Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

AIR LEAKAGES CHECKING REPORT

Sr. No.
1
2
3
4
5
6
7
8
9
10
11
12
13

M/c No.

Type of Leakages

Xeni no.1
Flexiclean no.1
Xeni no.2
Flexiclean no.3
card no.15
Card no.18,5
Card no.10,4
Card no.6
Comber no.2, 4
LDO6 no.3,4,5
Near Unimix-2
Near Lapformer-3
Near s/f no.2

Air regulator connector


Pressure switch connector
Air regulator connector
Solinoid valve connector
Solinoid valve connector
pnumatic connector
Elbow connector&regulator
piston cylinder
pnumatic connector
pnumatic connector
Trench air pipe-1/2"conn.
Trench air pipe-1/2"conn.Joint
Major valve leak in Trench

CHECKING REPORT
Dept.
Electrical
Electrical
Electrical
Electrical
Electrical
maintenance
maintenance
maintenance
maintenance
maintenance
Engg.
Engg.
Engg.

Checked
Date
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015
7.9.2015

Attended
Date
8.9.2015
8.9.2015
8.9.2015
8.9.2015

Remarks.

CLG. TIME
8.9.2015
8.9.2015
CLG. TIME
8.9.2015
8.9.2015
8.9.2015
8.9.2015
8.9.2015

You might also like