37,500.00
577,500.00
144,000.00
92,000.00

28
29
30
31

56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
T
1
2
3
4
5

4
86,250.00
67,500.00
50,000.00
768,750.00

1
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
U
1
2
3
4
V
1
2
3
4
5
6
7
8
9
10
11
W
1
2
3
4
5
6
X

2
Kunci 2 slaag Seis Standard
Kunci 2 slaag Anchor Standard asli
Kunci 2 slaag ISO Standard asli
Kunci 2 slaag Silinder utama standar
Kunci 2 slaag kuda terbang
Kunci KM bulat Kualitas Biasa
Kunci KM bulat alfa biasa
Kunci gembok merk Yale
Kunci gembok
Espagnolet
Grendel 15 Cm
Grendel 5 Cm
Kait Angin Jendela biasa
Kait Angin Jendela antik
Hak angin sendok
Nako lengkap tralis 1 daun
Sloot pintu berikut rantai
Sloot jendela tunggal
Engsel pintu unilon
Engsel Jendela Unilon
Engsel patruh
Engsel Harmonika
Door closer kelas standar
Door closer kelas non standar
Door closer kelas rendah
Tarikan almari rata-rata
Seng BJLS 30 I = 60 cm

3
bh
bh
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
ps
ps
ps
daun
bh
ps
ps
ps
ps
m'
unit
unit
unit
bh
m'

4
346,000.00
138,000.00
167,000.00
490,000.00
75,000.00
54,800.00
42,000.00
98,438.00
23,100.00
50,500.00
15,000.00
4,600.00
9,200.00
23,000.00
51,500.00
23,000.00
75,000.00
16,000.00
14,400.00
10,000.00
6,900.00
9,200.00
194,000.00
577,500.00
202,000.00
11,500.00
44,000.00

BAHAN PENUTUP KONSTRUKSI JALAN


Hotmix jadi berikut alat dan bahan bakar
Aspal (Eso) 1 drum 150 kg
Aspal curah
Aspal RC 70 (Cilacap)

ton
kg
kg
kg

1,761,000.00
11,500.00
8,500.00
9,800.00

BAHAN PENGHISAP AIR SUMUR DALAM


Pompa kodok
Pompa dragon tegal
Mesin pompa air 100 w - Sanyo
Mesin pompa air 150 w - Sanyo
Mesin Jet Pump 250 w - Sanyo
Mesin Jet Pump 450 w - Sanyo
Pompa Submersible kapasitas 150 km 3 kw
Geer pompa kapasitas 60 km 3 kw
Deep weel + kelengkapannya kapasitas 150 km
Hand oil pump
Injuk

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
kg

250,000.00
400,000.00
2,000,000.00
2,500,000.00
3,500,000.00
9,240,000.00
35,000,000.00
60,000,000.00
40,425,000.00
57,750,000.00
11,500.00

BAHAN PENAMPUNG AIR


Tangki air fiber glass 0,5 m3
Tangki air fiber glass 1 m3
Tangki air fiber glass 2 m3
Bak KM fiber 60x60
Bak traso WC 30x30
Bak KM traso 60x60

bh
bh
bh
bh
bh
bh

330,000.00
660,000.00
1,100,000.00
110,000.00
55,000.00
110,000.00

BAHAN QUALITY CONTROL, IZIN-IZIN, PENGUKURAN BIASA DAN BIAYA PENYAMBUNGAN

1
1
2
3
4
5
6
7
8
9
10
11
12

2
Penyambungan listrik PLN
IMB tidak bertingkat rata-rata (rumah/kantor)
IMB tidak bertingkat rata-rata (untuk usaha)
Sondir rata-rata
Pengukuran site + patok
Biaya tes jalan (quality control)
Biaya tes 1 macam beton
Biaya pengujian bahan agregat
Biaya pengujian listrik
Izin sumur artesis lengkap
Penyambungan PDAM untuk rumah
Geolistrik

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

ALAT TUKANG
Martil
Cangkul
Singkup
Sekop
Pengki
Linggis
Rool meter 30 m
Rool meter 5 m
Selang plastik d= 0,5 cm
Dolak Adukan
Ember
Gunting Pemotong Baja
Kunci Pembelot Tulangan
Palu Pemecah Batu
Stegerwerk
Water Pass Aluminium 60 cnm

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

36,500.00
46,000.00
46,000.00
46,000.00
9,200.00
36,500.00
115,500.00
23,000.00
17,000.00
22,000.00
7,700.00
19,250.00
6,600.00
35,200.00
2,310.00
86,500.00

BAHAN BAKAR DAN PELUMAS


Minyak Tanah
Solar Subsidi
Solar Non Subsidi
Premium Subsidi
Premium Non Subsidi
Minyak Pelumas
Minyak Flux (emulsi)

lt
lt
lt
lt
lt
lt
lt

8,000.00
4,500.00
6,450.00
4,500.00
6,450.00
22,000.00
11,550.00

Z
1
2
3
4
5
6
7

3
1w
m2
m2
1 ttk
m2
ttk
1 spl
1 spl
1w
unit
unit
1 ttk

4
1,650.00
22,000.00
27,500.00
275,000.00
1,650.00
165,000.00
110,000.00
110,000.00
440.00
3,850,000.00
1,650,000.00
330,000.00

ANALISA STANDAR BELANJA PER OUT PUT KEGIATAN PEKERJAAN BANGUNAN ( GEDUNG )

GEDUNG PER-M2
GEDUNG BERTINGKAT
KLAS SEDERHANA

GEDUNG TIDAK BERTINGKAT

KLAS TIDAK SEDERHANA

3,697,000.00

5,175,450.00

KLAS SEDERHANA KLAS TIDAK SEDERHANA


3,055,500.00

4,277,700.00

RUMAH NEGARA
TIPE C
2,770,950.00

TIPE B
3,325,000.00

TIPEA
3,325,000.00

PAGAR PER-M1
GEDUNG

RUMAH NEGARA

KLAS SEDERHANA KLAS TIDAK SEDERHANA


DEPAN
SAMPING

TIPE C

TIPE B

TIPEA

947,700.00

1,042,500.00

848,600.00

933,500.00

933,500.00

1,147,650.00

1,262,400.00

940,500.00

1,034,500.00

1,034,500.00

BUPATI SERANG

A. TAUFIK NURIMAN

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR HARGA SATUAN PEKERJAAN

DAFTAR HARGA SATUAN UPAH

DAFTAR HARGA SATUAN BAHAN

DAFTAR HARGA SATUAN PEKERJAAN KABUPATEN


SERANG
TAHUN
ANGGARAN 2009

Kusen Pintu

Uraian
Ambang atas

m'

m2

m3

m'

m2

m3

m'

0.950

0.007

0.007

1.430

0.007

0.010

1.210

0.007

0.008

1.062

2.000

0.007

0.007

0.007

0.007

0.014

Tiang Tengah

0.007

Tang Tengah

0.007

Jumlah

Kusen Sopi-sopi

m3

Ambang Bawah

Tianng samping kanan

Kusen Bouvenlight

m2

Ambang Tengah

Tiang Samping kiri

Kusen Jendela

m'

2.000

0.007

0.014

4.950

0.049

0.035

8
0.392

0.007

0.008

0.920

1.200

0.007

0.008

0.400

0.007

0.003

0.764

1.150

0.007

0.008

0.350

0.007

0.002

0.007

1.200

0.007

0.008

6.410

0.049

0.045

0.007
0.400

0.007

0.003

3.570

0.049

0.025

1
0.196

1
0.179

0.049

0.025

0.600

0.007

0.004

0.196

0.735

0.400

0.007

0.003

Luas Keseluruahan

0.833

4.000

15.000

0.600

0.007

0.004

Volume Keseluhan

0.676

0.139

0.673

4.800

Daun jendela

Kaca
Jendela
Bouvenlight Pintu
Bouvenlight

Lebar

Tebal

Buah

0.820

0.03

3.000

4.945

6.593

0.570

0.720

0.03

24.000

9.850

12.312

Luas 1
Luas 2
Luas3
0.278
0.384
0.278
0.505

0.418

0.360

0.418

Buah

Luas

12.000
3.000

11.294
1.514

15.000

17.922
30.730

Total Luas Kaca

Luas

bh

Total

Lubang Jendela

2.530

12.000

30.360

Lubang Pintu

2.366

3.000

7.097

Lubang Bouvenlight

1.100

3.000

3.300

Lubang Sopi-sopi

0.634

4.000

Total Keseluruhan
Pekerjaan dinding

Luas

2.010

2.536
43.293

D.skiri
32.663

Jumlah total

266.296

Volumenya

223.003

D. belaka D sekat
77.220

23.265

D sekat
23.265

D depan D.s.kanan
77.220

32.663

2.980

bh

3.57

96.56

Tinggi

0.234

bh

25.64

Panjang Keseluruhan

Daun Pintu Panil

1.210

4
0.277

0.010

bh

39.60

0.007

0.007

Jumlah yang digunakan

1.430

0.034

11.92

ANALISA BIAYA KONSTRUKSI


Kebutuhan

Satuan

Indeks

1m' Pagar Sementara dari kayu tinggi 2 meter


Bahan Dolken kayu 8-10/400 cm
btg
1.250
Semen Portland
kg
2.500
Pasir Beton
m
0.005
Koral Beton
m
0.009
Kayu 5/7
m
0.072
Paku Biasa 2" - 5"
kg
0.060
Residu
lt
0.400
Tenaga Tukang Kayu
OH
0.200
Pekerja
OH
0.400
Kepala Tukang
OH
0.020
mandor
OH
0.020
Jumlah
Jumlah Total
1m' Pagar Sementara dari seng gelombang tinggi 2 meter
Bahan Dolken kayu 8-10/400 cm
btg
1.250
Semen Portland
kg
2.500
Seng Gelombang 3" - 5"
lbr
1.200
Pasir Beton
m
0.005
Koral Beton
m
0.009
Kayu 5/7
m
0.072
Paku Biasa 2" - 5"
kg
0.060
Meni Besi
lt
0.450
Tenaga Tukang Kayu
OH
0.200
Pekerja
OH
0.400
Kepala Tukang
OH
0.020
mandor
OH
0.020
Jumlah
Jumlah Total
1m' Pagar Sementara dari kawat duri tinggi 1,8 meter
Bahan Dolken kayu 8-10/400 cm
btg
1.000
Semen Portland
kg
2.000
Kawat Duri
kg
25.000
Pasir Beton
m
0.005
Koral Beton
m
0.009
Paku Biasa 2" - 5"
kg
0.060
Tenaga Tukang Kayu
OH
0.200
Pekerja
OH
0.300
Kepala Tukang
OH
0.020
mandor
OH
0.020
Jumlah
Jumlah Total
1m' Pengukuran dan Pemasangan Bouwplank
Bahan Kayu 5/7
m
0.012
Paku Biasa 2" - 5"
kg
0.020
Kayu Papan 3/20
m
0.007
Tenaga Tukang Kayu
OH
0.100
Pekerja
OH
0.100
Kepala Tukang
OH
0.010

Harga Satuan
Bahan
29,700.00
1,250.00
165,000.00
165,000.00
2,310,000.00
19,500.00
28,000.00

29,700.00
1,250.00
28,500.00
165,000.00
165,000.00
2,310,000.00
19,500.00
18,400.00

29,700.00
1,250.00
86,500.00
165,000.00
165,000.00
19,500.00

2,310,000.00
19,500.00
2,420,000.00

mandor

OH
0.005
Jumlah
Jumlah Total
1m' Pembuatan Kantor sementara, dengan lantai plesteran
Bahan Dolken kayu 8-10/400 cm
29,700.00
btg
1.250
Kayu
m
0.180 2,420,000.00
Paku Biasa
19,500.00
kg
0.850
Besi Strip
18,500.00
kg
1.100
Semen Portland
1,250.00
kg
35.000
Pasir Pasang
128,500.00
m
0.150
Pasir Beton
165,000.00
m
0.100
Koral Beton
165,000.00
m
0.150
Bata Merah
460.00
bh
30.000
Seng Plat
28,500.00
lbr
0.250
Jendela Nako
23,000.00
bh
2.000
Kaca Polos
115,500.00
m2
0.080
Kunci Tanam
92,000.00
bh
0.150
Plywood 4 mm
317,500.00
lbr
0.060
Tenaga Tukang Kayu
OH
2.000
Tukang Batu
OH
1.000
Pekerja
OH
2.000
Kepala Tukang
OH
0.300
mandor
OH
0.050
Jumlah
Jumlah Total
1m' Pembuatan Gudang Semen dan alat-alat
Bahan Dolken kayu 8-10/400 cm
29,700.00
btg
1.700
Kayu
2,420,000.00
m
0.210
Paku Biasa
19,500.00
kg
0.300
Semen Portland
1,250.00
kg
10.500
Pasir Beton
165,000.00
m
0.030
Koral Beton
165,000.00
m
0.050
Seng Gelombang bjls 30
28,500.00
lbr
1.500
Tenaga Tukang Kayu
OH
2.000
Pekerja
OH
1.000
Kepala Tukang
OH
0.200
mandor
OH
0.050
Jumlah
Jumlah Total
1m' Pembuatan Gudang Semen dan alat-alat
Bahan Dolken kayu 8-10/400 cm
29,700.00
btg
3.000
Kayu
m
0.276 2,420,000.00
Paku Biasa
19,500.00
kg
0.700
Seng Gelombang bjls 30
28,500.00
lbr
1.500
Tenaga Tukang Kayu
OH
1.500
Pekerja
OH
1.000
Kepala Tukang
OH
0.150
mandor
OH
0.050
Jumlah
Jumlah Total
1m Pembuatan Bedeng Buruh
Bahan Dolken kayu 8-10/400 cm
29,700.00
btg
1.250
Kayu
m
0.186 2,420,000.00
Paku Biasa
19,500.00
kg
0.300

Tenaga

Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang bjls 32
Plywood 4 mm
Tukang Kayu
Pekerja
Kepala Tukang
mandor

kg
m
m
lbr
lbr
OH
OH
OH
OH

18.000
0.030
0.050
1.500
1.350
2.000
1.000
0.200
0.050

1,250.00
165,000.00
165,000.00
28,500.00
317,500.00

Jumlah
Jumlah Total
1m Pembuatan bak adukan ukuran (40 x 50 x 20) cm
Bahan Kayu Terentang
m
0.036 2,420,000.00
Paku Biasa
19,500.00
kg
0.080
Kaso 5/7
33,000.00
btg
1.000
Tenaga Tukang Kayu
OH
0.300
mandor
OH
0.002
Jumlah
Jumlah Total
1m Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm
Bahan Bambu 6 - 8/600 cm
21,500.00
btg
1.000
Tali Ijuk
11,500.00
kg
0.250
Tenaga Tukang Kayu
OH
0.017
Pekerja
OH
0.250
Kepala Tukang
OH
0.002
mandor
OH
0.013
Jumlah
Jumlah Total
1m Pembuatan Jalan sementara
Bahan Batu Belah 15/20
138,600.00
m
0.150
Batu Pecah 5/7
146,500.00
m
0.090
Pasir Pasang
128,500.00
m
0.010
Tenaga Tukang Kayu
OH
1.000
mandor
OH
0.050
Jumlah
Jumlah Total
1m Bongkaran beton bertulang
Tenaga Pekerja
OH
6.667
mandor
OH
0.333
Jumlah
Jumlah Total
1m Bongkaran dinding Tembok Bata Merah
Tenaga Pekerja
OH
6.667
mandor
OH
0.333
Jumlah
Jumlah Total
1m' Pasang Pagar kawat jaring galvanis, tinggi 1,00 m
Bahan Pagar Kawat Jaring
lbr
0.434
Tenaga Tukang
OH
0.042
Pekerja
OH
0.004
Kepala Tukang
OH
0.042
mandor
OH
0.002
Jumlah
Jumlah Total

