Load Case
Description
Earthquake Load, QE
1
2
3
3a
3b
3c
3d
3e
3f
3g
3h
3i
3j
4
5
6
7
8
9
10
11
EQX
EQZ
Gk
DLsw
DLflpl
DLfn
DLeq1
DLeq2
DLcr
DLct
DLp
DLpg
DLfpr
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Pfluoy
Phydro
Notes:
Numbers , Basic Load Case Names and Descriptions will be used to generate Load Combinations see next
* Considering Global axis acting on either longitudinal or transverse
direction depending on the orientation of the structure
**DLp1, DLp2, DLp3DLpn depending on the number of pipes
***Considering local axis acting on either longitudinal or transverse
direction depending on the orientation of the structure
Definitions
Live load due to personnel, temp. wall,etc.
Floors/Platforms (if not included in the model)
TRUCTURES
References
EN 1991-1-1-2001
EN 1991-1-1-2001
EN 1991-1-1-2001
Sec. 3.2.1.2; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.1.2; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.1.1; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.1.4; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.1.3; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.7; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.16; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.2; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.21; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.21; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.21; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.21; MFD-GEN-FWK-CX-7880-0004-001
Sec. 3.2.5; MFD-GEN-FWK-CX-7880-0004-001
Primary Loads
Earthquake
Loads, QE
1
No.
Title
Seismic Seismic
Load at X- Load at Zdirection* direction*
EQX
EQZ
Dead
Loads, Gk
Imposed
Loads, QI
All Dead
Loads
Gk
Sand/S
now, Qs
Wind Loads, QW
5
WLSx
WLSz
WLPx
Thermal Load, Qt
Piping Loads, Qp
Wind
Wind
Live load
Wind
Wind
Structure - Structure due to
Piping - x- Piping - zxzpersonnel,
direction** direction**
direction** direction**
etc.
*
*
*
*
LL
Rain,
QR
WLPz
10
Piping
Normal
Fluids at Y
direction
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Piping
Normal
Fluids at
X,Z
direction
#N/A
#N/A
#N/A
#N/A
#N/A
Pfluoxz
Pfluoy
I.
ULS
1.35
1.5
1.5
1.5
102
ULS
1.35
1.5
-1.5
1.5
ULS
1.35
1.5
0.75
0.75
1.5
1.5
104
ULS
1.35
1.5
0.75
0.75
-1.5
1.5
105
ULS
1.35
1.5
-0.75
-0.75
1.5
1.5
106
ULS
1.35
1.5
-0.75
-0.75
-1.5
1.5
107
ULS
1.35
1.5
0.75
0.75
1.5
1.5
108
ULS
1.35
1.5
0.75
0.75
-1.5
1.5
109
ULS
1.35
1.5
-0.75
-0.75
1.5
1.5
110
ULS
10
1.35
1.5
-0.75
-0.75
-1.5
1.5
111
ULS
11
1.35
1.5
0.64
1.5
1.5
0.64
0.64
0.64
112
ULS
12
1.35
1.5
0.64
0.64
0.64
0.64
-1.5
1.5
113
ULS
13
1.35
1.5
0.64
-0.64
0.64
-0.64
1.5
1.5
114
ULS
14
1.35
1.5
0.64
-0.64
0.64
-0.64
-1.5
1.5
115
ULS
15
1.35
1.5
-0.64
0.64
-0.64
0.64
1.5
1.5
116
ULS
16
1.35
1.5
-0.64
0.64
-0.64
