Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Position

Location
Reports to
Role

KRA
400/220/34.5/6.6 kV MSDS-1 of operation

Operation & Maintenance of SVC

KPI
Proper monitoring for 24x7 Hrs power supply
Fault finding, Analysis & Troubleshooting
maintaining shutdown & Energy records
Operation & Maintenance of SVC

Relay setting ,co-ordination and power system


studies

switchyard equipments & Transfomer checking regularly basis.


periodic (quaterly.halfyrly,annual) mainenance & switchyard
equipments & transformer
Relay setting & configuration checking regularly
Regular interval Relay setting

Erection ,testing&comissiong of 230mva


transformer

230 MVA Transformer erection, testing & Commissioning

periodic maintenance of all transformer


(315,120,20mva) & equipments

Ensure adherence to environmental norms

HOUSEKEEPING
Ensure adherence to Health & Safety Norms

Unit of measurement

Key Initiatives
*Key Strategic InitiativePlanning & Execution of electrical scada system jobs at project and operation
execute erection,commissioning & testing work as per requirement
*Efficiency & Quality at work
Coordination with departments to accomplish the task in given time stamp
Ensuring safety during work
*Cost reduction initiative for project work

Target date

Terminal Points of Responsibility


Covering All Electrical Scada System Jobs and Maintaining 24*7 power supply to all over the plant without fail

Weightage (TBD)

continuous
process

25

continuous
process

10

continuous
process

10

continuous
process

10

environmental normsNoise Pollution in Decibels in the zone


ISO 1400 Compliance
Dust removal & periodic cleaning of equipments & scrap
removal surrounding area
Maintainace of store yard, work place & maintaining 5S
Zero Fatalities
Zero Serious accidents
Zero Man Hour Loss due to injury

Target (TBD)

20/01/2014

15

continuous
process

10

continuous
process

10

continuous
process

10

You might also like