UP Stream Wing Wall and Return

Moments About A

Top Width =
Bottom width
Offset left Side =
Offset Right side =
Thickness of Fdn. =
Height of wall =
Total width of bot. Sla
Levels Top =
Level Intermediate =
Level Bottom =
Desity of Concrete =
Desity of Soil =
kv =
kh =

0.500
1.850
0.300
0.300
0.600
3.780
2.450
216.560
212.780
212.180
2.4
2.1

m
m
m
m
m
m
m
m
m
m
T/m3
T/m3

216.56

w3

w1
w2

A
w5

0.0385
0.1337

S.NO

Load

Value

1
2
3
4
5

w1
w2
w3
Pv
Ph

0.5x3.78x2.4=
0.5x1.35x3.78x2.4-=
0.5x1.35x3.78x2.1=
0.0385x2.1x3.78=
0.1337x2.1x3.78=

Force
4.536
6.124
5.358
1.155
4.012
17.173

Lever arm = M/F

21.246/17.173

1.237 m

e = eccentricity =

1.85/2-1.237=

0.312 m

e max =

Lever
arm
1.600
0.900
0.450
0.000
1.512

0.308 m

Stresses at A
Max =
Min =

w4

P=
P=

[ ]

F
6e
1+
b
b

F
6e
1
b
b

18.680 t/sq.m
-0.110 t/sq.m

Moment
7.258
5.511
2.411
0.000
6.066
21.246

212.78
212.18

UP Stream Wing Wall and Return


Moments About B

Top Width =
Bottom width
Offset left Side =
Offset Right side =
Thickness of Fdn. =
Height of wall =
Total width of bot. Sla
Levels Top =
Level Intermediate =
Level Bottom =
Desity of Concrete =
Desity of Soil =
kv =
kh =

0.500
1.850
0.300
0.300
0.600
4.380
2.450
216.560
212.780
212.180
2.4
2.1

m
m
m
m
m
m
m
m
m
m
T/m3
T/m3

216.56

w3

w1
w2

w5

0.0385
0.1337

S.NO

Load

Value

1
2
3
4
5
6
7

w1
w2
w3
w4
w5
Pv
Ph

0.5x4.38x2.4=
0.5x1.35x4.38x2.4-=
0.5x1.35x4.38x2.1=
0.3x4.38x2.1=
2.45x0.6x2.4=
0.0385x2.1x4.38=
0.1337x2.1x4.38=

Force
5.256
7.096
6.209
2.759
3.528
1.551
5.386
26.399

Lever arm = M/F

40.562/26.399

1.536 m

e = eccentricity =

2.45/2-1.536=

0.311 m

e max =

Lever
arm
1.900
1.200
0.750
0.150
1.225
0.000
2.352

0.408 m

Stresses at B
Max =
Min =

w4

P=
P=

[ ]

F
6e
1+
b
b

F
6e
1
b
b

18.980 t/sq.m
2.570 t/sq.m

Moment
9.986
8.515
4.657
0.414
4.322
0.000
12.668
40.562

212.78
212.18

Claculation of discharge for

100 %

Q=

16.768 Cumecs
D/s CBL 283.882

B.W =

9.450 m

Side slopes =

1.000 :1

285.115
1.0

Bed fall =

1 in

7000

1.800

1
283.315

Value of 'n' =

0.0180

Depth of flow =

9.450

1.800 m

Area =

20.250 m2

Perimeter =

14.541 m

R=

1.393 m

Velocity =

0.828 m/sec

Discharge =

16.768

Claculation of discharge for

>

16.768 Cumecs

75 %

Q=

12.576 Cumecs
D/s CBL =

B.W =

9.450 m

Side slopes =

1.000 :1

284.835
1.0

Bed fall =

1 in

7000

1.520

1
283.315

Value of 'n' =

0.018

Depth of flow =

1.520 m

Area =

16.674 m2

Perimeter =

13.749 m

9.450

R=

1.213 m

Velocity =

0.755 m/sec

Discharge =

12.591

>

12.576 Cumecs

Claculation of discharge for

50 %

Q=

8.384 Cumecs
D/s CBL

B.W =

9.450 m

Side slopes =

1.000 :1

0.000

284.515
1.0

Bed fall =

1 in

7000

1.200

1
283.315

Value of 'n' =

0.018

9.450

Depth of flow =

1.200 m

Area =

12.780 m2

Perimeter =

12.844 m

R=

0.995 m

Velocity =

0.662 m/sec

Discharge =

8.458

>

8.384 Cumecs

Considering 3/4 FSL condition


3/4 FSL level =

284.835

Centre of pipe from CBL =


Assuming dia of pipe as

283.765
0.300 m

Driving head =
Dia of pipe =
Q=

1.070 m
0.692 x [Q/h]1/2
Sill level
0.0044 Cumecs

D=

0.045 m say

H=

1.045 m

Q=

(sill level + 1/2 of dia of pipe)

1/2 FSL
1.070
0.15

0.300
283.615
0.3

284.835
283.765
283.315

0.350 m

0.26151
>
0.0044
Hence O.K

1/2 FSL
1.045
0.175

0.350
283.615
0.3

284.835
283.790
283.315

Considering 1/2 FSL condition


1/2 FSL level =

284.515

Centre of pipe from CBL =


Assuming dia of pipe as

283.765
0.300 m

Driving head =
Dia of pipe =
Q=

0.750 m
0.692 x [Q/h]1/2
Sill level
0.0044 Cumecs

D=

0.049 m say

H=

0.725 m

Q=

(sill level + 1/2 of dia of pipe)

1/2 FSL
0.750
0.15

0.300
283.615
0.3

284.515
283.765
283.315

0.350 m

0.21782
>
0.0044
Hence O.K

1/2 FSL
0.725
0.175

0.350
283.615
0.3

284.515
283.790
283.315