0.64
-1.5
1.5
117
ULS
17
1.35
1.5
-0.64
-0.64
-0.64
-0.64
1.5
1.5
118
ULS
18
1.35
1.5
-0.64
-0.64
-0.64
-0.64
-1.5
1.5
ULS
19
1.35
1.05
1.5
1.5
1.05
1.05
120
ULS
20
1.35
1.05
1.5
1.5
-1.05
1.05
121
ULS
20
1.35
1.05
-1.5
-1.5
1.05
1.05
122
ULS
22
1.35
1.05
-1.5
-1.5
-1.05
1.05
123
ULS
23
1.35
1.05
1.5
1.5
1.05
1.05
124
ULS
24
1.35
1.05
1.5
1.5
-1.05
1.05
125
ULS
25
1.35
1.05
-1.5
-1.5
1.05
1.05
126
ULS
26
1.35
1.05
-1.5
-1.5
-1.05
1.05
127
ULS
27
1.35
1.05
1.06
1.06
1.06
1.06
1.05
1.05
128
ULS
28
1.35
1.05
1.06
1.06
1.06
1.06
-1.05
1.05
129
ULS
29
1.35
1.05
1.06
-1.06
1.06
-1.06
1.05
1.05
130
ULS
30
1.35
1.05
1.06
-1.06
1.06
-1.06
-1.05
1.05
131
ULS
31
1.35
1.05
-1.06
1.06
-1.06
1.06
1.05
1.05
132
ULS
32
1.35
1.05
-1.06
1.06
-1.06
1.06
-1.05
1.05
133
ULS
33
1.35
1.05
-1.06
-1.06
-1.06
-1.06
1.05
1.05
134
ULS
34
1.35
1.05
-1.06
-1.06
-1.06
-1.06
-1.05
1.05
ULS
35
1.5
1.5
136
ULS
36
-1.5
-1.5
137
ULS
37
1.5
1.5
138
ULS
38
-1.5
-1.5
139
ULS
39
1.06
1.06
1.06
1.06
140
ULS
40
1.06
-1.06
1.06
-1.06
141
ULS
41
-1.06
1.06
-1.06
1.06
142
ULS
42
-1.06
-1.06
-1.06
-1.06
ULS
43
0.3
1.35
144
ULS
44
0.3
1.35
-1
145
ULS
45
-0.3
1.35
146
ULS
46
-0.3
1.35
-1
147
ULS
47
-1
0.3
1.35
148
ULS
48
-1
0.3
1.35
-1
149
ULS
49
-1
-0.3
1.35
150
ULS
50
-1
-0.3
1.35
-1
151
ULS
51
0.3
1.35
152
ULS
52
0.3
1.35
-1
153
ULS
53
-0.3
1.35
154
ULS
54
-0.3
1.35
-1
155
ULS
55
0.3
-1
1.35
156
ULS
56
0.3
-1
1.35
-1
157
ULS
57
-0.3
-1
1.35
All other
Accompanying
Loads, Qk
11
Hydro Test
Load
#N/A
Phydro
#N/A
Primary Loads
Earthquake
Loads, QE
1
No.
Title
Seismic Seismic
Load at X- Load at Zdirection* direction*
EQX
EQZ
Dead
Loads, Gk
Imposed
Loads, QI
Wind Loads, QW
5
Sand/S
now, Qs
Rain,
QR
10
Thermal Load, Qt
11
Wind
Wind
Piping
Piping
Live load
Wind
Wind
Structure - Structure Normal Normal
due to
Piping - x- Piping - zHydro Test
xzFluids at Fluids at
personnel,
direction** direction**
Load
direction** direction**
X,Z
Y
etc.
*
*
*
*
direction direction
All Dead
Loads
Gk
LL
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Pfluoy
Phydro
Piping Loads, Qp
12
13
Hydro Test
Load
Hydro Test
Load
Phydro
Phydro
14
15
16
ULS
101
ULS
102
ULS
102
ULS
3
Gk
Phydro
Phydro
Pfluoxz
Pfluoy
LL
3
Pfluoxz
4
10
Pfluoy
10
ULS
103
ULS
Gk
LL
3
104
ULS
104
ULS
105
ULS
105
ULS
Gk
4
LL
3
Gk
ULS
106
ULS
Gk
ULS
107
ULS
ULS
108
ULS
109
ULS
109
ULS
ULS
10
110
ULS
10
6
WLSx
WLSz
5
Pfluoxz
WLPz
WLPx
6
WLPz
7
10
Pfluoy
9
Pfluoxz
10
Pfluoy
Pfluoxz
8
10
Pfluoy
WLSz
4
Pfluoxz
WLPz
10
Pfluoy
WLSz
LL
3
WLPz
6
Pfluoxz
8
WLSz
LL
Gk
WLPz
10
Pfluoy
10
Pfluoy
Pfluoxz
WLSz
LL
Gk
LL
Gk
Pfluoxz
WLPx
110
Pfluoy
9
WLPx
LL
Gk
Pfluoxz
7
WLSx
4
3
108
3
107
WLPx
WLSx
LL
3
106
WLSx
18
19
20
Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test
Load
Load
Load
Load
Load
Load
Load
I.
