1. The document is a layout design check sheet that contains 15 items to confirm regarding the proper placement and setup of equipment and structures.
2. Key items to confirm include the space for walking under penstocks, the setting levels of oil pumps and tanks relative to oil strata, ensuring no equipment is placed on construction joints or in the direction of exhaust pipes, and confirming the flow system for ditch water.
3. The checklist also includes confirming no interference between equipment and sufficient maintenance space around equipment.
1. The document is a layout design check sheet that contains 15 items to confirm regarding the proper placement and setup of equipment and structures.
2. Key items to confirm include the space for walking under penstocks, the setting levels of oil pumps and tanks relative to oil strata, ensuring no equipment is placed on construction joints or in the direction of exhaust pipes, and confirming the flow system for ditch water.
3. The checklist also includes confirming no interference between equipment and sufficient maintenance space around equipment.
1. The document is a layout design check sheet that contains 15 items to confirm regarding the proper placement and setup of equipment and structures.
2. Key items to confirm include the space for walking under penstocks, the setting levels of oil pumps and tanks relative to oil strata, ensuring no equipment is placed on construction joints or in the direction of exhaust pipes, and confirming the flow system for ditch water.
3. The checklist also includes confirming no interference between equipment and sufficient maintenance space around equipment.
1. The document is a layout design check sheet that contains 15 items to confirm regarding the proper placement and setup of equipment and structures.
2. Key items to confirm include the space for walking under penstocks, the setting levels of oil pumps and tanks relative to oil strata, ensuring no equipment is placed on construction joints or in the direction of exhaust pipes, and confirming the flow system for ditch water.
3. The checklist also includes confirming no interference between equipment and sufficient maintenance space around equipment.
4 Confirm the space for walking under the penstock.
5 Consider the floor opening for long stem valve and space for using handle. 6 Confirm the thrust lift up system setting level. (under the oil stratum level or not) 7 Confirm the oil pump setting level. (under the each oil stratum level or not) 8 Confrim the No equipment is set on the construction joint. 9 Confirm the setting level of gathering oil tank. (all oil return to oil tank or not) 10 Confirm the double wall of building. 11 Confrim the no equipment is set on direction of exhaust pipe in drain pit. 12 Confirm the setting position of building illumination, emergency exit signs and speaker. 13 Confirm the flow system of ditch water, and ditch water flow into oil - water separater. 14 Confirm the spec of each automatic valve. 15 Confirm the no interference with each equipments and maintenance space for equipment. (e.g. oil pressure cylinder of automatic valve, electric limit torque, and so on.)