USD #364 Proposed Scope of Work

Phase I
Safe and Secure Buildings
MES

Learning Environment
MES

Preserve, Maintain, and/or Improve

Locker Room Storm Shelter


Fire and Smoke Alarm Improvements
Building Code and ADA
Improvements

Two additional Classrooms


One additional Computer Classroom
Enclose Stage for Music Classroom
Electrical Improvements
Cafeteria Acoustics

Groundwater Control & Drainage


Exterior Glass and Masonry Repair
Flooring, Wall, & Ceiling Upgrades
Air Conditioning Repairs

MJSH

MJSH

MJSH

Locker Room Storm Shelter


Fire and Smoke Alarm Improvements
Building Code and ADA
Improvements
Auditorium Stage Improvements

Three Classrooms
Two Science Lab Classrooms
Two Science Classrooms
Science Prep/Storage Room
Two-Court Competition Gym/Physical
Education/Activity Center
Weight Room (Storm Shelter)
Wrestling Room (Storm Shelter)
Boys Locker Room Improvements
Girls Locker Room (Storm Shelter)
Electrical Improvements

Groundwater Control & Drainage


Exterior Glass and Masonry Repair
Flooring, Wall, & Ceiling Upgrades
Large Publicly Accessible Toilet
Rooms
Senior High Window Replacement
Toilet Room Renovations
Senior High Plumbing Replacement

MES

Master Facilities Plan Big Picture, Long Range Plan


Elementary School
Storm Shelter/Locker Rooms and Classrooms to the North of the existing gym
Future expansion could include adding a second floor above the cafeteria
Junior/Senior High
Classrooms in the existing High School Gym
New physical education center/competition gym located immediately to the West of existing Junior High Gym
New Agriculture Education classrooms, shop, and greenhouse immediately to the South of the new physical
education center/competition gym
Removal of metal buildings and addition of parking areas