101
17
10
Pfluoy
10
Phydro
Phydro
Phydro
Phydro
Phydro
21
22
23
Hydro Test
Load
Hydro Test
Load
Hydro Test
Load
Phydro
Phydro
Phydro
111
ULS
11
111
ULS
11
Gk
LL
3
112
ULS
12
112
ULS
12
Gk
4
LL
3
113
ULS
13
113
ULS
13
114
ULS
14
114
ULS
14
Gk
ULS
15
ULS
15
Gk
3
116
ULS
16
116
ULS
16
Gk
4
LL
3
117
ULS
17
117
ULS
17
118
ULS
18
118
ULS
18
Gk
6
WLSz
10
Pfluoy
9
Pfluoxz
10
Pfluoy
Pfluoxz
WLPz
10
Pfluoy
Pfluoxz
WLPz
WLPx
10
Pfluoy
Pfluoxz
WLPz
WLPx
10
Pfluoy
Pfluoxz
WLPz
WLPx
WLSz
WLSx
10
Pfluoy
Pfluoxz
WLPz
WLPx
WLSz
WLSx
LL
Pfluoy
Pfluoxz
WLPz
WLPx
WLSz
WLSx
LL
Gk
Pfluoxz
WLPz
WLPx
WLSz
WLSx
WLPz
WLPx
WLSz
WLSx
LL
WLPx
WLSz
WLSx
LL
3
115
WLSx
LL
Gk
WLSz
5
115
WLSx
10
Pfluoy
10
ULS
119
ULS
19
119
ULS
19
Gk
LL
3
120
ULS
20
120
ULS
20
Gk
4
LL
3
121
ULS
21
121
ULS
21
Gk
ULS
22
122
ULS
22
LL
3
123
ULS
23
123
ULS
23
Gk
LL
3
124
ULS
24
124
ULS
24
Gk
ULS
25
125
ULS
25
Gk
WLPz
WLSz
WLPz
6
WLSz
Pfluoxz
WLPz
Pfluoxz
10
Pfluoy
9
Pfluoxz
10
Pfluoy
10
Pfluoy
4
LL
Pfluoxz
10
Pfluoy
WLPx
WLSz
LL
Pfluoxz
3
125
10
Pfluoy
WLPx
WLSx
Pfluoxz
WLSx
Pfluoy
WLPx
Pfluoxz
WLSx
LL
Gk
WLPx
3
122
WLSx
10
Pfluoy
3
126
ULS
26
126
ULS
26
Gk
4
LL
3
127
ULS
27
127
ULS
27
Gk
ULS
28
LL
128
ULS
28
Gk
129
ULS
29
129
ULS
29
Gk
ULS
30
130
ULS
30
ULS
31
131
ULS
31
Gk
ULS
32
132
ULS
32
Gk
ULS
33
133
ULS
33
Gk
ULS
34
134
ULS
34
WLSx
LL
Gk
WLSx
LL
WLPx
WLSz
WLSx
WLPx
WLSz
Pfluoxz
WLPz
WLPx
Pfluoxz
WLPz
ULS
35
135
ULS
35
Gk
WLSx
3
136
ULS
36
136
ULS
36
Gk
ULS
37
137
ULS
37
WLSx
3
137
WLPx
WLPx
Gk
7
WLSz
3
138
ULS
38
138
ULS
38
Gk
ULS
39
139
ULS
39
Gk
WLSz
3
139
WLPz
WLPz
6
WLSx
WLSz
8
WLPx
WLPz
10
Pfluoy
9
Pfluoxz
10
Pfluoy
10
Pfluoy
Pfluoxz
WLPz
10
Pfluoy
Pfluoxz
WLPz
10
Pfluoy
WLPx
WLSz
Pfluoxz
WLPz
10
Pfluoy
WLPx
WLSz
Pfluoxz
WLPz
10
Pfluoy
3
134
WLSx
LL
WLPx
WLSz
Pfluoxz
WLPz
10
Pfluoy
3
133
WLSx
LL
WLPx
WLSz
Pfluoxz
WLPz
3
132
WLSx
LL
WLPx
WLSz
3
131