1m' Pasang Pagar beton pracetak (5 x 50 x 213) cm


Bahan Panel Beton Pracetak
lbr
0.986
Kolom beton Pracetak
btg
0.325
Pasir Beton
m
0.074
Koral 2/3
m
0.146
Semen abu-abu
kg
45.000
Tenaga Tukang Batu
OH
0.125
Pekerja
OH
0.375
Kepala Tukang
OH
0.012
mandor
OH
0.019
Jumlah
Jumlah Total
Menggali 1m tanah biasa sedalam 1 meter
Tenaga Pekerja
OH
0.750
mandor
OH
0.025
Jumlah
Jumlah Total
Menggali 1m tanah biasa sedalam 2 meter
Tenaga Pekerja
OH
0.900
mandor
OH
0.045
Jumlah
Jumlah Total
Menggali 1m tanah biasa sedalam 3 meter
Tenaga Pekerja
OH
1.050
mandor
OH
0.067
Jumlah
Jumlah Total
Menggali 1m tanah keras sedalam 1 meter
Tenaga Pekerja
OH
1.000
mandor
OH
0.032
Jumlah
Jumlah Total
Menggali 1m tanah cadas sedalam 1 meter
Tenaga Pekerja
OH
1.500
mandor
OH
0.060
Jumlah
Jumlah Total
Menggali 1m tanah lumpur sedalam 1 meter
Tenaga Pekerja
OH
1.200
mandor
OH
0.045
Jumlah
Jumlah Total
Menggali 1m2 striping tebing setinggi 1 meter
Tenaga Pekerja
OH
0.050
mandor
OH
0.005
Jumlah
Jumlah Total
Membuang 1m tanah sejauh 15 meter
Tenaga Pekerja
OH
0.330
mandor
OH
0.010
Jumlah
Jumlah Total
Mengurug Kembali 1m galian
Tenaga Pekerja
OH
0.110

mandor

OH
0.003
Jumlah
Jumlah Total
Memadatkan 1 m tanah (per 20 cm)
Tenaga Pekerja
OH
0.500
mandor
OH
0.050
Jumlah
Jumlah Total
Mengurug 1m pasir
Bahan Pasir Urug
86,000.00
m
1.200
Tenaga Pekerja
OH
0.300
mandor
OH
0.010
Jumlah
Jumlah Total
Mengurug 1m Batu apung
Bahan Batu apung
231,000.00
m
1.200
Tenaga Pekerja
OH
0.300
mandor
OH
0.010
Jumlah
Jumlah Total
Mengurug 1m batu kali bulat
Bahan Batu Kali Bulat
71,500.00
m
1.200
Tenaga Pekerja
OH
0.300
mandor
OH
0.010
Jumlah
Jumlah Total
Memasang 1 m lapisan Ijuk Tebal 10 cm, untuk bidang resapan
Bahan Ijuk
11,500.00
kg
6.000
Tenaga Pekerja
OH
0.150
mandor
OH
0.015
Jumlah
Jumlah Total
Mengurug 1m kerikil ayak tanpa pasir
Bahan Kerikil Sungai Ayak tanpa Pasi
82,500.00
m
1.200
Tenaga Pekerja
OH
0.300
mandor
OH
0.010
Jumlah
Jumlah Total
Mengurug 1m Kerikil Pecah Besar
Bahan Kerikil Pecah Bergradasi
82,500.00
m
1.200
Tenaga Pekerja
OH
0.300
mandor
OH
0.010
Jumlah
Jumlah Total
Memasang 1 m Sirtu padat untuk peninggian lantai bangunan
Bahan Sirtu
98,000.00
m
1.200
Tenaga Pekerja
OH
0.250
mandor
OH
0.025
Jumlah
Jumlah Total
Memasang 1 m Batu Kosong (Aanstamping)
Bahan Batu Belah 15/20
138,600.00
m
1.200
Pasir Urug
86,000.00
m
0.432
Tenaga Tukang Batu
OH
0.390

Pekerja
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m pondasi
Bahan Batu Belah 15/20
Semen Portland
Pasir Beton
Kerikil
Besi Beton
Kawat Beton
Tenaga Tukang Batu
Pekerja
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m pondasi
Semen Portland
Pasir Pasang
Tenaga Tukang Batu
Pekerja
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m pondasi
Bahan Batu Belah 15/20
Semen Portland
Pasir Pasang
Tenaga Tukang Batu
Pekerja
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m pondasi
Bahan Batu Belah 15/20
Semen Portland
Pasir Pasang
Tenaga Tukang Batu
Pekerja
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m pondasi
Bahan Batu Belah 15/20
Semen Portland
Pasir Pasang
Tenaga Tukang Batu
Pekerja
Kepala Tukang

OH
OH
OH

0.780
0.039
0.039

siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah


138,600.00
m
0.480
1,250.00
kg
194.000
165,000.00
m
0.312
165,000.00
m
0.468
12,000.00
kg
126.000
20,500.00
kg
1.800
OH
0.850
OH
3.400
OH
0.085
OH
0.170

batu belah, campuran 1 PC : 3 PP


kg
202.000
m
0.485
OH
0.750
OH
1.500
OH
0.075
OH
0.075

batu belah, campuran 1 PC : 4 PP


m
1.200
kg
163.000
m
0.520
OH
0.750
OH
1.500
OH
0.075
OH
0.075

batu belah, campuran 1 PC : 5 PP


m
1.200
kg
136.000
m
0.544
OH
0.750
OH
1.500
OH
0.075
OH
0.075

batu belah, campuran 1 PC : 6 PP


m
1.200
kg
117.000
m
0.561
OH
0.750
OH
1.500
OH
0.075

1,250.00
128,500.00

138,600.00
1,250.00
128,500.00

138,600.00
1,250.00
128,500.00

138,600.00
1,250.00
128,500.00

mandor

OH
0.075
Jumlah
Jumlah Total
Memasang 1 m pondasi batu belah, campuran 1 PC : 8 PP
Bahan Batu Belah 15/20
m
1.200
Semen Portland
kg
91.000
Pasir Pasang
m
0.584
Tenaga Tukang Batu
OH
0.750
Pekerja
OH
1.500
Kepala Tukang
OH
0.075
mandor
OH
0.075
Jumlah
Jumlah Total
Memasang 1 m pondasi sumuran, diameter 100 cm
Bahan Batu Belah 15/20
m
0.450
Semen Portland
kg
194.000
Pasir Beton
m
0.312
Kerikil
m
0.468
Tenaga Tukang Batu
OH
0.300
Pekerja
OH
2.380
Kepala Tukang
OH
0.030
mandor
OH
0.080
Jumlah
Jumlah Total
Memasang 1 m Plesteran 1 PC : 1 PP, tebal 15 mm
Bahan Semen Portland
kg
15.504
Pasir Pasang
m
0.016
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m Plesteran 1 PC : 2 PP, tebal 15 mm
Bahan Semen Portland
kg
10.224
Pasir Pasang
m
0.020
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m Plesteran 1 PC : 3 PP, tebal 15 mm
Bahan Semen Portland
kg
7.776
Pasir Pasang
m
0.023
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m Plesteran 1 PC : 4 PP, tebal 15 mm
Bahan Semen Portland
kg
6.240
Pasir Pasang
m
0.024

138,600.00
1,250.00
128,500.00

138,600.00
1,250.00
165,000.00
165,000.00

1,250.00
128,500.00

1,250.00
128,500.00

1,250.00
128,500.00

1,250.00
128,500.00

Tenaga

Pekerja
Tukang Batu
Kepala Tukang
mandor

OH
OH
OH
OH

Jumlah
Jumlah Total
Memasang 1 m Plesteran 1 PC : 5 PP, tebal 15 mm
Bahan Semen Portland
kg
Pasir Pasang
m
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 m Plesteran 1 PC : 6 PP, tebal 15 mm
Bahan Semen Portland
kg
Pasir Pasang
m
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 m Plesteran 1 PC : 7 PP, tebal 15 mm
Bahan Semen Portland
kg
Pasir Pasang
m
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 m Plesteran 1 PC : 8 PP, tebal 15 mm
Bahan Semen Portland
kg
Pasir Pasang
m
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 m berapen 1 PC : 5 PP, tebal 15 mm
Bahan Semen Portland
kg
Pasir Pasang
m
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 m Plesteran Skoning 1 PC : 2 PP, lebar
Bahan Semen Portland
kg
Pasir Pasang
m

0.300
0.150
0.015
0.015

5.184
0.026
0.300
0.150
0.015
0.015

1,250.00
128,500.00

4.416
0.027
0.300
0.150
0.015
0.015

1,250.00
128,500.00

3.936
0.028
0.300
0.150
0.015
0.015

1,250.00
128,500.00

3.456
0.029
0.300
0.150
0.015
0.015

1,250.00
128,500.00

5.184
0.026
0.150
0.075
0.008
0.008

1,250.00
128,500.00

10 mm
0.500
0.013

1,250.00
128,500.00

Tenaga

Pekerja
Tukang Batu
Kepala Tukang
mandor

OH
OH
OH
OH

0.080
0.400
0.040
0.004

Jumlah
Jumlah Total
Memasang 1 m Plesteran Ciprat 1 PC : 2 PP
Bahan Semen Portland
1,250.00
kg
4.320
Pasir Pasang
128,500.00
m
0.006
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m Finishing Siar Pasangan Dinding Bata Merah (=20m')
Bahan Semen Portland
1,250.00
kg
3.108
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m Finishing Siar Pasangan Dinding Conblock ekspose (=8m')
Bahan Semen Portland
1,250.00
kg
1.600
Tenaga Pekerja
OH
0.070
Tukang Batu
OH
0.035
Kepala Tukang
OH
0.004
mandor
OH
0.004
Jumlah
Jumlah Total
Memasang 1 m Finishing Siar Pasangan Batu kali adukan 1 PC : 2 PP
Bahan Semen Portland
1,250.00
kg
6.340
Pasir Pasang
128,500.00
m
0.012
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m Plesteran waterproof batacote 3 lapis
Bahan Semen Portland
1,250.00
kg
0.500
Batacote
0.00
bh
2.900
Pasir Pasang
128,500.00
m
0.006
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.200
Kepala Tukang
OH
0.020
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m Acian
Bahan Semen Portland
1,250.00
kg
3.250
Tenaga Pekerja
OH
0.200
Tukang Batu
OH
0.100

Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m dinding
Bahan Bata Merah
Semen Portland
Pasir Pasang
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m dinding
Bahan Bata Merah
Semen Portland
Pasir Pasang
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m dinding
Bahan Bata Merah
Semen Portland
Pasir Pasang
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m dinding
Bahan Bata Merah
Semen Portland
Pasir Pasang
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total
Memasang 1 m dinding
Bahan Bata Merah
Semen Portland
Pasir Pasang
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total

OH
OH

0.010
0.010

bata merah uk. (5 x 11 x 22) cm tebal bata ad. 1 PC : 2 PP


460.00
buah
70.000
1,250.00
kg
18.950
128,500.00
m
0.038
OH
0.300
OH
0.100
OH
0.010
OH
0.015

bata merah uk. (5 x 11 x 22) cm tebal bata ad. 1 PC : 3 PP


460.00
buah
70.000
1,250.00
kg
14.370
128,500.00
m
0.040
OH
0.300
OH
0.100
OH
0.010
OH
0.015

bata merah uk. (5 x 11 x 22) cm tebal bata ad. 1 PC : 4 PP


460.00
buah
70.000
1,250.00
kg
11.500
128,500.00
m
0.043
OH
0.300
OH
0.100
OH
0.010
OH
0.015

bata merah uk. (5 x 11 x 22) cm tebal bata ad. 1 PC : 5 PP


460.00
buah
70.000
1,250.00
kg
9.680
128,500.00
m
0.045
OH
0.300
OH
0.100
OH
0.010
OH
0.015

bata merah uk. (5 x 11 x 22) cm tebal bata ad. 1 PC : 6 PP


460.00
buah
70.000
1,250.00
kg
8.320
128,500.00
m
0.049
OH
0.300
OH
0.100
OH
0.010
OH
0.015

Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal bata ad. 1 PC : 8 PP


Bahan Bata Merah
460.00
buah
70.000
Semen Portland
1,250.00
kg
6.500
Pasir Pasang
128,500.00
m
0.050
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal 1 bata ad. 1 PC : 3 PP
Bahan Bata Merah
460.00
buah
140.000
Semen Portland
1,250.00
kg
32.950
Pasir Pasang
128,500.00
m
0.091
Tenaga Pekerja
OH
0.650
Tukang Batu
OH
0.200
Kepala Tukang
OH
0.020
mandor
OH
0.030
Jumlah
Jumlah Total
Memasang 1 m dinding HB/CB 20, ad. 1 PC : 3 PP
Bahan Hollow Block (HB 20)
buah
12.500
Semen Portland
1,250.00
kg
30.320
Pasir Pasang
128,500.00
m
0.728
Besi Angkur 8mm
23,100.00
kg
0.280
Tenaga Pekerja
OH
0.350
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
mandor
OH
0.018
Jumlah
Jumlah Total
Memasang 1 m dinding HB/CB 20, ad. 1 PC : 4 PP
Bahan Hollow Block (HB 20)
buah
12.500
Semen Portland
1,250.00
kg
24.260
Pasir Pasang
128,500.00
m
0.772
Besi Angkur 8mm
23,100.00
kg
0.280
Tenaga Pekerja
OH
0.350
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
mandor
OH
0.018
Jumlah
Jumlah Total
Memasang 1 m dinding HB/CB 15, ad. 1 PC : 3 PP
Bahan Hollow Block (HB 15)
buah
12.500
Semen Portland
1,250.00
kg
22.740
Pasir Pasang
128,500.00
m
0.550
Besi Angkur 8mm
23,100.00
kg
0.280
Tenaga Pekerja
OH
0.320
Tukang Batu
OH
0.120
Kepala Tukang
OH
0.012
mandor
OH
0.016
Jumlah
Jumlah Total
Memasang 1 m dinding HB/CB 15, ad. 1 PC : 4 PP

Bahan

Tenaga

Hollow Block (HB 15)


