Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

IS O

&

9 0 0 1 , IS O 1 4 0 0 1
O H S A S 1 8 0 0 1

R E G IS T E R E D
F IR M

Emirates NBD Variable Work


Quotation

To be approved
by ENBD

Work Order #:
Name of Work
Requester:
Date of Work Request:

Mr. Procurement (Security) Mahmoud Hawawreh

ENBD Department:

Facilities

Legacy:

Emirates Islamic

Imdaad LLC
Reference:

27/07/2015

ENBD-MAR-15-

Location of Work/
SHJ SJB BR / Crystal Plaza building
Equipment Number:
Description of Work Required:
Conduit & cabling scope for installing Access Control system

Details of work/Remarks

S
Description
N
1 Conduit & cabling scope for installing Access Control system
The quote is given for above mentioned work only.
Expected Delivery time:
Amount in Words: Two thousand seven hundred
dirhams only
Estimator
Signature:
Name:
Checked by
Signature:
AFM:
Authorised By
Ramachandran
Signature:
Facility
Kunjithapatham

Qty

Amt.

LS

AED:
Date:

04/03/2015

Date:

04/03/2015

Date:

04/03/2015

Notes to Customer:
All works as per this estimate will be charged as per our contractual requirement. Any extra works required will be subject to a further estimate approval.
This quotation is valid for 30 days. If you wish Imdaad LLC to proceed with the works as per this estimate, please complete the authorisation section below
and forward to Imdaad LLC, PO Box 18220 Dubai, Telephone 800 8200,
SPECIAL CONDITIONS....

Declaration of Customer

I hereby declare that I am authorised by the above company to approve the charges identified herein in connection with the requested work and that all
invoices related to this estimate shall be paid by the company. I hereby authorise Imdaad LLC to proceed with the works as detailed above.

Company
Stamp

Cost

Approved by Works Requester:

Centre to be Charged:
Name ..
Signature..

Job Completion
Requester Appr.
RISK
ASSESSMENT

Date

Signature:
Generic Risk
Assessment
Available

Date:
Specific Risk Assessment
Completed as New building /
work task

Imdaad LLC Ref:

New Risk Assess


Ref NO: - ..

Initials:
JFE 001

ISSUE 01

08-09-2015

IS O
&

9 0 0 1 , IS O 1 4 0 0 1
O H S A S 1 8 0 0 1

R E G IS T E R E D
F IR M

Emirates NBD Variable Work Quotation

Imdaad LLC Ref:

Initials:
JFE 001

ISSUE 01

08-09-2015

You might also like