WLSx
LL
Gk
WLSz
3
130
WLSx
LL
WLPz
WLSz
3
128
10
Pfluoy
10
3
140
ULS
40
140
ULS
40
Gk
WLSx
3
141
ULS
41
141
ULS
41
ULS
42
142
ULS
42
WLSz
Gk
WLSx
3
142
WLSz
WLSx
WLPx
Gk
8
WLPz
7
WLPx
8
WLPz
WLPx
WLSz
8
WLPz
ULS
143
ULS
26
143
ULS
26
EQX
EQX
1
144
ULS
26
144
ULS
26
EQX
1
EQX
1
145
ULS
26
145
ULS
26
EQX
ULS
26
146
ULS
26
ULS
28
147
ULS
28
EQX
EQX
148
ULS
26
148
ULS
26
EQX
1
149
ULS
29
149
ULS
29
EQX
ULS
26
150
ULS
26
EQX
ULS
30
151
ULS
30
EQX
ULS
26
152
ULS
26
EQX
ULS
31
153
ULS
31
EQX
Gk
EQX
EQX
Gk
Pfluoxz
LL
LL
Pfluoxz
10
Pfluoy
9
Pfluoxz
10
Pfluoy
10
Pfluoy
3
Gk
Pfluoxz
LL
10
Pfluoy
Pfluoxz
LL
10
Pfluoy
1
153
Gk
EQX
Pfluoxz
LL
10
Pfluoy
1
152
Gk
EQX
Pfluoxz
LL
10
Pfluoy
1
151
Gk
EQX
Pfluoxz
LL
10
Pfluoy
1
150
Gk
EQX
Pfluoxz
LL
10
Pfluoy
Pfluoxz
LL
Gk
Pfluoy
LL
Gk
EQX
Pfluoxz
1
147
Gk
EQX
EQX
LL
1
146
Gk
10
Pfluoy
1
154
ULS
26
154
ULS
26
EQX
1
EQX
1
155
ULS
32
155
ULS
32
EQX
ULS
26
156
ULS
26
EQX
EQX
ULS
33
157
ULS
33
EQX
10
Pfluoy
9
Pfluoxz
10
Pfluoy
Pfluoxz
LL
10
Pfluoy
Pfluoxz
LL
Gk
9
Pfluoxz
LL
Gk
EQX
LL
Gk
EQX
1
157
Gk
1
156
10
Pfluoy
10
All other
Accompanying
Loads, Qk
24
25
Phydro
Phydro
Primary Loads
Earthquake
Loads, QE
1
No.
Title
Imposed
Dead
Loads, Gk Loads, QI
Seismic Seismic
Load at X- Load at Zdirection* direction*
EQX
EQZ
All Dead
Loads
Gk
Sand/S
now, Qs
Wind Loads, QW
5
WLSx
WLSz
WLPx
Thermal Load, Qt
WLPz
All other
Accompanying
Loads, Qk
Piping Loads, Qp
Wind
Wind
Live load
Wind
Wind
Structure - Structure due to
Piping - x- Piping - zxzpersonnel,
direction** direction**
direction** direction**
etc.
*
*
*
*
LL
Rain,
QR
10
Piping
Normal
Fluids at Y
direction
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Hydro
Test Load
Pfluoy
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Phydro
#N/A
#N/A
#N/A
#N/A
#N/A
Piping
Normal
Fluids at
X,Z
direction
#N/A
#N/A
#N/A
#N/A
#N/A
Pfluoxz
11
II.