Semen Portland
Pasir Pasang
Besi Angkur 8mm
Pekerja
Tukang Batu
Kepala Tukang
mandor

buah
kg
m
kg
OH
OH
OH
OH

12.500
18.200
0.582
0.280
0.320
0.120
0.012
0.016

1,250.00
128,500.00
23,100.00

Jumlah
Jumlah Total
Memasang 1 m dinding HB/CB 10, ad. 1 PC : 3 PP
Bahan Hollow Block (HB 10)
buah
12.500
Semen Portland
1,250.00
kg
15.160
Pasir Pasang
128,500.00
m
0.364
Besi Angkur 8mm
23,100.00
kg
0.280
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m dinding HB/CB 10, ad. 1 PC : 4 PP
Bahan Hollow Block (HB 10)
buah
12.500
Semen Portland
1,250.00
kg
12.130
Pasir Pasang
128,500.00
m
0.388
Besi Angkur 8mm
23,100.00
kg
0.280
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m dinding terawang (roster) uk. (12 x 11 x 24) cm, ad. 1 PC : 3 PP
Bahan terawang (roster)
6,700.00
buah
25.000
Semen Portland
1,250.00
kg
14.000
Pasir Pasang
128,500.00
m
0.032
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m dinding terawang (roster) uk. (12 x 11 x 24) cm, ad. 1 PC : 4 PP
Bahan terawang (roster)
6,700.00
buah
25.000
Semen Portland
1,250.00
kg
11.000
Pasir Pasang
128,500.00
m
0.035
Tenaga Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 m dinding bata berongga ekspose uk. (5 x 11 x 24) cm, ad. 1 PC : 3 PP
Bahan bata berongga
buah
70.000

Tenaga

Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
mandor

kg
m
OH
OH
OH
OH

14.000
0.032
0.300
0.150
0.015
0.015

1,250.00
128,500.00

Jumlah
Jumlah Total
membuat 1 m beton mutu f'c = 7,4 Mpa (K 100), slump (12 2) cm, w/c = 0,87
Bahan Semen Portland
1,250.00
kg
247.000
Pasir Beton
165,000.00
m
0.621
Kerikil (maks. 30 mm)
165,000.00
m
0.740
Air
15.00
liter
215.000
Tenaga Pekerja
OH
1.650
Tukang Batu
OH
0.275
Kepala Tukang
OH
0.028
mandor
OH
0.083
Jumlah
Jumlah Total
membuat 1 m beton mutu f'c = 9,8 Mpa (K 125), slump (12 2) cm, w/c = 0,78
Bahan Semen Portland
1,250.00
kg
276.000
Pasir Beton
165,000.00
m
0.591
Kerikil (maks. 30 mm)
165,000.00
m
0.750
Air
15.00
liter
215.000
Tenaga Pekerja
OH
1.650
Tukang Batu
OH
0.275
Kepala Tukang
OH
0.028
mandor
OH
0.083
Jumlah
Jumlah Total
membuat 1 m beton mutu f'c = 12,2 Mpa (K 150), slump (12 2) cm, w/c = 0,72
Bahan Semen Portland
1,250.00
kg
299.000
Pasir Beton
117.86
kg
799.000
Kerikil (maks. 30 mm)
122.22
kg
1,017.000
Air
15.00
liter
215.000
Tenaga Pekerja
OH
1.650
Tukang Batu
OH
0.275
Kepala Tukang
OH
0.028
mandor
OH
0.083
Jumlah
Jumlah Total
membuat 1 m lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
Bahan Semen Portland
1,250.00
kg
230.000
Pasir Beton
117.86
m
0.638
Kerikil (maks. 30 mm)
122.22
m
0.761
Air
15.00
liter
200.000
Tenaga Pekerja
OH
1.200
Tukang Batu
OH
0.200
Kepala Tukang
OH
0.020
mandor
OH
0.060
Jumlah
Jumlah Total
membuat 1 m beton mutu f'c = 14,5 Mpa (K 175), slump (12 2) cm, w/c = 0,66
Bahan Semen Portland
1,250.00
kg
326.000

Tenaga

Pasir Beton
Kerikil (maks. 30 mm)
Air
Pekerja
Tukang Batu
Kepala Tukang
mandor

Jumlah
Jumlah Total
membuat 1 m beton mutu f'c
Bahan Semen Portland
Pasir Beton
Kerikil (maks. 30 mm)
Air
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total
membuat 1 m beton mutu f'c
Bahan Semen Portland
Pasir Beton
Kerikil (maks. 30 mm)
Air
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total
membuat 1 m beton mutu f'c
Bahan Semen Portland
Pasir Beton
Kerikil (maks. 30 mm)
Air
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total
membuat 1 m beton mutu f'c
Bahan Semen Portland
Pasir Beton
Kerikil (maks. 30 mm)
Air
Tenaga Pekerja
Tukang Batu
Kepala Tukang
mandor
Jumlah
Jumlah Total
membuat 1 m beton mutu f'c

m3
m3
liter
OH
OH
OH
OH

0.543
0.762
215.000
1.650
0.275
0.028
0.083

117.86
122.22
15.00

= 16,9 Mpa (K 200), slump (12 2) cm, w/c = 0,61


1,250.00
kg
352.000
117.86
kg
731.000
122.22
kg
1,031.000
15.00
liter
215.000
OH
1.650
OH
0.275
OH
0.028
OH
0.083

= 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58


1,250.00
kg
371.000
117.86
kg
698.000
122.22
kg
1,047.000
15.00
liter
215.000
OH
1.650
OH
0.275
OH
0.028
OH
0.083

= 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56


1,250.00
kg
384.000
117.86
kg
693.000
122.22
kg
1,039.000
15.00
liter
215.000
OH
1.650
OH
0.275
OH
0.028
OH
0.083

= 24 Mpa (K 275), slump (12 2) cm, w/c = 0,53


1,250.00
kg
406.000
117.86
kg
684.000
122.22
kg
1,026.000
15.00
liter
215.000
OH
1.650
OH
0.275
OH
0.028
OH
0.083

= 26,4 Mpa (K 300), slump (12 2) cm, w/c = 0,52

Bahan

Tenaga

Semen Portland
Pasir Beton
Kerikil (maks. 30 mm)
Air
Pekerja
Tukang Batu
Kepala Tukang
mandor

kg
kg
kg
liter
OH
OH
OH
OH

413.000
681.000
1,021.000
215.000
1.650
0.275
0.028
0.083

Jumlah
Jumlah Total
membuat 1 m beton mutu f'c = 28,8 Mpa (K 325), slump (12
Bahan Semen Portland
kg
439.000
Pasir Beton
kg
670.000
Kerikil (maks. 30 mm)
kg
1,006.000
Air
liter
215.000
Tenaga Pekerja
OH
2.100
Tukang Batu
OH
0.350
Kepala Tukang
OH
0.035
mandor
OH
0.105
Jumlah
Jumlah Total
membuat 1 m beton mutu f'c = 31,2 Mpa (K 350), slump (12
Bahan Semen Portland
kg
448.000
Pasir Beton
kg
667.000
Kerikil (maks. 30 mm)
kg
1,000.000
Air
liter
215.000
Tenaga Pekerja
OH
2.100
Tukang Batu
OH
0.350
Kepala Tukang
OH
0.035
mandor
OH
0.105
Jumlah
Jumlah Total
membuat 1 m beton kedap air dengan strotox - 100
Bahan Semen Portland
kg
400.000
Pasir Beton
m
0.480
Kerikil (2/3) cm
m
0.800
Strotox - 100
kg
1.200
Air
liter
210.000
Tenaga Pekerja
OH
2.100
Tukang Batu
OH
0.350
Kepala Tukang
OH
0.035
mandor
OH
0.105
Jumlah
Jumlah Total
membuat 1 m' PVC waterstop lebar 150 mm
Bahan Waterstop lebar 150 mm
m'
1.050
Tenaga Pekerja
OH
0.060
Tukang Batu/pipa
OH
0.030
Kepala Tukang
OH
0.003
mandor
OH
0.003
Jumlah
Jumlah Total
membuat 1 m' PVC waterstop lebar 200 mm
Bahan Waterstop lebar 200 mm
m'
1.050

1,250.00
117.86
122.22
15.00

2) cm, w/c = 0,49


1,250.00
117.86
122.22
15.00

2) cm, w/c = 0,48


1,250.00
117.86
122.22
15.00

1,250.00
165,000.00
165,000.00
15.00

Tenaga

Pekerja
Tukang Batu/pipa
Kepala Tukang
mandor

OH
OH
OH
OH

0.070
0.035
0.004
0.004

Jumlah
Jumlah Total
membuat 1 m' PVC waterstop lebar 230 mm - 320 mm
Bahan Waterstop lebar 230 - 320 m
m'
1.050
Tenaga Pekerja
OH
0.080
Tukang Batu/pipa
OH
0.040
Kepala Tukang
OH
0.004
mandor
OH
0.004
Jumlah
Jumlah Total
Pembesian 10 kg dengan besi polos/ulir
Bahan Besi beton (Polos/ulir)
kg
10.500
Kawat beton
kg
0.150
Tenaga Pekerja
OH
0.070
Tukang Besi
OH
0.070
Kepala Tukang
OH
0.007
mandor
OH
0.004
Jumlah
Jumlah Total
Pembesian 10 kg kabel presstressed polos/strands
Bahan Besi Beton (Polos/ulir)
kg
10.500
Kawat beton
kg
0.100
Tenaga Pekerja
OH
0.050
Tukang Besi
OH
0.050
Kepala Tukang
OH
0.005
mandor
OH
0.003
Jumlah
Jumlah Total
Pembesian 1 kg jaring kawat baja/wire mesh
Bahan jaring kawat baja dilas
kg
1.020
Kawat beton
kg
0.050
Tenaga Pekerja
OH
0.025
Tukang Besi
OH
0.025
Kepala Tukang
OH
0.002
mandor
OH
0.001
Jumlah
Jumlah Total
Memasang 1 m bekisting untuk pondasi
Bahan Kayu kelas III
m
0.040
Paku 5 cm - 10 cm
kg
0.300
Minyak Bekisting
liter
0.100
Tenaga Pekerja
OH
0.520
Tukang Besi
OH
0.260
Kepala Tukang
OH
0.026
mandor
OH
0.026
Jumlah
Jumlah Total
Memasang 1 m bekisting untuk sloof
Bahan Kayu kelas III
m
0.045
Paku 5 cm - 10 cm
kg
0.300

12,000.00
20,500.00

12,000.00
20,500.00

20,500.00

2,420,000.00
19,500.00
11,550.00

2,420,000.00
19,500.00

Tenaga

Minyak Bekisting
Pekerja
Tukang Besi
Kepala Tukang
mandor

liter
OH
OH
OH
OH

Jumlah
Jumlah Total
Memasang 1 m bekisting untuk kolom
Bahan Kayu kelas III
m
Paku 5 cm - 10 cm
kg
Minyak Bekisting
liter
Balok kayu klas II
m
Plywood tebal 9mm
lbr
Dolken kayu galam, 8-10 P. 4 m
btg
Tenaga Pekerja
OH
Tukang Besi
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 m bekisting untuk balok
Bahan Kayu kelas III
m
Paku 5 cm - 10 cm
kg
Minyak Bekisting
liter
Balok kayu klas II
m
Plywood tebal 9mm
lbr
Dolken kayu galam, 8-10 P. 4 m
btg
Tenaga Pekerja
OH
Tukang Besi
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 m bekisting untuk lantai
Bahan Kayu kelas III
m
Paku 5 cm - 10 cm
kg
Minyak Bekisting
liter
Balok kayu klas II
m
Plywood tebal 9mm
lbr
Dolken kayu galam, 8-10 P. 4 m
btg
Tenaga Pekerja
OH
Tukang Besi
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 m bekisting untuk dinding
Bahan Kayu kelas III
m
Paku 5 cm - 10 cm
kg
Minyak Bekisting
liter
Balok kayu klas II
m
Plywood tebal 9mm
lbr
Dolken kayu galam, 8-10 P. 4 m
btg
Formite/penjaga jarak/spacer
buah

0.100
0.520
0.260
0.026
0.026

11,550.00

0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033

2,420,000.00
19,500.00
11,550.00
3,190,000.00
138,500.00
29,700.00

0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033

2,420,000.00
19,500.00
11,550.00
3,190,000.00
138,500.00
29,700.00

0.040
0.400
0.200
0.015
0.350
6.000
0.660
0.330
0.033
0.033

2,420,000.00
19,500.00
11,550.00
3,190,000.00
138,500.00
29,700.00

0.030
0.400
0.200
0.020
0.350
3.000
4.000

2,420,000.00
19,500.00
11,550.00
3,190,000.00
138,500.00
29,700.00
20,000.00

Tenaga

Pekerja
Tukang Besi
Kepala Tukang
mandor

OH
OH
OH
OH

0.660
0.330
0.033
0.033

Jumlah
Jumlah Total
Memasang 1 m bekisting untuk tangga
Bahan Kayu kelas III
m
0.030 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
0.400
Minyak Bekisting
11,550.00
liter
0.150
Balok kayu klas II
m
0.015 3,190,000.00
Plywood tebal 9mm
138,500.00
lbr
0.350
Dolken kayu galam, 8-10 P. 4 m
29,700.00
btg
2.000
Tenaga Pekerja
OH
0.660
Tukang Besi
OH
0.330
Kepala Tukang
OH
0.033
mandor
OH
0.033
Jumlah
Jumlah Total
Memasang 1 m jembatan untuk pengecoran beton
Bahan Kayu kelas III (papan)
m
0.026 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
0.600
Dolken kayu galam, 8-10 P. 4 m
29,700.00
btg
0.500
Tenaga Pekerja
OH
0.150
Tukang Besi
OH
0.050
Kepala Tukang
OH
0.005
mandor
OH
0.008
Jumlah
Jumlah Total
Membuat 1 m pondasi beton bertulang (150 kg besi + bekisting)
Bahan Kayu kelas III
m
0.200 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
1.500
Minyak Bekisting
11,550.00
liter
0.400
Besi beton polos
12,000.00
kg
157.500
Kawat beton
20,500.00
kg
2.250
Semen Portland
1,250.00
kg
336.000
Pasir Beton
165,000.00
m
0.540
Kerikil
165,000.00
m
0.810
Tenaga Pekerja
OH
5.300
Tukang Batu
OH
0.275
Tukang Kayu
OH
1.300
Tukang Besi
OH
1.050
Kepala Tukang
OH
0.262
mandor
OH
0.265
Jumlah
Jumlah Total
Membuat 1 m sloof beton bertulang (200 kg besi + bekisting)
Bahan Kayu kelas III
m
0.270 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
2.000
Minyak Bekisting
11,550.00
liter
0.600
Besi beton polos
12,000.00
kg
210.000
Kawat beton
20,500.00
kg
3.000
Semen Portland
1,250.00
kg
336.000
Pasir Beton
165,000.00
m
0.540

