Start

Date

End
Date

3.8.15

3.8.15

4.8.15
7.8.15

11.8.1
5

11.8.1
5
12.8.1
5
13.8.1
5

Event

Cold spread test

Scre
w
Spee
d
rpm

Results

460
590
780

Filmed from inside furnace

Boiler started on nat Gas


Boiler on nat gas

Unable to fire on biomass due to ESP problem

Boiler burning biomass

Exporting steam

Pneumatic spreader trial start


Online Cleaning on site for filming of
furnace
Trial resumed & feed rate increased

450

Comments

Lump breaker tripping above 450 and unit running hot

No steam export

Trial abandoned for the day


Operating temperature within design

900

Lumps of biomass observed going into furnace and collecting at


SE side of furnace. Lump breaker tripped due to O/L

350
Trial & filming continued at reduced
screw speed
Online Cleaning on site & trial resumed

14.8.1
5

15.8.1
5
17.8.1
5
18.8.1
5
21.8.1
5

17.8.1
5
18.8.1
5
21.8.1
5

21.8.1
5

24.8.1
5

24.8.1
5

Pneumatic Spreader blockage


Trial resumed and unit observed for
blockage
Normal operation resumed and same
load as mechanical spreaders
Lump breaker tested at higher screw
speeds
Weekend operation

On-line cleaning on site


09.45 furnace filmed prior to trial.
10.35 furnace filmed prior to trial
10.45 11.55 furnace filmed for trial

25.8.1
5

O/L issue rectified


1000
1200
1450
600
450

Biomass discharging into furnace with no issues, lumps present


Biomass hitting back wall of furnace at increased speed
As above
Feed maintained
Internal flap position slipped resulting in obstruction & blockage

300

No further blockages

450

Biomass feeding with no issues

750
900
1050
450

450
450
1050

14.15 furnace filmed

450

Dublix on site
Holes drilled on side of Pneumatic

450

No further issues with lump breaker

No operational issues

SW corner fluidisation poor. Windbox pressure increased from


615mm - 650mm WG
Slight fluidisation improvement
Increased screw speed
Lumps observed falling into centre of bed
Unable to obtain clear image of bed
Screw returned to normal speed
Internal surfaces of spreader clean. Lumps of biomass observed

Blockage cleared and flap position fixed

spreader for endoscope insertion


27.8.1
5

On-line cleaning on site


10.30-11.00 furnace filmed

750

14.30-15.00 furnace filmed

450

Windbox 700mmWG for 24 hours prior to trial


Spread pattern observed & lumps observed
Concentrated on mechanical spreader and good spreading
observed

Biomass availability low & limiting


screw speed