UTL
1.35
1.05
402
UTL
1.35
1.05
UTL
1.35
0.45
0.45
1.05
404
UTL
1.35
-0.45
-0.45
1.05
405
UTL
1.35
0.45
0.45
1.05
406
UTL
1.35
-0.45
-0.45
1.05
407
UTL
1.35
0.32
0.32
0.32
0.32
1.05
408
UTL
1.35
0.32
-0.32
0.32
-0.32
1.05
409
UTL
1.35
-0.32
0.32
-0.32
0.32
1.05
410
UTL
10
1.35
-0.32
-0.32
-0.32
-0.32
1.05
411
UTL
11
1.35
0.45
0.45
1.05
412
UTL
12
1.35
0.45
0.45
1.05
413
UTL
13
1.35
-0.45
-0.45
1.05
414
UTL
14
1.35
-0.45
-0.45
1.05
415
UTL
15
1.35
0.45
0.45
1.05
416
UTL
16
1.35
0.45
0.45
1.05
417
UTL
17
1.35
-0.45
-0.45
1.05
418
UTL
18
1.35
-0.45
-0.45
1.05
419
UTL
19
1.35
0.32
0.32
0.32
0.32
1.05
420
UTL
20
1.35
0.32
-0.32
0.32
-0.32
1.05
421
UTL
21
1.35
-0.32
0.32
-0.32
0.32
1.05
422
UTL
22
1.35
-0.32
-0.32
-0.32
-0.32
1.05
UTL
23
1.35
1.05
0.75
0.75
424
UTL
24
1.35
1.05
-0.75
-0.75
425
UTL
25
1.35
1.05
0.75
0.75
426
UTL
26
1.35
1.05
-0.75
-0.75
427
UTL
27
1.35
1.05
0.53
0.53
0.53
0.53
428
UTL
28
1.35
1.05
0.53
-0.53
0.53
-0.53
429
UTL
29
1.35
1.05
-0.53
0.53
-0.53
0.53
430
UTL
30
1.35
1.05
-0.53
-0.53
-0.53
-0.53
431
UTL
31
1.35
1.05
0.75
0.75
432
UTL
32
1.35
1.05
0.75
0.75
433
UTL
33
1.35
1.05
-0.75
-0.75
434
UTL
34
1.35
1.05
-0.75
-0.75
435
UTL
35
1.35
1.05
0.75
0.75
436
UTL
36
1.35
1.05
0.75
0.75
437
UTL
37
1.35
1.05
-0.75
-0.75
438
UTL
38
1.35
1.05
-0.75
-0.75
439
UTL
39
1.35
1.05
0.53
0.53
0.53
0.53
440
UTL
40
1.35
1.05
0.53
-0.53
0.53
-0.53
441
UTL
41
1.35
1.05
-0.53
0.53
-0.53
0.53
442
UTL
42
1.35
1.05
-0.53
-0.53
-0.53
-0.53
All other
companying
Loads, Qk
#N/A
#N/A
Primary Loads
Earthquake
Loads, QE
1
No.
Title
Imposed
Dead
Loads, Gk Loads, QI
Seismic Seismic
Load at X- Load at Zdirection* direction*
EQX
EQZ
All Dead
Loads
Gk
Wind Loads, QW
5
Sand/S
now, Qs
Rain,
QR
10
Thermal Load, Qt
11
Wind
Wind
Piping
Piping
Live load
Wind
Wind
Structure - Structure Normal Normal
due to
Piping - x- Piping - zHydro Test
xzFluids at Fluids at
personnel,
direction** direction**
Load
direction** direction**
X,Z
Y
etc.
*
*
*
*
direction direction
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Pfluoy
Phydro
12
Hydro Test
Load
Phydro
All other
Accompanying
Loads, Qk
Piping Loads, Qp
13
14
15
16
17
18
19
20
21
22
23
24
Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test
Hydro
Hydro
Hydro
Load
Load
Load
Load
Load
Load
Load
Load
Load
Test Load Test Load Test Load
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
II.