Tenaga

Kerikil
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
mandor

m
OH
OH
OH
OH
OH
OH

0.810
5.650
0.275
1.560
1.400
0.323
0.283

165,000.00

Jumlah
Jumlah Total
Membuat 1 m kolom beton bertulang (200 kg besi + bekisting)
Bahan Kayu kelas III
m
0.400 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
4.000
Minyak Bekisting
11,550.00
liter
2.000
Besi beton polos
12,000.00
kg
210.000
Kawat beton
20,500.00
kg
4.500
Semen Portland
1,250.00
kg
336.000
Pasir Beton
165,000.00
m
0.540
kerikil
165,000.00
m
0.810
Kayu kelas II balok
m
0.150 3,190,000.00
Plywood tebal 9mm
138,500.00
lbr
3.500
Dolken kayu galam, 8-10 P.
29,700.00
btg
20.000
Tenaga Pekerja
OH
7.050
Tukang Batu
OH
0.275
Tukang Kayu
OH
1.650
Tukang Besi
OH
2.100
Kepala Tukang
OH
0.403
mandor
OH
0.353
Jumlah
Jumlah Total
Membuat 1 m kolom beton bertulang (300 kg besi + bekisting)
Bahan Kayu kelas III
m
0.400 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
4.000
Minyak Bekisting
11,550.00
liter
2.000
Besi beton polos
12,000.00
kg
315.000
Kawat beton
20,500.00
kg
4.500
Semen Portland
1,250.00
kg
336.000
Pasir Beton
165,000.00
m
0.540
kerikil
165,000.00
m
0.810
Kayu kelas II balok
3,190,000.00
m
0.150
Plywood tebal 9mm
138,500.00
lbr
3.500
Dolken kayu galam, 8-10 P.
29,700.00
btg
20.000
Tenaga Pekerja
OH
7.050
Tukang Batu
OH
0.275
Tukang Kayu
OH
1.650
Tukang Besi
OH
2.100
Kepala Tukang
OH
0.403
mandor
OH
0.353
Jumlah
Jumlah Total
Membuat 1 m balok beton bertulang (200 kg besi + bekisting)
Bahan Kayu kelas III
m
0.320 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
3.200
Minyak Bekisting
11,550.00
liter
1.600
Besi beton polos
12,000.00
kg
210.000

Tenaga

Kawat beton
Semen Portland
Pasir Beton
kerikil
Kayu kelas II balok
Plywood tebal 9mm
Dolken kayu galam, 8-10 P.
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
mandor

kg
kg
m
m
m
lbr
btg
OH
OH
OH
OH
OH
OH

3.000
336.000
0.540
0.810
0.140
2.800
16.000
6.350
0.275
1.650
1.400
0.333
0.318

20,500.00
1,250.00
165,000.00
165,000.00
3,190,000.00
138,500.00
29,700.00

Jumlah
Jumlah Total
Membuat 1 m plat beton bertulang (150 kg besi + bekisting)
Bahan Kayu kelas III
m
0.320 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
3.200
Minyak Bekisting
11,550.00
liter
1.600
Besi beton polos
12,000.00
kg
157.500
Kawat beton
20,500.00
kg
2.250
Semen Portland
1,250.00
kg
336.000
Pasir Beton
165,000.00
m
0.540
kerikil
165,000.00
m
0.810
Kayu kelas II balok
3,190,000.00
m
0.120
Plywood tebal 9mm
138,500.00
lbr
2.800
Dolken kayu galam, 8-10 P.
29,700.00
btg
32.000
Tenaga Pekerja
OH
5.300
Tukang Batu
OH
0.275
Tukang Kayu
OH
1.300
Tukang Besi
OH
1.050
Kepala Tukang
OH
0.265
mandor
OH
0.265
Jumlah
Jumlah Total
Membuat 1 m dinding beton bertulang (150 kg besi + bekisting)
Bahan Kayu kelas III
m
0.240 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
3.200
Minyak Bekisting
11,550.00
liter
1.600
Besi beton polos
12,000.00
kg
157.500
Kawat beton
20,500.00
kg
2.250
Semen Portland
1,250.00
kg
336.000
Pasir Beton
165,000.00
m
0.540
kerikil
165,000.00
m
0.810
Kayu kelas II balok
m
0.160 3,190,000.00
Plywood tebal 9mm
138,500.00
lbr
2.800
Dolken kayu galam, 8-10 P.
29,700.00
btg
24.000
Tenaga Pekerja
OH
5.300
Tukang Batu
OH
0.275
Tukang Kayu
OH
1.300
Tukang Besi
OH
1.050
Kepala Tukang
OH
0.262
mandor
OH
0.265
Jumlah

Jumlah Total
Membuat 1 m dinding beton bertulang (200 kg besi + bekisting)
Bahan Kayu kelas III
m
0.250 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
3.000
Minyak Bekisting
11,550.00
liter
1.200
Besi beton polos
12,000.00
kg
210.000
Kawat beton
20,500.00
kg
3.000
Semen Portland
1,250.00
kg
336.000
Pasir Beton
165,000.00
m
0.540
kerikil
165,000.00
m
0.810
Kayu kelas II balok
m
0.105 3,190,000.00
Plywood tebal 9mm
138,500.00
lbr
2.500
Dolken kayu galam, 8-10 P.
29,700.00
btg
14.000
Tenaga Pekerja
OH
5.650
Tukang Batu
OH
0.275
Tukang Kayu
OH
1.560
Tukang Besi
OH
1.400
Kepala Tukang
OH
0.323
mandor
OH
0.283
Jumlah
Jumlah Total
Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
Bahan Kayu kelas III
m
0.002 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
0.010
Besi beton polos
12,000.00
kg
3.000
Kawat beton
20,500.00
kg
0.045
Semen Portland
1,250.00
kg
4.000
Pasir Beton
165,000.00
m
0.006
Kerikil
165,000.00
m
0.009
Tenaga Pekerja
OH
0.180
Tukang Batu
OH
0.020
Tukang Kayu
OH
0.020
Tukang Besi
OH
0.020
Kepala Tukang
OH
0.006
mandor
OH
0.009
Jumlah
Jumlah Total
Membuat 1 m' ringbalk beton bertulang (10 x 15) cm
Bahan Kayu kelas III
m
0.003 2,420,000.00
Paku 5 cm - 10 cm
19,500.00
kg
0.020
Besi beton polos
12,000.00
kg
3.600
Kawat beton
20,500.00
kg
0.050
Semen Portland
1,250.00
kg
5.500
Pasir Beton
165,000.00
m
0.009
Kerikil
165,000.00
m
0.015
Tenaga Pekerja
OH
0.297
Tukang Batu
OH
0.033
Tukang Kayu
OH
0.033
Tukang Besi
OH
0.033
Kepala Tukang
OH
0.010
mandor
OH
0.015
Jumlah
Jumlah Total
Memasang 1 buah kloset jongkok porselen

Bahan

Tenaga

Kloset jongkok porselen


Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
mandor

bh
kg
m
OH
OH
OH
OH

1.000
6.000
0.010
1.000
1.500
1.500
0.160

Jumlah
Jumlah Total
Memasang 1 buah urinoir
Bahan Urinoir
bh
1.000
perlengkapan (30%xhrg urinoi
%
0.300
Semen Portland
kg
6.000
Pasir Pasang
m
0.010
Tenaga Pekerja
OH
1.000
Tukang Batu
OH
1.000
Kepala Tukang
OH
0.100
mandor
OH
0.100
Jumlah
Jumlah Total
Memasang 1 buah washtafel
Bahan Washtafel
bh
1.000
perlengkapan (12%xhrg wasta
%
0.120
Semen abu-abu
kg
6.000
Pasir Pasang
m
0.010
Tenaga Pekerja
OH
1.200
Tukang Batu
OH
1.450
Kepala Tukang
OH
0.150
mandor
OH
0.100
Jumlah
Jumlah Total
Memasang 1 buah bak mandi fiberglass vol. 0.30 m
Bahan Bak Fiberglass
bh
1.000
perlengkapan (18%xhrg bak)
%
0.180
Tenaga Pekerja
OH
1.800
Tukang Batu
OH
2.700
Kepala Tukang
OH
0.540
mandor
OH
0.110
Jumlah
Jumlah Total
Memasang 1 buah bak mandi batu bata vol. 0.30 m
Bahan Batu Bata
m
0.400
Semen Portland
kg
120.000
Pasir Pasang
m
0.300
Porselen (11 x 11) cm
bh
360.000
Semen nat
kg
6.000
Tenaga Pekerja
OH
6.000
Tukang Batu
OH
3.000
Kepala Tukang
OH
0.300
mandor
OH
0.300
Jumlah
Jumlah Total
Memasang 1 buah bak mandi fiberglass vol. 0.30 m
Bahan Badkip
bh
1.000

173,000.00
1,250.00
128,500.00

1,617,000.00
1,617,000.00
1,250.00
128,500.00

75,000.00
75,000.00
1,250.00
128,500.00

460.00
1,250.00
128,500.00
1,700.00

131,000.00

Tenaga

perlengkapan (20%xhrg badki


Pekerja
Tukang Batu
Kepala Tukang
mandor

%
OH
OH
OH
OH

0.200
0.075
0.750
0.250

131,000.00

Jumlah
Jumlah Total
Memasang 1 buah bak beton vol. 1 m air
Bahan Beton 1: 1 : 2
m
0.400 5,401,900.00
Besi Beton
12,000.00
kg
120.000
Kayu cetakan
135,200.00
m
0.300
Ubin Porselen
43,800.00
m
360.000
Perlengkapan (10% x hrg bah
###
%
0.100
Tenaga Pekerja
OH
3.500
Tukang Batu
OH
4.500
Kepala Tukang
OH
0.900
mandor
OH
0.900
Jumlah
Jumlah Total
Memasang 1 buah bak fiberglass vol. 1 m air
Bahan Bak Fiberglass
bh
1.000
Perlengkapan (12%xhrg bak)
%
0.120
Tenaga Pekerja
OH
3.000
Tukang Batu
OH
4.500
Kepala Tukang
OH
0.900
mandor
OH
0.900
Jumlah
Jumlah Total
Memasang 1m' pipa penyalur air limbah jenis pipa tanah, dia. 15 cm
Bahan Pipa Tanah
bh
1.600
Semen Portland
1,250.00
kg
0.680
Pasir Pasang
128,500.00
m
0.013
Pasir Urug
86,000.00
m
0.011
Tenaga Pekerja
OH
0.060
Tukang Batu
OH
0.030
Kepala Tukang
OH
0.003
mandor
OH
0.003
Jumlah
Jumlah Total
Memasang 1m' pipa penyalur air limbah jenis pipa tanah, dia. 20 cm
Bahan Pipa Tanah
bh
1.600
Semen Portland
1,250.00
kg
0.870
Pasir Pasang
128,500.00
m
0.014
Pasir Urug
86,000.00
m
0.014
Tenaga Pekerja
OH
0.080
Tukang Batu
OH
0.040
Kepala Tukang
OH
0.004
mandor
OH
0.007
Jumlah
Jumlah Total
Memasang 1m' pipa beton, dia. 15 cm - 20 cm
Bahan Pipa Beton
40,000.00
bh
1.100
Batu Bata
460.00
m
0.027
Semen Portland
1,250.00
kg
3.920

Tenaga

Pasir Pasang
Pasir Urug
Pekerja
Tukang Batu
Kepala Tukang
mandor

m
m
OH
OH
OH
OH

0.056
0.024
0.140
0.070
0.007
0.007

128,500.00
86,000.00

Jumlah
Jumlah Total
Memasang 1m' pipa beton, dia. 15 cm - 20 cm
Bahan Pipa Beton
40,000.00
bh
1.100
Batu Bata
460.00
m
0.027
Semen Portland
1,250.00
kg
3.920
Pasir Pasang
128,500.00
m
0.056
Pasir Urug
86,000.00
m
0.024
Tenaga Pekerja
OH
0.140
Tukang Batu
OH
0.070
Kepala Tukang
OH
0.007
mandor
OH
0.007
Jumlah
Jumlah Total
Memasang 1m' pipa beton, dia. 30 cm - 200 cm
Bahan Pipa Beton
172,000.00
bh
1.100
Batu Bata
460.00
m
0.550
Semen Portland
1,250.00
kg
10.300
Pasir Pasang
128,500.00
m
0.061
Pasir Urug
86,000.00
m
0.069
Tenaga Pekerja
OH
0.380
Tukang Batu
OH
0.190
Kepala Tukang
OH
0.019
mandor
OH
0.069
Jumlah
Jumlah Total
Memasang 1 buah bak kontrol pas. Batu bata uk. (30x30) cm, tinggi 35 cm
Bahan Batu Bata
460.00
bh
0.145
Semen Portland
1,250.00
kg
44.000
Pasir Pasang
128,500.00
m
0.070
Batu Kerikil
165,000.00
m
0.070
Besi Beton
12,000.00
kg
1.600
Pasir Beton
165,000.00
m
0.060
Tenaga Pekerja
OH
3.200
Tukang Batu
OH
1.015
Kepala Tukang
OH
0.002
mandor
OH
0.016
Jumlah
Jumlah Total
Memasang 1 buah bak kontrol pas. Batu bata uk. (45x45) cm, tinggi 50 cm
Bahan Batu Bata
460.00
bh
0.250
Semen Portland
1,250.00
kg
77.000
Pasir Pasang
128,500.00
m
0.130
Batu Kerikil
165,000.00
m
0.020
Besi Beton
12,000.00
kg
2.600
Pasir Beton
165,000.00
m
0.090
Tenaga Pekerja
OH
1.420
Tukang Batu
OH
0.473

Kepala Tukang
mandor

OH
OH

0.047
0.071

Jumlah
Jumlah Total
Memasang 1 buah bak kontrol pas. Batu bata uk. (60x60) cm, tinggi 65 cm
Bahan Batu Bata
460.00
bh
0.371
Semen Portland
1,250.00
kg
114.000
Pasir Pasang
128,500.00
m
0.184
Batu Kerikil
165,000.00
m
0.033
Besi Beton
12,000.00
kg
4.850
Pasir Beton
165,000.00
m
0.120
Tenaga Pekerja
OH
2.160
Tukang Batu
OH
0.720
Tukang Gali
OH
0.100
Kepala Tukang
OH
0.072
mandor
OH
0.108
Jumlah
Jumlah Total
Memasang 1m' pipa galvanis diameter "
Bahan Pipa Galvanis
15,519.68
m'
1.200
Perlengkapan (35%xhrg pipa)
15,519.68
%
0.350
Tenaga Pekerja
OH
0.054
Tukang Batu
OH
0.090
Kepala Tukang
OH
0.009
mandor
OH
0.027
Jumlah
Jumlah Total
Memasang 1m' pipa galvanis diameter "
Bahan Pipa Galvanis
23,279.52
m'
1.200
Perlengkapan (35%xhrg pipa)
23,279.52
%
0.350
Tenaga Pekerja
OH
0.054
Tukang Batu
OH
0.090
Kepala Tukang
OH
0.009
mandor
OH
0.027
Jumlah
Jumlah Total
Memasang 1m' pipa galvanis diameter 1"
Bahan Pipa Galvanis
31,039.36
m'
1.200
Perlengkapan (35%xhrg pipa)
37,247.23
%
0.350
Tenaga Pekerja
OH
0.054
Tukang Batu
OH
0.090
Kepala Tukang
OH
0.009
mandor
OH
0.027
Jumlah
Jumlah Total
Memasang 1m' pipa galvanis diameter 1"
Bahan Pipa Galvanis
50,600.62
m'
1.200
Perlengkapan (35%xhrg pipa)
60,720.75
%
0.350
Tenaga Pekerja
OH
0.108
Tukang Batu
OH
0.180
Kepala Tukang
OH
0.018
mandor
OH
0.005
Jumlah
Jumlah Total

