LOADING RAMP & HOPPERS
Mill Capacity
Minimum Storage Period
Capacity of each cage
Bulk Density Of FFB
Capacity Per Door Of Loading Ramp
Number of loading ramps / hoppers
Loading Ramp Slab: Length
Width
Assume Average storage depth
Operating period
Choose number of loading doors
Number of doors required
Total storage required
Storage in the ramp / hopper
Storage on slab
Storage in cages
Nr.of cages required (Minimum)
Number of Loading Ramps with Hoppers
GIVEN DATA
AstPh 2nd Ph
45 90 mtFFB/hr
12 hr
7 Tonnes FFB
480 kg/m?
15 Tonnes
12 24 Nr.
nla m
nla m
0.45 m
24 hriday
2 doors per bay
24 48 Nr.
CALCULATE
540 1,080 tonnes
180 360 tonnes
0 0 tonnes
360 720 tonnes
51 103 Nos
12 24 ON