UTL
401
UTL
402
UTL
402
UTL
Gk
Phydro
11
Gk
Phydro
11
UTL
403
UTL
404
UTL
404
UTL
405
UTL
405
UTL
406
UTL
406
UTL
407
UTL
407
UTL
Gk
WLSx
WLPx
Phydro
11
Gk
WLSx
WLPx
Phydro
11
Gk
WLSz
WLPz
Phydro
11
Gk
WLSz
WLPz
Phydro
408
UTL
408
UTL
409
UTL
409
UTL
410
UTL
10
410
UTL
10
411
UTL
11
11
Gk
WLSx
WLSz
6
WLPx
WLPz
Phydro
11
Gk
WLSx
WLSz
WLPx
WLPz
Phydro
11
Gk
WLSx
WLSz
WLPx
WLPz
Phydro
11
Gk
WLSx
WLSz
WLPx
WLPz
Phydro
Gk
WLSx
WLPx
11
Phydro
411
UTL
11
412
UTL
12
412
UTL
12
413
UTL
13
413
UTL
13
414
UTL
14
414
UTL
14
415
UTL
15
415
UTL
15
416
UTL
16
416
UTL
16
417
UTL
17
417
UTL
17
418
UTL
18
418
UTL
18
419
UTL
19
419
UTL
19
420
UTL
20
420
UTL
20
421
UTL
21
421
UTL
21
422
UTL
22
422
UTL
22
11
Gk
WLSx
WLPx
Phydro
11
Gk
WLSx
WLPx
Phydro
11
Gk
WLSx
WLPx
Phydro
11
Gk
WLSz
WLPz
Phydro
11
Gk
WLSz
WLPz
Phydro
11
Gk
WLSz
WLPz
Phydro
11
Gk
WLSz
WLPz
Phydro
11
Gk
WLSx
WLSz
WLPx
WLPz
Phydro
11
Gk
WLSx
WLSz
WLPx
WLPz
Phydro
11
Gk
WLSx
WLSz
WLPx
WLPz
Phydro
11
Gk
WLSx
WLSz
WLPx
WLPz
Phydro
11
UTL
23
Gk
LL
WLSx
WLPx
LL
WLSx
WLPx
424
UTL
24
Gk
3
425
UTL
25
Gk
LL
WLSz
WLPz
LL
WLSz
WLPz
426
UTL
26
Gk
3
427
UTL
27
Gk
LL
WLSx
WLSz
WLPx
WLPz
Gk
LL
WLSx
WLSz
WLPx
WLPz
428
UTL
28
429
UTL
29
Gk
LL
WLSx
WLSz
WLPx
WLPz
LL
WLSx
WLSz
WLPx
WLPz
430
UTL
30
Gk
3
431
UTL
31
Gk
LL
WLSx
WLPx
LL
WLSx
WLPx
432
UTL
32
Gk
3
433
UTL
33
Gk
LL
WLSx
WLPx
LL
WLSx
WLPx
434
UTL
34
Gk
3
435
UTL
35
Gk
LL
WLSz
WLPz
LL
WLSz
WLPz
436
UTL
36
Gk
3
437
UTL
37
Gk
LL
WLSz
WLPz
LL
WLSz
WLPz
438
UTL
38
Gk
3
439
UTL
39
Gk
LL
WLSx
WLSz
WLPx
WLPz
LL
WLSx
WLSz
WLPx
WLPz
440
UTL
40
Gk
3
441
UTL
41
Gk
LL
WLSx
WLSz
WLPx
WLPz
Gk
LL
WLSx
WLSz
WLPx
WLPz
442
UTL
42
All other
companying
Loads, Qk
25
Hydro
Test Load
Phydro
Primary Loads
Earthquake
Loads, QE
1
No.
Title
EQZ
3a
Rain,
QR
3f
3l
5
6
7
8
9
10
Cranes
Empty
Wind
Wind
Piping
Piping
parked at
Wind
Wind
Seismic Seismic
Equipment Structure - Structure Normal Normal
gable end
Fire
Piping - x- Piping - zLoad at X- Load at Z- Self Weight
Including
xzFluids at Fluids at
without
proofing
direction** direction**
direction* direction*
internals and
direction** direction**
X,Z
Y
any lifting
*
*
fireproofing
*
*
direction direction
load
EQX
Sand/S
now, Qs
Wind Loads, QW
Dead Loads, Gk
DLsw
3e
DLeq2
DLcr
DLfpr
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Pfluoy
Thermal Load, Qt
11
12
Hydro Test
Load
Hydro Test
Load
Phydro
Phydro
III.
ERL01
1.1
1.35
502
ERL02
1.1
1.35
503
ERL03
1.1
1.35
504
ERL04
1.1
1.35
505
ERL05
1.1
1.35
506
ERL06
1.1
1.35
507
ERL07
1.1
1.35
508
ERL08
1.1
1.35
ERL09
1.1
1.5
510
ERL10
1.1
-1.5
511
ERL11
1.1
1.5
512
ERL12
1.1
-1.5
513
ERL13
1.1
1.06
1.06
514
ERL14
1.1
1.06
-1.06
515
ERL15
1.1
-1.06
1.06
516
ERL16
1.1
-1.06
-1.06
Piping Loads, Qp
13
14
15
16
17
18
19
20
21
22
23
Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test
Hydro
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
Test Load
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
ERL17
0.9
0.9
0.9
0.9
1.5
518
ERL18
0.9
0.9
0.9
0.9
-1.5
519
ERL19
0.9
0.9
0.9
0.9
1.5
520
ERL20
0.9
0.9
0.9
0.9
-1.5
521
ERL21
0.9
0.9
0.9
0.9
1.06
1.06
522
ERL22
0.9
0.9
0.9
0.9
1.06
-1.06
523
ERL23
0.9
0.9
0.9
0.9
-1.06
1.06
524
ERL24
0.9
0.9
0.9
0.9
-1.06
-1.06
All other
Accompanying
Loads, Qk
24
25
Hydro
Hydro
Test Load Test Load
Phydro
Phydro
Primary Loads
Earthquake
Loads, QE
1
No.