Memasang 1m' pipa galvanis diameter 3"


Bahan Pipa Galvanis
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa galvanis diameter 4"
Bahan Pipa Galvanis
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa PVC tipe AW diameter
Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa PVC tipe AW diameter
Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa PVC tipe AW diameter
Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa PVC tipe AW diameter
Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total

1.200
0.350
0.108
0.180
0.018
0.005

53,833.33
64,600.00

1.200
0.350
0.135
0.225
0.023
0.007

86,500.00
103,800.00

1.200
0.350
0.036
0.060
0.006
0.002

23,000.00
27,600.00

1.200
0.350
0.036
0.060
0.006
0.002

11,500.00
13,800.00

1.200
0.350
0.036
0.060
0.006
0.002

11,500.00
13,800.00

1.200
0.350
0.036
0.060
0.006
0.002

23,000.00
27,600.00

"

"

1"

1"

Memasang 1m' pipa PVC tipe AW diameter


Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa PVC tipe AW diameter
Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa PVC tipe AW diameter
Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa PVC tipe AW diameter
Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1m' pipa PVC tipe AW diameter
Bahan Pipa PVC
m'
Perlengkapan (35%xhrg pipa)
%
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total
Memasang 1 buah kran " atau "
Bahan Kran Air
bh
Seal Tape
set
Tenaga Pekerja
OH
Tukang Batu
OH
Kepala Tukang
OH
mandor
OH
Jumlah
Jumlah Total

2"
1.200
0.350
0.054
0.090
0.009
0.003

28,750.00
34,500.00

1.200
0.350
0.036
0.060
0.006
0.002

37,500.00
45,000.00

1.200
0.350
0.081
0.135
0.014
0.004

51,750.00
62,100.00

1.200
0.350
0.081
0.135
0.014
0.004

80,750.00
96,900.00

1.200
0.350
0.081
0.135
0.014
0.004

96,250.00
115,500.00

1.000
0.025
0.010
0.100
0.010
0.005

46,000.00
10,381.00

2"

3"

4"

6"

Memasang 1 buah floor drain


Bahan Floor Drain
46,000.00
bh
1.000
Tenaga Pekerja
OH
0.010
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.005
Jumlah
Jumlah Total
1 m2 Pengecatan Kayu 2x
Bahan Cat meni
18,400.00
kg
0.200
Plamir
32,300.00
kg
0.150
Cat dasar
35,800.00
kg
0.170
Cat Penutup 2x
35,800.00
kg
0.260
Tenaga Pekerja
OH
0.070
Tukang Cat
OH
0.009
Kepala Tukang
OH
0.006
mandor
OH
0.003
Jumlah
Jumlah Total
1 m2 Pengecatan Tembok 2x lapis penutup
Bahan Plamir
9,200.00
kg
0.100
Cat dasar
19,000.00
kg
0.100
Cat Penutup 2x
19,000.00
kg
0.260
Tenaga Pekerja
OH
0.020
Tukang Cat
OH
0.063
Kepala Tukang
OH
0.006
mandor
OH
0.003
Jumlah
Jumlah Total
Memasang 1 m2 langit-langit tripleks, tebal 3 mm, 4 mm, 6mm
Bahan Tripleks
78,500.00
lbr
0.375
Paku Tripleks
23,000.00
kg
0.030
Tenaga Pekerja
OH
0.100
Tukang Kayu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.005
Jumlah
Jumlah Total
Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, 6mm
Bahan Asbes semen
28,800.00
m2
1.100
Paku Tripleks
23,000.00
kg
0.010
Tenaga Pekerja
OH
0.030
Tukang Kayu
OH
0.070
Kepala Tukang
OH
0.007
mandor
OH
0.004
Jumlah
Jumlah Total
Memasang 1 m2 langit-langit GRC Board tebal 6 mm
Bahan GRC Board
lbr
0.364
Paku Skrup
23,000.00
kg
0.110
Tenaga Pekerja
OH
0.100
Tukang Kayu
OH
0.050
Kepala Tukang
OH
0.005
mandor
OH
0.005

Jumlah
Jumlah Total
Memasang 1 m3 Konstruksi gordeng, kayu kelas II
Bahan Balok Kayu
161,500.00
1.100
m3
Besi Strip tebal 5 mm
kg
15.000
Paku 12 cm
334,500.00
kg
5.600
Tenaga Pekerja
OH
4.000
Tukang Kayu
OH
12.000
Kepala Tukang
OH
1.200
mandor
OH
0.200
Jumlah
Jumlah Total
Memasang 1 m3 Konstruksi gordeng, kayu kelas II
Bahan Balok Kayu
m3
1.100 3,190,000.00
Besi Strip tebal 5 mm
kg
15.000
Paku 12 cm
19,500.00
kg
5.600
Tenaga Pekerja
OH
2.400
Tukang Kayu
OH
7.200
Kepala Tukang
OH
0.720
mandor
OH
0.120
Jumlah
Jumlah Total
Memasang 1 m3 Rangka atap genteng, kayu kelas II
Bahan Kaso-kaso (5 x 7) cm
m3
0.014 2,310,000.00
3
Reng (2 x 3) cm
m
0.004 3,175,000.00
Paku 5 cm - 10 cm
19,500.00
kg
0.250
Tenaga Pekerja
OH
0.100
Tukang Kayu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.005
Jumlah
Jumlah Total
Memasang 1 m3 Rangka atap genteng beton, kayu kelas II
Bahan Kaso-kaso (5 x 7) cm
0.014 2,310,000.00
m3
3
Reng (3 x 4) cm
0.007 3,175,000.00
m
Paku 5 cm - 10 cm
19,500.00
kg
0.250
Tenaga Pekerja
OH
0.100
Tukang Kayu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.005
Jumlah
Jumlah Total
Memasang 1 m2 Rangka Atap Sirap, kayu kelas II
Bahan Kayu kelas II
m3
0.165 2,310,000.00
Paku 5 cm - 10 cm
19,500.00
kg
0.200
Tenaga Pekerja
OH
0.120
Tukang Kayu
OH
0.120
Kepala Tukang
OH
0.012
mandor
OH
0.006
Jumlah
Jumlah Total
Memasang 1 m2 Rangka langit-langit (50 x 100) cm, kayu kelas II dan III
Bahan Kaso-kaso (5 x 7) cm
m3
0.015 2,310,000.00

Tenaga

Paku 7 cm - 10 cm
Pekerja
Tukang Kayu
Kepala Tukang
mandor

kg
OH
OH
OH
OH

0.200
0.150
0.300
0.030
0.075

19,500.00

Jumlah
Jumlah Total
Memasang 1 m2 Rangka langit-langit (60 x 60) cm, kayu kelas II dan III
Bahan Kaso-kaso (5 x 7) cm
m3
0.016 2,310,000.00
Paku 7 cm - 10 cm
19,500.00
kg
0.250
Tenaga Pekerja
OH
0.200
Tukang Kayu
OH
0.300
Kepala Tukang
OH
0.030
mandor
OH
0.010
Jumlah
Jumlah Total
Memasang 1 m' Listplank uk. (3x20) cm, kayu kelas I atau kelas II
Bahan Papan Kayu
m3
0.011 3,465,000.00
Paku 5 cm - 7 cm
19,500.00
kg
0.100
Tenaga Pekerja
OH
0.100
Tukang Kayu
OH
0.200
Kepala Tukang
OH
0.020
mandor
OH
0.005
Jumlah
Jumlah Total
Memasang 1 m' list langit-langit kayu profil
Bahan List Kayu Profil
9,250.00
m'
1.050
Paku
19,500.00
kg
0.010
Tenaga Pekerja
OH
0.050
Tukang Kayu
OH
0.050
Kepala Tukang
OH
0.005
mandor
OH
0.003
Jumlah
Jumlah Total
Memasang 1 m2 atap genteng metal
Bahan Genteng metal
231,000.00
lbr
1.020
Paku 5 cm - 12 cm
19,500.00
kg
0.200
Tenaga Pekerja
OH
0.200
Tukang Kayu
OH
0.100
Kepala Tukang
OH
0.010
mandor
OH
0.001
Jumlah
Jumlah Total
Memasang 1 m' nok Genteng Metal
Bahan Genteng Decra bond
164,000.00
bh
1.100
Paku Biasa 1/2" - 1"
19,500.00
kg
0.050
Tenaga Pekerja
OH
0.250
Tukang Kayu
OH
0.150
Kepala Tukang
OH
0.015
mandor
OH
0.013
Jumlah
Jumlah Total
Memasang 1 m2 Lantai keramik 20x20 cm
Bahan keramik
2,040.00
bh
26.500

Tenaga

Semen Portland
Pasir pasang
Semen warna
Pekerja
Tukang Kayu
Kepala Tukang
mandor

kg
m3
kg
OH
OH
OH
OH

10.400
0.045
1.620
0.700
0.350
0.035
0.035

1,250.00
128,500.00
5,700.00

Jumlah
Jumlah Total
Memasang 1 m2 Rangka Atap Baja Ringan
Bahan Trusses & Rafter
72,600.00
m2
1.010
Batten & Braching
63,000.00
m2
1.010
Wall Plate
9,600.00
m2
1.010
Connector & Others
21,900.00
m2
1.010
Tenaga Pekerja Baja Ringan
OJ
0.353
Tukang Baja Ringan
OJ
0.118
Kepala Tukang Baja Ringan
OJ
0.118
Mandor Baja Ringan
OJ
0.059
Tenaga Ahli Utama S1
OJ
0.059
Alat
Jig Pryda Penyetel Baja Ringa
24600
jam
0.059
Bor Listrik
9900
jam
0.056
Genset Kecil
36157.14
jam
0.056
Alat Bantu
600
ls
1.000
Jumlah
Jumlah Total
Membuat dan Memasang 1 m3 kusen pintu dan kusen jendela
Bahan Balok Kayu
m3
1.200 3,190,000.00
Paku 10 cm
19,500.00
kg
1.250
Lem Kayu
kg
1.000
Tenaga Pekerja
OH
6.000
Tukang Kayu
OH
18.000
Kepala Tukang
OH
1.800
mandor
OH
0.300
Jumlah
Jumlah Total
Memasang 1 m2 Pintu teakwood lapis formika rangka kayu
Bahan Papan Kayu Klass II
m3
0.025 3,465,000.00
Paku Biasa 1/2" - 1"
19,500.00
kg
0.030
Lem Kayu
kg
0.800
Teakwood 4' x 8' x 4 mm
150,000.00
lbr
1.000
Formika 4' x 8'
138,500.00
lbr
0.500
Tenaga Pekerja
OH
0.850
Tukang Kayu
OH
2.550
Kepala Tukang
OH
0.255
mandor
OH
0.043
Jumlah
Jumlah Total

Harga Satuan
Upah

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00

Jumlah Harga
37,125.00
3,125.00
825.00
1,485.00
166,320.00
1,170.00
11,200.00
9,000.00
16,000.00
1,000.00
1,100.00
248,350.00
248,300.00
37,125.00
3,125.00
34,200.00
825.00
1,485.00
166,320.00
1,170.00
8,280.00
9,000.00
16,000.00
1,000.00
1,100.00
279,630.00
279,600.00
29,700.00
2,500.00
2,162,500.00
825.00
1,485.00
1,170.00
9,000.00
12,000.00
1,000.00
1,100.00
2,221,280.00
2,221,200.00
27,720.00
390.00
16,940.00
4,500.00
4,000.00
500.00

55,000.00

45,000.00
45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

275.00
54,325.00
54,300.00
37,125.00
435,600.00
16,575.00
20,350.00
43,750.00
19,275.00
16,500.00
24,750.00
13,800.00
7,125.00
46,000.00
9,240.00
13,800.00
19,050.00
90,000.00
45,000.00
80,000.00
15,000.00
2,750.00
955,690.00
955,600.00
50,490.00
508,200.00
5,850.00
13,125.00
4,950.00
8,250.00
42,750.00
90,000.00
40,000.00
10,000.00
2,750.00
776,365.00
776,300.00
89,100.00
667,920.00
13,650.00
42,750.00
67,500.00
40,000.00
7,500.00
2,750.00
931,170.00
931,100.00
37,125.00
450,120.00
5,850.00

P
E
K
E
R
J
A
A
N
P
E
R
S
I
A
P
A
N

A
N

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
55,000.00

22,500.00
4,950.00
8,250.00
42,750.00
428,625.00
90,000.00
40,000.00
10,000.00
2,750.00
1,142,920.00
1,142,900.00
87,120.00
1,560.00
33,000.00
13,500.00
82.50
135,262.50
135,200.00
21,500.00
2,875.00
765.00
10,000.00
100.00
715.00
35,955.00
35,900.00
20,790.00
13,185.00
1,285.00
45,000.00
2,750.00
83,010.00
83,000.00

40,000.00
55,000.00

266,680.00
18,315.00
284,995.00
284,900.00

40,000.00
55,000.00

266,680.00
18,315.00
284,995.00
284,900.00

45,000.00
40,000.00
50,000.00
55,000.00

1,890.00
160.00
2,100.00
110.00
4,260.00
4,200.00

4
0.05
0.07
0.014

1
1
1
1 71.4285714

40,000.00
55,000.00

30,000.00
1,375.00
31,375.00
31,300.00

40,000.00
55,000.00

36,000.00
2,475.00
38,475.00
38,400.00

40,000.00
55,000.00

42,000.00
3,685.00
45,685.00
45,600.00

40,000.00
55,000.00

40,000.00
1,760.00
41,760.00
41,700.00

40,000.00
55,000.00

60,000.00
3,300.00
63,300.00
63,300.00

40,000.00
55,000.00

48,000.00
2,475.00
50,475.00
50,400.00

40,000.00
55,000.00

2,000.00
275.00
2,275.00
2,200.00

40,000.00
55,000.00

13,200.00
550.00
13,750.00
13,700.00

40,000.00

4,400.00

P
E
K
E
R
J
A

55,000.00

183.33
4,583.33
4,500.00

40,000.00
55,000.00

20,000.00
2,750.00
22,750.00
22,700.00

40,000.00
55,000.00

40,000.00
55,000.00

40,000.00
55,000.00

40,000.00
55,000.00

40,000.00
55,000.00

40,000.00
55,000.00

40,000.00
55,000.00

45,000.00

103,200.00
12,000.00
550.00
115,750.00
115,700.00
277,200.00
12,000.00
550.00
289,750.00
289,700.00
85,800.00
12,000.00
550.00
98,350.00
98,300.00
69,000.00
6,000.00
825.00
75,825.00
75,800.00
99,000.00
12,000.00
550.00
111,550.00
111,500.00
99,000.00
12,000.00
550.00
111,550.00
111,500.00
117,600.00
10,000.00
1,375.00
128,975.00
128,900.00
166,320.00
37,152.00
17,550.00

