Activity Expected Time Activity Variance: A+4 M+B B A
Activity Expected Time Activity Variance: A+4 M+B B A
Activity Expected Time Activity Variance: A+4 M+B B A
Activity
Expected Time
Activity Variance
a+4 m+ b
6
ba
6
( )
4
9
1
9
1
9
1
9
1
9
4
9
1
4
3
a.
A(3)
3
3
C(2)
D(3)
3
0
0
B(2)
2
2
2
2
6
6
E(5)
7
9
5
5
7
7
10
11
7
7
F(4)
G(4)
11
11
11
11
H(4)
15
15
b. B-E-G-H
c. 15 days
d. Total variance is 3,61
the equation is
Z=
1615
=0.8
3.61
A(2)
6
10
B(4)
C(8)
E(7)
13
13
13
Normal
time
(weeks)
Normal
cost
Crash
time
(weeks)
Crash
cost
2
4
8
6
7
4
5
$50
$80
$70
$60
$100
$40
$100
1
2
4
5
6
3
4
$70
$160
$110
$80
$130
$100
$150
b. A-B-E-G
13
D(6)
F(4)
12
13
G(5)
18
18
13
c.
Activi
ty
A
B
C
D
E
F
G
Cost per
week
CC NC
NT CT
$20
$40
$10
$20
$30
$60
$50
Number
of days
activity
maybe
shortene
d
1
2
4
1
1
1
1
4
,B
2
,A
$
5
$
8
8
,
$
7
7
,
5
,
$
1
6
,
$
Critical path A-B-E-G = 18 days 6
D
4
,
F
$
1
$
4
Total for 13 weeks = $510, the reduce is A,B,E,G
Total for 14 weeks = $460, the reduce is A,B,E
Total for 15 weeks = $430, the reduce is A,B
Total for 16 weeks = $410, the reduce is B
Total for 17 weeks = $350, the reduce is A
Total for 18 weeks = $330, because it is a normal days for complete