Title
EQZ
3a
Rain,
QR
3f
3l
5
6
7
8
9
10
Cranes
Empty
Wind
Wind
Piping
Piping
parked at
Wind
Wind
Seismic Seismic
Equipment Structure - Structure Normal Normal
gable end
Fire
Piping - x- Piping - zLoad at X- Load at Z- Self Weight
Including
xzFluids at Fluids at
without
proofing
direction** direction**
direction* direction*
internals and
direction** direction**
X,Z
Y
any lifting
*
*
fireproofing
*
*
direction direction
load
EQX
Sand/S
now, Qs
Wind Loads, QW
Dead Loads, Gk
DLsw
3e
DLeq2
DLcr
DLfpr
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Pfluoy
Thermal Load, Qt
11
12
Hydro Test
Load
Hydro Test
Load
Phydro
Phydro
III.
ERL01
DLsw
Phydro
3a
11
Phydro
502
ERL02
DLsw
3a
11
503
ERL03
DLsw
Phydro
3a
11
Phydro
504
ERL04
DLsw
3a
11
505
ERL05
DLsw
Phydro
3a
11
Phydro
506
ERL06
DLsw
3a
11
507
ERL07
DLsw
Phydro
3a
11
DLsw
Phydro
3a
11
508
ERL08
ERL09
DLsw
WLSx
3a
510
ERL10
DLsw
WLSx
3a
511
ERL11
DLsw
WLSz
3a
6
WLSz
512
ERL12
DLsw
513
ERL13
DLsw
WLSx
WLSz
3a
WLSx
WLSz
3a
514
ERL14
DLsw
3a
515
ERL15
DLsw
WLSx
WLSz
3a
DLsw
WLSx
WLSz
516
ERL16
Piping Loads, Qp
13
14
15
16
17
18
19
20
21
22
23
Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test
Hydro
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
Test Load
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
3a
ERL17
DLsw
DLeq2
DLcr
DLfpr
WLSx
3a
3e
3f
3l
518
ERL18
DLsw
DLeq2
DLcr
DLfpr
WLSx
3a
3e
3f
3l
DLeq2
DLcr
DLfpr
519
ERL19
DLsw
WLSz
3a
3e
3f
3l
520
ERL20
DLsw
DLeq2
DLcr
DLfpr
WLSz
3a
3e
3f
3l
DLeq2
DLcr
DLfpr
521
ERL21
DLsw
WLSx
WLSz
3a
3e
3f
3l
522
ERL22
DLsw
DLeq2
DLcr
DLfpr
WLSx
WLSz
3a
3e
3f
3l
DLeq2
DLcr
DLfpr
WLSx
WLSz
523
ERL23
DLsw
3a
3e
3f
3l
524
ERL24
DLsw
DLeq2
DLcr
DLfpr
WLSx
WLSz
All other
Accompanying
Loads, Qk
24
25
Hydro
Hydro
Test Load Test Load
Phydro
Phydro
Primary Loads
Earthquake
Loads, QE
1
No.
Title
Seismic Seismic
Load at X- Load at Zdirection* direction*
EQX
EQZ
Imposed
Dead
Loads, Gk Loads, QI
3
All Dead
Loads
Gk
Sand/S
now, Qs
Wind Loads, QW
WLSx
WLSz
WLPx
Thermal Load, Qt
Piping Loads, Qp
Wind
Wind
Live load
Wind
Wind
Structure - Structure due to
Piping - x- Piping - zxzpersonnel,
direction** direction**
direction** direction**
etc.