E
R
J
A
A
N
T
A
N
A
H

40,000.00
50,000.00
55,000.00

31,200.00
1,950.00
2,145.00
256,317.00
256,300.00
B : 3 KR dan 40% batu belah
66,528.00
242,500.00
51,480.00
77,220.00
1,512,000.00
36,900.00
45,000.00
38,250.00
40,000.00
136,000.00
50,000.00
4,250.00
55,000.00
9,350.00
2,174,478.00
2,174,400.00

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00

252,500.00
62,322.50
33,750.00
60,000.00
3,750.00
4,125.00
416,447.50
416,400.00
166,320.00
203,750.00
66,820.00
33,750.00
60,000.00
3,750.00
4,125.00
538,515.00
538,500.00
166,320.00
170,000.00
69,904.00
33,750.00
60,000.00
3,750.00
4,125.00
507,849.00
507,800.00
166,320.00
146,250.00
72,088.50
33,750.00
60,000.00
3,750.00

P
E
K
E
R
J
A
A
N
P
O
N
D
A
S
I

S
I
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

45,000.00
40,000.00
50,000.00
55,000.00

4,125.00
486,283.50
486,200.00
166,320.00
113,750.00
75,044.00
33,750.00
60,000.00
3,750.00
4,125.00
456,739.00
456,700.00
62,370.00
242,500.00
51,480.00
77,220.00
13,500.00
95,200.00
1,500.00
4,400.00
548,170.00
548,100.00

40,000.00
45,000.00
50,000.00
55,000.00

19,380.00
2,056.00
12,000.00
6,750.00
750.00
825.00
41,761.00
41,700.00

40,000.00
45,000.00
50,000.00
55,000.00

12,780.00
2,570.00
12,000.00
6,750.00
750.00
825.00
35,675.00
35,600.00

40,000.00
45,000.00
50,000.00
55,000.00

9,720.00
2,955.50
12,000.00
6,750.00
750.00
825.00
33,000.50
33,000.00
7,800.00
3,084.00

40,000.00
45,000.00
50,000.00
55,000.00

12,000.00
6,750.00
750.00
825.00
31,209.00
31,200.00

40,000.00
45,000.00
50,000.00
55,000.00

6,480.00
3,341.00
12,000.00
6,750.00
750.00
825.00
30,146.00
30,100.00

40,000.00
45,000.00
50,000.00
55,000.00

5,520.00
3,469.50
12,000.00
6,750.00
750.00
825.00
29,314.50
29,300.00

40,000.00
45,000.00
50,000.00
55,000.00

4,920.00
3,598.00
12,000.00
6,750.00
750.00
825.00
28,843.00
28,800.00

40,000.00
45,000.00
50,000.00
55,000.00

4,320.00
3,726.50
12,000.00
6,750.00
750.00
825.00
28,371.50
28,300.00

40,000.00
45,000.00
50,000.00
55,000.00

6,480.00
3,341.00
6,000.00
3,375.00
400.00
440.00
20,036.00
20,000.00
625.00
1,670.50

P
E
K
E
R
J
A
A
N
P
L
E
S
T
E
R
A

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

3,200.00
18,000.00
2,000.00
220.00
25,715.50
25,700.00
5,400.00
771.00
12,000.00
4,500.00
500.00
825.00
23,996.00
23,900.00
3,885.00
12,000.00
4,500.00
500.00
825.00
21,710.00
21,700.00

pose (=8m')
40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00

2,000.00
2,800.00
1,575.00
200.00
220.00
6,795.00
6,700.00
7,925.00
1,542.00
12,000.00
6,750.00
750.00
825.00
29,792.00
29,700.00
625.00
771.00
12,000.00
9,000.00
1,000.00
825.00
24,221.00
24,200.00
4,062.50
8,000.00
4,500.00

T
E
R
A
N

50,000.00
55,000.00

500.00
550.00
17,612.50
17,600.00

bata ad. 1 PC : 2 PP

40,000.00
45,000.00
50,000.00
55,000.00

32,200.00
23,687.50
4,883.00
12,000.00
4,500.00
500.00
825.00
78,595.50
78,500.00

bata ad. 1 PC : 3 PP

40,000.00
45,000.00
50,000.00
55,000.00

32,200.00
17,962.50
5,140.00
12,000.00
4,500.00
500.00
825.00
73,127.50
73,100.00

bata ad. 1 PC : 4 PP

40,000.00
45,000.00
50,000.00
55,000.00

32,200.00
14,375.00
5,525.50
12,000.00
4,500.00
500.00
825.00
69,925.50
69,900.00

bata ad. 1 PC : 5 PP

40,000.00
45,000.00
50,000.00
55,000.00

32,200.00
12,100.00
5,782.50
12,000.00
4,500.00
500.00
825.00
67,907.50
67,900.00

bata ad. 1 PC : 6 PP

40,000.00
45,000.00
50,000.00
55,000.00

32,200.00
10,400.00
6,296.50
12,000.00
4,500.00
500.00
825.00
66,721.50
66,700.00

bata ad. 1 PC : 8 PP

40,000.00
45,000.00
50,000.00
55,000.00

32,200.00
8,125.00
6,425.00
12,000.00
4,500.00
500.00
825.00
64,575.00
64,500.00

1 bata ad. 1 PC : 3 PP

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

64,400.00
41,187.50
11,693.50
26,000.00
9,000.00
1,000.00
1,650.00
154,931.00
154,900.00
37,900.00
93,548.00
6,468.00
14,000.00
6,750.00
750.00
990.00
160,406.00
160,400.00
30,325.00
99,202.00
6,468.00
14,000.00
6,750.00
750.00
990.00
158,485.00
158,400.00
28,425.00
70,675.00
6,468.00
12,800.00
5,400.00
600.00
880.00
125,248.00
125,200.00

P
E
K
E
R
J
A
A
N
P
A
S
A
N
G
A
N
D
I
N
D
I
N
G

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

22,750.00
74,787.00
6,468.00
12,800.00
5,400.00
600.00
880.00
123,685.00
123,600.00
18,950.00
46,774.00
6,468.00
12,000.00
4,500.00
500.00
825.00
90,017.00
90,000.00
15,162.50
49,858.00
6,468.00
12,000.00
4,500.00
500.00
825.00
89,313.50
89,300.00

m, ad. 1 PC : 3 PP

40,000.00
45,000.00
50,000.00
55,000.00

167,500.00
17,500.00
4,112.00
12,000.00
4,500.00
500.00
825.00
206,937.00
206,900.00

m, ad. 1 PC : 4 PP

40,000.00
45,000.00
50,000.00
55,000.00

167,500.00
13,750.00
4,497.50
12,000.00
4,500.00
500.00
825.00
203,572.50
203,500.00

4) cm, ad. 1 PC : 3 PP
-

D
I
N
G

40,000.00
45,000.00
50,000.00
55,000.00

17,500.00
4,112.00
12,000.00
6,750.00
750.00
825.00
41,937.00
41,900.00

) cm, w/c = 0,87

40,000.00
45,000.00
50,000.00
55,000.00

308,750.00
102,417.86
122,100.00
3,225.00
66,000.00
12,375.00
1,400.00
4,565.00
620,832.86
620,800.00

) cm, w/c = 0,78

40,000.00
45,000.00
50,000.00
55,000.00

345,000.00
97,585.71
123,688.89
3,225.00
66,000.00
12,375.00
1,400.00
4,565.00
653,839.60
653,800.00

2) cm, w/c = 0,72

373,750.00
94,167.86
124,300.00
3,225.00
40,000.00
66,000.00
45,000.00
12,375.00
50,000.00
1,400.00
55,000.00
4,565.00
679,782.86
679,700.00
ump (3-6) cm, w/c = 0,87
287,500.00
75.18
92.98
3,000.00
40,000.00
48,000.00
45,000.00
9,000.00
50,000.00
1,000.00
55,000.00
3,300.00
351,968.16
351,900.00
2) cm, w/c = 0,66
407,500.00

40,000.00
45,000.00
50,000.00
55,000.00

63.98
93.16
3,225.00
66,000.00
12,375.00
1,400.00
4,565.00
495,222.14
495,200.00

2) cm, w/c = 0,61

40,000.00
45,000.00
50,000.00
55,000.00

440,000.00
86,153.57
126,011.11
3,225.00
66,000.00
12,375.00
1,400.00
4,565.00
739,729.68
739,700.00

2) cm, w/c = 0,58

40,000.00
45,000.00
50,000.00
55,000.00

463,750.00
82,264.29
127,966.67
3,225.00
66,000.00
12,375.00
1,400.00
4,565.00
761,545.95
761,500.00

2) cm, w/c = 0,56

40,000.00
45,000.00
50,000.00
55,000.00

480,000.00
81,675.00
126,988.89
3,225.00
66,000.00
12,375.00
1,400.00
4,565.00
776,228.89
776,200.00

) cm, w/c = 0,53

40,000.00
45,000.00
50,000.00
55,000.00

2) cm, w/c = 0,52

507,500.00
80,614.29
125,400.00
3,225.00
66,000.00
12,375.00
1,400.00
4,565.00
801,079.29
801,000.00

40,000.00
45,000.00
50,000.00
55,000.00

516,250.00
80,260.71
124,788.89
3,225.00
66,000.00
12,375.00
1,400.00
4,565.00
808,864.60
808,800.00

2) cm, w/c = 0,49

40,000.00
45,000.00
50,000.00
55,000.00

548,750.00
78,964.29
122,955.56
3,225.00
84,000.00
15,750.00
1,750.00
5,775.00
861,169.84
861,100.00

2) cm, w/c = 0,48

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

560,000.00
78,610.71
122,222.22
3,225.00
84,000.00
15,750.00
1,750.00
5,775.00
871,332.94
871,300.00
500,000.00
79,200.00
132,000.00
3,150.00
84,000.00
15,750.00
1,750.00
5,775.00
821,625.00
821,600.00
2,400.00
1,350.00
150.00
165.00
4,065.00
4,000.00
-

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

2,800.00
1,575.00
200.00
220.00
4,795.00
4,700.00
3,200.00
1,800.00
200.00
220.00
5,420.00
5,400.00

40,000.00
45,000.00
50,000.00
55,000.00

126,000.00
3,075.00
2,800.00
3,150.00
350.00
220.00
135,595.00
135,500.00

40,000.00
45,000.00
50,000.00
55,000.00

126,000.00
2,050.00
2,000.00
2,250.00
250.00
165.00
132,715.00
132,700.00

40,000.00
45,000.00
50,000.00
55,000.00

1,025.00
1,000.00
1,125.00
100.00
55.00
3,305.00
3,300.00

40,000.00
45,000.00
50,000.00
55,000.00

96,800.00
5,850.00
1,155.00
20,800.00
11,700.00
1,300.00
1,430.00
139,035.00
139,000.00
108,900.00
5,850.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

1,155.00
20,800.00
11,700.00
1,300.00
1,430.00
151,135.00
151,100.00
96,800.00
7,800.00
2,310.00
47,850.00
48,475.00
59,400.00
26,400.00
14,850.00
1,650.00
1,815.00
307,350.00
307,300.00
96,800.00
7,800.00
2,310.00
57,420.00
48,475.00
59,400.00
26,400.00
14,850.00
1,650.00
1,815.00
316,920.00
316,900.00
96,800.00
7,800.00
2,310.00
47,850.00
48,475.00
178,200.00
26,400.00
14,850.00
1,650.00
1,815.00
426,150.00
426,100.00
72,600.00
7,800.00
2,310.00
63,800.00
48,475.00
89,100.00
80,000.00

P
E
K
E
R
J
A
A
N
B
E
T
O
N

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

26,400.00
14,850.00
1,650.00
1,815.00
408,800.00
408,800.00
72,600.00
7,800.00
1,732.50
47,850.00
48,475.00
59,400.00
26,400.00
14,850.00
1,650.00
1,815.00
282,572.50
282,500.00
63,888.00
11,700.00
14,850.00
6,000.00
2,250.00
250.00
440.00
99,378.00
99,300.00
484,000.00
29,250.00
4,620.00
1,890,000.00
46,125.00
420,000.00
89,100.00
133,650.00
212,000.00
12,375.00
58,500.00
47,250.00
13,100.00
14,575.00
3,454,545.00
3,454,500.00
653,400.00
39,000.00
6,930.00
2,520,000.00
61,500.00
420,000.00
89,100.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

133,650.00
226,000.00
12,375.00
70,200.00
63,000.00
16,150.00
15,565.00
4,326,870.00
4,326,800.00
968,000.00
78,000.00
23,100.00
2,520,000.00
92,250.00
420,000.00
89,100.00
133,650.00
478,500.00
484,750.00
594,000.00
282,000.00
12,375.00
74,250.00
94,500.00
20,150.00
19,415.00
6,384,040.00
6,384,000.00
968,000.00
78,000.00
23,100.00
3,780,000.00
92,250.00
420,000.00
89,100.00
133,650.00
478,500.00
484,750.00
594,000.00
282,000.00
12,375.00
74,250.00
94,500.00
20,150.00
19,415.00
7,644,040.00
7,644,000.00
774,400
62,400
18,480
2,520,000

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

61,500.00
420,000.00
89,100.00
133,650.00
446,600.00
387,800.00
475,200.00
254,000.00
12,375.00
74,250.00
63,000.00
16,650.00
17,490.00
5,826,895.00
5,826,800.00
774,400.00
62,400.00
18,480.00
1,890,000.00
46,125.00
420,000.00
89,100.00
133,650.00
382,800.00
387,800.00
950,400.00
212,000.00
12,375.00
58,500.00
47,250.00
13,250.00
14,575.00
5,513,105.00
5,513,100.00
580,800.00
62,400.00
18,480.00
1,890,000.00
46,125.00
420,000.00
89,100.00
133,650.00
510,400.00
387,800.00
712,800.00
212,000.00
12,375.00
58,500.00
47,250.00
13,100.00
14,575.00
5,209,355.00

5,209,300.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
45,000.00
45,000.00
50,000.00
55,000.00

605,000.00
58,500.00
13,860.00
2,520,000.00
61,500.00
420,000.00
89,100.00
133,650.00
334,950.00
346,250.00
415,800.00
226,000.00
12,375.00
70,200.00
63,000.00
16,150.00
15,565.00
5,401,900.00
5,401,900.00
4,840.00
195.00
36,000.00
922.50
5,000.00
990.00
1,485.00
7,200.00
900.00
900.00
900.00
300.00
495.00
60,127.50
60,100.00
7,260.00
390.00
43,200.00
1,025.00
6,875.00
1,485.00
2,475.00
11,880.00
1,485.00
1,485.00
1,485.00
500.00
825.00
80,370.00
80,300.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

173,000.00
7,500.00
1,285.00
40,000.00
67,500.00
75,000.00
8,800.00
373,085.00
373,000.00
1,617,000.00
485,100.00
7,500.00
1,285.00
40,000.00
45,000.00
5,000.00
5,500.00
2,206,385.00
2,206,300.00
75,000.00
9,000.00
7,500.00
1,285.00
48,000.00
65,250.00
7,500.00
5,500.00
219,035.00
219,000.00
72,000.00
121,500.00
27,000.00
6,050.00
226,550.00
226,500.00
184
150,000
38,550
10,200
240,000
135,000
15,000
16,500
605,434.00
605,400.00
131,000

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

26,200
3,375
37,500
13,750
211,825.00
211,800.00
2,160,760.00
1,440,000.00
40,560.00
###
1,940,932.00
140,000.00
202,500.00
45,000.00
49,500.00
###
###
120,000.00
202,500.00
45,000.00
49,500.00
417,000.00
417,000.00
850.00
1,670.50
946.00
2,400.00
1,350.00
150.00
137.50
7,504.00
7,500.00
1,087.50
1,799.00
1,204.00
3,200.00
1,800.00
200.00
385.00
9,675.50
9,600.00
44,000.00
12.42
4,900.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

7,196.00
2,064.00
5,600.00
3,150.00
350.00
385.00
67,657.42
67,600.00
44,000.00
12.42
4,900.00
7,196.00
2,064.00
5,600.00
3,150.00
350.00
385.00
67,657.42
67,600.00
189,200.00
253.00
12,875.00
7,838.50
5,934.00
15,200.00
8,550.00
950.00
3,795.00
244,595.50
244,500.00

inggi 35 cm

40,000.00
45,000.00
50,000.00
55,000.00

66.70
55,000.00
8,995.00
11,550.00
19,200.00
9,900.00
128,000.00
45,675.00
75.00
880.00
279,341.70
279,300.00

inggi 50 cm

40,000.00
45,000.00

115.00
96,250.00
16,705.00
3,300.00
31,200.00
14,850.00
56,800.00
21,285.00

50,000.00
55,000.00

2,350.00
3,905.00
246,760.00
246,700.00

inggi 65 cm

40,000.00
45,000.00
45,000.00
50,000.00
55,000.00

170.66
142,500.00
23,644.00
5,445.00
58,200.00
19,800.00
86,400.00
32,400.00
4,500.00
3,600.00
5,940.00
382,599.66
382,500.00

40,000.00
45,000.00
50,000.00
55,000.00

18,623.62
5,431.89
2,160.00
4,050.00
450.00
1,485.00
32,200.50
32,200.00

40,000.00
45,000.00
50,000.00
55,000.00

27,935.42
8,147.83
2,160.00
4,050.00
450.00
1,485.00
44,228.26
44,200.00

40,000.00
45,000.00
50,000.00
55,000.00

37,247.23
13,036.53
2,160.00
4,050.00
450.00
1,485.00
58,428.76
58,400.00

40,000.00
45,000.00
50,000.00
55,000.00

60,720.75
21,252.26
4,320.00
8,100.00
900.00
297.00
95,590.01
95,500.00

40,000.00
45,000.00
50,000.00
55,000.00

64,600.00
22,610.00
4,320.00
8,100.00
900.00
297.00
100,827.00
100,800.00

40,000.00
45,000.00
50,000.00
55,000.00

103,800.00
36,330.00
5,400.00
10,125.00
1,125.00
374.00
157,154.00
157,100.00

40,000.00
45,000.00
50,000.00
55,000.00

27,600.00
9,660.00
1,440.00
2,700.00
300.00
99.00
41,799.00
41,700.00

40,000.00
45,000.00
50,000.00
55,000.00

13,800.00
4,830.00
1,440.00
2,700.00
300.00
99.00
23,169.00
23,100.00

40,000.00
45,000.00
50,000.00
55,000.00

13,800.00
4,830.00
1,440.00
2,700.00
300.00
99.00
23,169.00
23,100.00

40,000.00
45,000.00
50,000.00
55,000.00

27,600.00
9,660.00
1,440.00
2,700.00
300.00
99.00
41,799.00
41,700.00

40,000.00
45,000.00
50,000.00
55,000.00

34,500.00
12,075.00
2,160.00
4,050.00
450.00
148.50
53,383.50
53,300.00

40,000.00
45,000.00
50,000.00
55,000.00

45,000.00
15,750.00
1,440.00
2,700.00
300.00
99.00
65,289.00
65,200.00

40,000.00
45,000.00
50,000.00
55,000.00

62,100.00
21,735.00
3,240.00
6,075.00
675.00
225.50
94,050.50
94,000.00

40,000.00
45,000.00
50,000.00
55,000.00

96,900.00
33,915.00
3,240.00
6,075.00
675.00
225.50
141,030.50
141,000.00

40,000.00
45,000.00
50,000.00
55,000.00

115,500.00
40,425.00
3,240.00
6,075.00
675.00
225.50
166,140.50
166,100.00

40,000.00
45,000.00
50,000.00
55,000.00

46,000.00
259.53
400.00
4,500.00
500.00
275.00
51,934.53
51,900.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

46,000.00
400.00
4,500.00
500.00
275.00
51,675.00
51,600.00
3,680.00
4,845.00
6,086.00
9,308.00
2,800.00
405.00
300.00
137.50
27,561.50
27,500.00
920.00
1,900.00
4,940.00
800.00
2,835.00
315.00
137.50
11,847.50
11,800.00

40,000.00
45,000.00
50,000.00
55,000.00

29,437.50
690.00
4,000.00
4,500.00
500.00
275.00
39,402.50
39,400.00

40,000.00
45,000.00
50,000.00
55,000.00

31,680.00
230.00
1,200.00
3,150.00
350.00
220.00
36,830.00
36,800.00

40,000.00
45,000.00
50,000.00
55,000.00

2,530.00
4,000.00
2,250.00
250.00
275.00

9,305.00
9,300.00

40,000.00
45,000.00
50,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

177,650.00
1,873,200.00
480,000.00
54,000.00
10,000.00
2,594,850.00
2,594,800.00
3,509,000.00
109,200.00
96,000.00
324,000.00
36,000.00
6,600.00
4,080,800.00
4,080,800.00
32,340.00
11,430.00
4,875.00
4,000.00
4,500.00
500.00
275.00
57,920.00
57,900.00
32,340.00
22,860.00
4,875.00
4,000.00
4,500.00
500.00
275.00
69,350.00
69,300.00
381,150.00
3,900.00
4,800.00
5,400.00
600.00
330.00
396,180.00
396,100.00
35,574.00

40,000.00
45,000.00
50,000.00
55,000.00

3,900.00
6,000.00
13,500.00
1,500.00
4,125.00
64,599.00
64,500.00

40,000.00
45,000.00
50,000.00
55,000.00

37,653.00
4,875.00
8,000.00
13,500.00
1,500.00
550.00
66,078.00
66,000.00

40,000.00
45,000.00
50,000.00
55,000.00

37,422.00
1,950.00
4,000.00
9,000.00
1,000.00
275.00
53,647.00
53,600.00

40,000.00
45,000.00
50,000.00
55,000.00

9,712.50
195.00
2,000.00
2,250.00
250.00
165.00
14,572.50
14,500.00

40,000.00
45,000.00
50,000.00
55,000.00

235,620.00
3,900.00
8,000.00
4,500.00
500.00
55.00
252,575.00
252,500.00

40,000.00
45,000.00
50,000.00
55,000.00

180,400.00
975.00
10,000.00
6,750.00
750.00
715.00
199,590.00
199,500.00
54,060.00

40,000.00
45,000.00
50,000.00
55,000.00

9,100.00
12,100.00
16,500.00
24,100.00
54,800.00

40,000.00
45,000.00
50,000.00
55,000.00

40,000.00
45,000.00
50,000.00
55,000.00

13,000.00
5,782.50
9,234.00
28,000.00
15,750.00
1,750.00
1,925.00
129,501.50
129,500.00
73,326.00
63,630.00
9,696.00
22,119.00
3,211.39
1,422.96
1,940.40
1,417.08
3,222.24
1,446.48
554.40
2,024.80
600.00
179,985.07
179,900.00
3,828,000.00
24,375.00
240,000.00
810,000.00
90,000.00
16,500.00
5,008,875.00
5,008,800.00
86,625.00
585.00
150,000.00
69,250.00
34,000.00
114,750.00
12,750.00
2,365.00
470,325.00
470,300.00

RENCANA ANGGARAN BIAYA


Program
Lokasi
Tahun
Jenis Kegiatan

NO.

:
:
:
:

SANITASI BERBASIS MASYARAKAT


KP. SUMUR AMPAR DESA BANYUWANGI
2011
PEMBANGUNAN SARANA SANITASI MASYARAKAT

URAIAN PEKERJAAN

SAT.

VOLUME

HARGA
SATUAN
(Rp.)

PEKERJAAN PERSIAPAN

1
2

Pengukuran Kembali lahan


Pengukuran dan Pasang Bouwplank

m2
M'

58.50
28.65

1,650.00
54,300.00

Pembersihan lahan
Penyediaan Pompa Kerja
Pelaporan dan dokumentasi

m2
ls
ls

58.50
1.00
1.00

1,250.00
1,500,000.00
1,000,000.00

3
4
5
Jumlah
II
2.1.

PEKERJAAAN TOILET
Pekerjaan Tanah Dan Pondasi

1
2

Galian Tanah Untuk Pondasi


Urugan Tanah kembali

3
4

Pemadatan Tanah (per 20 cm)


Urugan Pasir Bawah Pondasi + lantai

5
6

Pas. Pondasi Rolaag


Pek. Pasangan Batu kosong

Pek. Pondasi Batu Kali ad. 1:4

14.65
3.66

31,300.00
4,500.00

8.64
2.79

22,700.00
115,700.00

m3
m3

2.79

69,900.00
256,300.00

6.70

538,500.00

m3

0.98
0.35
0.72
16.00
14.55

4,326,800.00
6,384,000.00
5,826,800.00
60,100.00
80,300.00

0.86
83.29
166.58

5,513,100.00
69,900.00
31,200.00

24.00

129,500.00
143,700.00

41.18

179,900.00

2
3

Pas. Genteng Plentong Morando


Pek. Bubungan Plentong Morando

m2
m2
m'

41.18
7.20

52,700.00
68,700.00

4
5

Pas. Plafond Gypsum 9mm berikut rangka kayu meran m2


List Profil
m'

36.72
95.66

2.2.
1
2
3
4
4
5
6

Pek. Balok + Plat Beton Bertulang


Pas. Dinding 1/2 Bata
Plesteran dinding ad. 1:4 + Acian

7
8

Pas. Keramik Lantai 20x20


Pas. Keramik Dinding 20x20

2.3.
1
2

Sloof Beton bertulang 15/20 cm


Kolom Beton bertulang 15x15 cm
Ringbalk Beton bertulang 15/20 cm
Kolom praktis Beton bertulang 11 x 11 cm
Balok Beton bertulang 10 x 15 cm

Pekerjaan Atap dan Plafond


Pek. Rangka Atap Baja Ringan

Pekerjaan Pintu, Jendela dan Ventilasi


Kusen Pintu Kayu Klass II
Daun Pintu Double Teakwood Lapis Formika

3
4

Daun Pintu Doble teakwood


Pas. Rooster uk. 20x20 cm

Pas. Glass block uk. 20x20 cm

2.4.
1
2
3
4
5

m3
m3
m3
m2

Pekerjaan Lantai, Dinding Dan Beton


Pek.
Pek.
Pek.
Pek.
Pek.

3.3.
1

m3

Pekerjaan Kunci, Alat Gantung dan Kaca


Pasang Kunci Kualitas baik
Pasang Engsel Pintu
Pasang Engsel Jendela
Pasang Kunci Slot
Pasang Kaca Bening t. 5mm

m3
m3
m'
m'
m3
m2
m2
m2
m2

m3
m2
m2

0.17
8.40

5,008,800.00
470,300.00

m2
m2

2.40

203,500.00

buah
buah
buah
buah
buah

6.00
18.00

Jumlah
VI
1

PEKERJAAN RUMAH POMPA


Pas. Dinding 1/2 bata

m2
m2

2
3
4
5
Jumlah

Plesteran dinding ad. 1:4 + Acian


Pek. Plat Beton bertulang Penutup t.10cm
Pas. Pintu Besi begel + besi siku
Pas. Kunci Gembok

m3
ls
buah

VII
1
Jumlah

PEKERJAAN BAK KONTROL


Memasang Bak kontrol Pas. Bata uk. 30x30 cm

unit

VIII
8.1.

PEKERJAAN IPAL BIO FILTER


Pekerjaan Tanah dan Pondasi

1
2

Galian Tanah
Urugan tanah kembali

Urugan Pasir

37.38
9.34

45,600.00
4,500.00

1.63

115,700.00

m2

16.25

351,900.00

Pekerjaan Pengadaan IPAL


Bio-filter

unit

1.00

55,000,000.00

IX
9.1.
1
2
3

PEKERJAAN INSTALASI AIR


Alat Saniter
Pas. Closet Jongkok setara TOTO
Pas. Kran Tembok
Pas. Floor drain

unit
buah
buah

4.00
10.00
7.00

373,000.00
51,900.00
51,600.00

9.2.
1
2

Air Bersih
Pas. Pipa dia. 1" AW
Pas. Pipa dia. 1/2" AW

m'
m'

22.50
10.00

23,100.00
41,700.00

9.3
1
2

Air kotor
Pas. Pipa dia. 3" AW
Pas. Pipa dia. 4" AW

m'
m'

12.00
33.35

94,000.00
141,000.00

9.4
1
2

Saluran Pembuangan
Pek. Galian Tanah
Pek. Urugan Tanah Kembali

11.00
6.00
1.00
1.00
9.00
1.00

115,500.00
13,800.00
17,300.00
15,000.00
33,000.00
242,500.00

m2

166.58

11,800.00

m2
m2
m2

36.72
3.83

11,800.00
27,500.00

8.2.
1
8.3.
1
Jumlah

3
4
Jumlah
X
1
2
3
4
5
6

m3
m3
m3

Pekerjaan Lantai, Dinding Dan Beton


Lantai Kerja t. 10 cm

Pek. Urugan Pasir


Pas. Pipa dia. 4" AW

PEKERJAAN INSTALASI LISTRIK


Instalasi Titik
Pas. Saklar Tunggal
Pas. Saklar Ganda
Pas. Stop kontak
Pas. Lampu Sl 18 watt
Pas. Lampu Taman Lengkap Tiang

m3
m3
m3
m'

titik
buah
buah
buah
buah
unit

Jumlah
XI
1

PEKERJAAN PENGECATAN
Pek. Pengecatan Tembok Toilet

2
3

Pek. Pengecatan Plafond dgn cat tembok


Pek. Pengecatan List Profil dgn cat kayu

4
Jumlah

Pek. Pengecatan Dak Beton dengan Water proofing

7.17

XII
1
2
3
Jumlah
XIII
1
2
3

PEKERJAAN LANDSCAPE
Penanaman Rumput gajah mini
Pas. Pagar BRC tinggi 90 cm lengkap tiang

m2

Pek. Pasang Paving block t. 6 cm

m2
m2

PEKERJAAN LAIN-LAIN
As-Buildt Drawing
Commisioning Test
Pembersihan dan Penyempurnaan Pekerjaan

ls
ls
ls

19.31
20.39

9,000.00
258,000.00

9.22

1.00
1.00
1.00

1,000,000.00
1,500,000.00
500,000.00

JUMLAH
HARGA
(Rp.)