*
*
*
*
LL
Rain,
QR
WLPz
10
Piping
Normal
Fluids at Y
direction
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Piping
Normal
Fluids at
X,Z
direction
#N/A
#N/A
#N/A
#N/A
#N/A
Pfluoxz
Pfluoy
SERVICEABILITY
IV.
SLS
202
SLS
-1
SLS
204
SLS
-1
-1
-1
205
SLS
206
SLS
-1
207
SLS
-1
-1
208
SLS
-1
-1
-1
209
SLS
0.5
0.5
0.5
0.5
210
SLS
10
0.5
0.5
0.5
0.5
-1
211
SLS
11
0.5
-0.5
0.5
-0.5
212
SLS
12
0.5
-0.5
0.5
-0.5
-1
213
SLS
13
-0.5
0.5
-0.5
0.5
214
SLS
14
-0.5
0.5
-0.5
0.5
-1
215
SLS
15
-0.5
-0.5
-0.5
-0.5
216
SLS
16
-0.5
-0.5
-0.5
-0.5
-1
SLS
17
0.7
0.21
218
SLS
18
0.7
0.21
-1
219
SLS
19
0.7
-0.21
220
SLS
20
0.7
-0.21
-1
221
SLS
21
-0.7
0.21
222
SLS
22
-0.7
0.21
-1
223
SLS
23
-0.7
-0.21
224
SLS
24
-0.7
-0.21
-1
225
SLS
25
0.21
0.7
226
SLS
26
0.21
0.7
-1
227
SLS
27
-0.21
0.7
228
SLS
28
-0.21
0.7
-1
229
SLS
29
0.21
-0.7
230
SLS
30
0.21
-0.7
-1
231
SLS
31
-0.21
-0.7
All other
Accompanying
Loads, Qk
#N/A
#N/A
#N/A
#N/A
Primary Loads
Earthquake
Loads, QE
1
No.
Title
Seismic Seismic
Load at X- Load at Zdirection* direction*
EQX
EQZ
Imposed
Dead
Loads, Gk Loads, QI
3
All Dead
Loads
Gk
Sand/S
now, Qs
Wind Loads, QW
WLSx
WLSz
WLPx
Thermal Load, Qt
Piping Loads, Qp
Wind
Wind
Live load
Wind
Wind
Structure - Structure due to
Piping - x- Piping - zxzpersonnel,
direction** direction**
direction** direction**
etc.
*
*
*
*
LL
Rain,
QR
WLPz
15
#N/A
#N/A
#N/A
#N/A
#N/A
Piping
Normal
Fluids at
X,Z
direction
#N/A
#N/A
#N/A
#N/A
#N/A
Pfluoxz
Phydro
Pfluoxz
Phydro
SLS
201
SLS
202
SLS
202
SLS
Gk
LL
10
Gk
LL
Pfluoxz
Phydro
10
Pfluoxz
Phydro
SLS
203
SLS
204
SLS
204
SLS
205
SLS
205
SLS
206
SLS
206
SLS
207
SLS
207
SLS
208
SLS
208
SLS
209
SLS
209
SLS
210
SLS
10
210
SLS
10
211
SLS
11
Gk
LL
WLSx
WLPx
17
18
19
20
Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test Hydro Test
Load
Load
Load
Load
Load
Load
SERVICEABILITY
IV.
16
10
Gk
LL
WLSx
WLPx
Pfluoxz
Phydro
10
Gk
LL
WLSz
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSz
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSz
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSz
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Phydro
Phydro
Phydro
Phydro
Phydro
Phydro
21
22
23
Hydro Test
Load
Hydro Test
Load
Hydro Test
Load
Phydro
Phydro
Phydro
211
SLS
11
212
SLS
12
212
SLS
12
213
SLS
13
213
SLS
13
214
SLS
14
214
SLS
14
215
SLS
15
215
SLS
15
216
SLS
16
216
SLS
16
10
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Phydro
10
Gk
LL
WLSx
WLSz
WLPx
WLPz
Pfluoxz
Phydro
10
All other
Accompanying
Loads, Qk
24
25
Phydro
Phydro
2 PIPES
Pipes 300mm (As 0.5kN/m2)
Pipes 300 < d < 400mm ** (As >0.8kN/m2)
Pipes > 300mm
Value
3.8m/s2
1.0 m/s2
1.75
2.95
0.086
0.432
4.5 m/s2
1.9 m/s2