96,525.00
1,555,695.00
73,125.00
1,500,000.00
1,000,000.00
4,225,345.00

458,466.75
16,478.44
196,128.00
322,803.00
715,077.00
3,605,796.00

4,225,120.20
2,226,420.00
4,169,075.40
961,600.00
1,168,365.00
4,744,711.69
5,822,026.92
5,197,345.92
3,108,000.00
-

7,407,994.16
2,170,101.68
494,640.00
-

865,520.64
3,950,520.00
488,400.00
-

52,314,590.80

1,704,300.00
42,046.88
188,012.50

5,718,375.00

55,000,000.00
62,652,734.38

1,492,000.00
519,000.00
361,200.00

519,750.00
417,000.00

1,128,000.00
4,702,350.00

9,139,300.00

1,270,500.00
82,800.00
17,300.00
15,000.00
297,000.00
242,500.00
1,925,100.00

1,965,662.88
433,296.00
105,226.00
2,504,184.88

173,745.00
5,259,330.00
5,433,075.00

1,000,000.00
1,500,000.00
500,000.00
3,000,000.00

NO

URAIAN PEKERJAAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

1m' Pagar Sementara dari kayu tinggi 2 meter


1m' Pagar Sementara dari seng gelombang tinggi 2 meter
1m' Pagar Sementara dari kawat duri tinggi 1,8 meter
1m' Pengukuran dan Pemasangan Bouwplank
1m' Pembuatan Kantor sementara, dengan lantai plesteran
1m' Pembuatan Gudang Semen dan alat-alat
1m' Pembuatan Gudang Semen dan alat-alat
1m Pembuatan Bedeng Buruh
1m Pembuatan bak adukan ukuran (40 x 50 x 20) cm
1m Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm
1m Pembuatan Jalan sementara
1m Bongkaran beton bertulang
1m Bongkaran dinding Tembok Bata Merah
1m' Pasang Pagar kawat jaring galvanis, tinggi 1,00 m
1m' Pasang Pagar beton pracetak (5 x 50 x 213) cm
Menggali 1m tanah biasa sedalam 1 meter
Menggali 1m tanah biasa sedalam 2 meter
Menggali 1m tanah biasa sedalam 3 meter
Menggali 1m tanah keras sedalam 1 meter
Menggali 1m tanah cadas sedalam 1 meter
Menggali 1m tanah lumpur sedalam 1 meter
Menggali 1m2 striping tebing setinggi 1 meter
Membuang 1m tanah sejauh 15 meter
Mengurug Kembali 1m galian
Memadatkan 1 m tanah (per 20 cm)
Mengurug 1m pasir
Mengurug 1m Batu apung
Mengurug 1m batu kali bulat
Memasang 1 m lapisan Ijuk Tebal 10 cm, untuk bidang resapan
Mengurug 1m kerikil ayak tanpa pasir
Mengurug 1m Kerikil Pecah Besar
Memasang 1 m Sirtu padat untuk peninggian lantai bangunan
Memasang 1 m Batu Kosong (Aanstamping)
Memasang 1 m pondasi siklop, 60% beton campuran 1 PC : 2 PB :
3 KR dan 40% batu belah
Memasang 1 m pondasi batu belah, campuran 1 PC : 3 PP
Memasang 1 m pondasi batu belah, campuran 1 PC : 4 PP
Memasang 1 m pondasi batu belah, campuran 1 PC : 5 PP
Memasang 1 m pondasi batu belah, campuran 1 PC : 6 PP
Memasang 1 m pondasi batu belah, campuran 1 PC : 8 PP
Memasang 1 m pondasi sumuran, diameter 100 cm
Memasang 1 m Plesteran 1 PC : 1 PP, tebal 15 mm
Memasang 1 m Plesteran 1 PC : 2 PP, tebal 15 mm
Memasang 1 m Plesteran 1 PC : 3 PP, tebal 15 mm
Memasang 1 m Plesteran 1 PC : 4 PP, tebal 15 mm
Memasang 1 m Plesteran 1 PC : 5 PP, tebal 15 mm
Memasang 1 m Plesteran 1 PC : 6 PP, tebal 15 mm
Memasang 1 m Plesteran 1 PC : 7 PP, tebal 15 mm
Memasang 1 m Plesteran 1 PC : 8 PP, tebal 15 mm
Memasang 1 m berapen 1 PC : 5 PP, tebal 15 mm
Memasang 1 m Plesteran Skoning 1 PC : 2 PP, lebar 10 mm
Memasang 1 m Plesteran Ciprat 1 PC : 2 PP
Memasang 1 m Finishing Siar Pasangan Dinding Bata Merah
(=20m')

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

HARGA
SATUAN (Rp)
248,300.00
279,600.00
2,221,200.00
54,300.00
955,600.00
776,300.00
931,100.00
1,142,900.00
135,200.00
35,900.00
83,000.00
284,900.00
284,900.00
4,200.00
31,300.00
38,400.00
45,600.00
41,700.00
63,300.00
50,400.00
2,200.00
13,700.00
4,500.00
22,700.00
115,700.00
289,700.00
98,300.00
75,800.00
111,500.00
111,500.00
128,900.00
256,300.00
2,174,400.00
416,400.00
538,500.00
507,800.00
486,200.00
456,700.00
548,100.00
41,700.00
35,600.00
33,000.00
31,200.00
30,100.00
29,300.00
28,800.00
28,300.00
20,000.00
25,700.00
23,900.00
21,700.00

53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

Memasang 1 m Finishing Siar Pasangan Dinding Conblock


ekspose (=8m')
Memasang 1 m Finishing Siar Pasangan Batu kali adukan 1 PC : 2
PP
Memasang 1 m Plesteran waterproof batacote 3 lapis
Memasang 1 m Acian
Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal
bata ad. 1 PC : 2 PP
Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal
bata ad. 1 PC : 3 PP
Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal
bata ad. 1 PC : 4 PP
Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal
bata ad. 1 PC : 5 PP
Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal
bata ad. 1 PC : 6 PP
Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal
bata ad. 1 PC : 8 PP
Memasang 1 m dinding bata merah uk. (5 x 11 x 22) cm tebal 1
bata ad. 1 PC : 3 PP
Memasang 1 m dinding HB/CB 20, ad. 1 PC : 3 PP
Memasang 1 m dinding HB/CB 20, ad. 1 PC : 4 PP
Memasang 1 m dinding HB/CB 15, ad. 1 PC : 3 PP
Memasang 1 m dinding HB/CB 15, ad. 1 PC : 4 PP
Memasang 1 m dinding HB/CB 10, ad. 1 PC : 3 PP
Memasang 1 m dinding HB/CB 10, ad. 1 PC : 4 PP
Memasang 1 m dinding terawang (roster) uk. (12 x 11 x 24) cm, ad.
1 PC : 3 PP
Memasang 1 m dinding terawang (roster) uk. (12 x 11 x 24) cm, ad.
1 PC : 4 PP
Memasang 1 m dinding bata berongga ekspose uk. (5 x 11 x 24)
cm, ad. 1 PC : 3 PP
membuat 1 m beton mutu f'c = 7,4 Mpa (K 100), slump (12 2) cm,
w/c = 0,87
membuat 1 m beton mutu f'c = 9,8 Mpa (K 125), slump (12 2) cm,
w/c = 0,78
membuat 1 m beton mutu f'c = 12,2 Mpa (K 150), slump (12 2)
cm, w/c = 0,72
membuat 1 m lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump
(3-6) cm, w/c = 0,87
membuat 1 m beton mutu f'c = 14,5 Mpa (K 175), slump (12 2)
cm, w/c = 0,66
membuat 1 m beton mutu f'c = 16,9 Mpa (K 200), slump (12 2)
cm, w/c = 0,61
membuat 1 m beton mutu f'c = 19,3 Mpa (K 225), slump (12 2)
cm, w/c = 0,58
membuat 1 m beton mutu f'c = 21,7 Mpa (K 250), slump (12 2)
cm, w/c = 0,56
membuat 1 m beton mutu f'c = 24 Mpa (K 275), slump (12 2) cm,
w/c = 0,53
membuat 1 m beton mutu f'c = 26,4 Mpa (K 300), slump (12 2)
cm, w/c = 0,52
membuat 1 m beton mutu f'c = 28,8 Mpa (K 325), slump (12 2)
cm, w/c = 0,49
membuat 1 m beton mutu f'c = 31,2 Mpa (K 350), slump (12 2)
cm, w/c = 0,48
membuat 1 m beton kedap air dengan strotox - 100

6,700.00
29,700.00
24,200.00
17,600.00
78,500.00
73,100.00
69,900.00
67,900.00
66,700.00
64,500.00
154,900.00
160,400.00
158,400.00
125,200.00
123,600.00
90,000.00
89,300.00
206,900.00
203,500.00
41,900.00
620,800.00
653,800.00
679,700.00
351,900.00
495,200.00
739,700.00
761,500.00
776,200.00
801,000.00
808,800.00
861,100.00
871,300.00
821,600.00

membuat 1 m' PVC waterstop lebar 150 mm


membuat 1 m' PVC waterstop lebar 200 mm
membuat 1 m' PVC waterstop lebar 230 mm - 320 mm
Pembesian 10 kg dengan besi polos/ulir
Pembesian 10 kg kabel presstressed polos/strands
Memasang 1 m bekisting untuk pondasi
Memasang 1 m bekisting untuk sloof
Memasang 1 m bekisting untuk kolom
Memasang 1 m bekisting untuk balok
Memasang 1 m bekisting untuk lantai
Memasang 1 m bekisting untuk dinding
Memasang 1 m bekisting untuk tangga
Memasang 1 m jembatan untuk pengecoran beton
Membuat 1 m pondasi beton bertulang (150 kg besi + bekisting)
Membuat 1 m sloof beton bertulang (200 kg besi + bekisting)
Membuat 1 m kolom beton bertulang (200 kg besi + bekisting)
Membuat 1 m kolom beton bertulang (300 kg besi + bekisting)
Membuat 1 m balok beton bertulang (200 kg besi + bekisting)
Membuat 1 m plat beton bertulang (150 kg besi + bekisting)
Membuat 1 m dinding beton bertulang (150 kg besi + bekisting)
Membuat 1 m dinding beton bertulang (200 kg besi + bekisting)
Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
Membuat 1 m' ringbalk beton bertulang (10 x 15) cm
Memasang 1 buah kloset jongkok porselen
Memasang 1 buah urinoir
Memasang 1 buah washtafel
Memasang 1 buah bak mandi fiberglass vol. 0.30 m
Memasang 1 buah bak mandi batu bata vol. 0.30 m
Memasang 1 buah bak mandi fiberglass vol. 0.30 m
Memasang 1 buah bak beton vol. 1 m air
Memasang 1 buah bak fiberglass vol. 1 m air
Memasang 1m' pipa penyalur air limbah jenis pipa tanah, dia. 15 cm
Memasang 1m' pipa penyalur air limbah jenis pipa tanah, dia. 20 cm
Memasang 1m' pipa beton, dia. 15 cm - 20 cm
Memasang 1m' pipa beton, dia. 15 cm - 20 cm
Memasang 1m' pipa beton, dia. 30 cm - 200 cm
Memasang 1 buah bak kontrol pas. Batu bata uk. (30x30) cm, tinggi
35 cm
Memasang 1 buah bak kontrol pas. Batu bata uk. (45x45) cm, tinggi
50 cm
Memasang 1 buah bak kontrol pas. Batu bata uk. (60x60) cm, tinggi
65 cm
Memasang 1m' pipa galvanis diameter "
Memasang 1m' pipa galvanis diameter "
Memasang 1m' pipa galvanis diameter 1"
Memasang 1m' pipa galvanis diameter 1"
Memasang 1m' pipa galvanis diameter 3"
Memasang 1m' pipa galvanis diameter 4"
Memasang 1m' pipa PVC tipe AW diameter "
Memasang 1m' pipa PVC tipe AW diameter "
Memasang 1m' pipa PVC tipe AW diameter 1"
Memasang 1m' pipa PVC tipe AW diameter 1"
Memasang 1m' pipa PVC tipe AW diameter 2"
Memasang 1m' pipa PVC tipe AW diameter 2"

4,000.00
4,700.00
5,400.00
135,500.00
132,700.00
139,000.00
151,100.00
307,300.00
316,900.00
426,100.00
408,800.00
282,500.00
99,300.00
3,454,500.00
4,326,800.00
6,384,000.00
7,644,000.00
5,826,800.00
5,513,100.00
5,209,300.00
5,401,900.00
60,100.00
80,300.00
373,000.00
2,206,300.00
219,000.00
226,500.00
605,400.00
211,800.00
21,787,200.00
417,000.00
7,500.00
9,600.00
67,600.00
67,600.00
244,500.00
279,300.00
246,700.00
382,500.00
32,200.00
44,200.00
58,400.00
95,500.00
100,800.00
157,100.00
41,700.00
23,100.00
23,100.00
41,700.00
53,300.00
65,200.00

Memasang 1m' pipa PVC tipe AW diameter 3"


Memasang 1m' pipa PVC tipe AW diameter 4"
Memasang 1m' pipa PVC tipe AW diameter 6"
Memasang 1 buah kran " atau "
Memasang 1 buah floor drain
1 m2 Pengecatan Kayu 2x
1 m2 Pengecatan Tembok 2x lapis penutup
Memasang 1 m2 langit-langit tripleks, tebal 3 mm, 4 mm, 6mm
Memasang 1 m3 Konstruksi gordeng, kayu kelas II
Memasang 1 m3 Rangka atap genteng, kayu kelas II
Memasang 1 m3 Rangka atap genteng beton, kayu kelas II
Memasang 1 m2 Rangka Atap Sirap, kayu kelas II
Memasang 1 m2 Rangka langit-langit (50 x 100) cm, kayu kelas II
dan III
Memasang 1 m2 Rangka langit-langit (60 x 60) cm, kayu kelas II
dan III
Memasang 1 m' Listplank uk. (3x20) cm, kayu kelas I atau kelas II
Memasang 1 m2 atap genteng plentong
Memasang 1 m2 atap genteng beton
Memasang 1 m' nok genteng plentong
Memasang 1 m' nok genteng beton
Memasang 1 m2 Lantai keramik 20x20 cm
Memasang 1 m2 Lantai keramik 30x30 cm
Memasang 1 m2 dinding keramik uk. (20 x 25) cm
Memasang 1 m2 Rangka Atap Baja Ringan

94,000.00
141,000.00
166,100.00
51,900.00
51,600.00
27,500.00
11,800.00
36,800.00
4,080,800.00
57,900.00
69,300.00
396,100.00
64,500.00
66,000.00
53,600.00
52,700.00
14,100.00
68,700.00
91,600.00
129,500.00
134,700.00
143,700.00
179,900.00

PERHITUNGAN VOLUME SUMUR AMPAR


No
1
2
3
4

Uraian Pekerjaan
Permbersihan lahan
Pengukuran dan pemasangan bouwplank
Pembersihan lahan
Galian Tanah pondasi

Panjang
6
32
6

Lebar
10
1
10

Tinggi
-

Luas
60
32
60

Volume
-

jumlah volume total


1
60
2
64
1
60